WEBVTT

1
00:06:14.596 --> 00:06:17.175
<v Unidentified speaker>My, my script says good morning, but I think it's noon.

2
00:06:17.290 --> 00:06:19.334
<v Unidentified speaker>Technically, yes.

3
00:06:19.399 --> 00:06:23.889
<v Unidentified speaker>So, okay, so I'm going to call the meeting of the Public Works I'll call this committee to order.

4
00:06:24.002 --> 00:06:30.785
<v Unidentified speaker>It's Tuesday, June 9th at noon, and it's not Diego, it's Diana.

5
00:06:31.009 --> 00:06:31.831
<v Unidentified speaker>It's Diana.

6
00:06:32.057 --> 00:06:32.331
<v Unidentified speaker>Sorry.

7
00:06:32.396 --> 00:06:34.151
<v Unidentified speaker>Would you please call the roll?

8
00:06:34.408 --> 00:06:34.764
<v Unidentified speaker>Sure.

9
00:06:35.375 --> 00:06:35.665
<v Unidentified speaker>Kanal?

10
00:06:36.004 --> 00:06:36.117
<v Sameer Kanal>Here.

11
00:06:36.810 --> 00:06:37.358
<v Unidentified speaker>Koyama Lane?

12
00:06:38.196 --> 00:06:38.307
<v Tiffany Koyama Lane>Here.

13
00:06:39.050 --> 00:06:39.452
<v Unidentified speaker>Green?

14
00:06:39.567 --> 00:06:39.889
<v Mitch Green>Here.

15
00:06:40.228 --> 00:06:40.584
<v Unidentified speaker>Smith?

16
00:06:41.892 --> 00:06:42.749
<v Loretta Smith>Here.

17
00:06:44.559 --> 00:06:47.225
<v Unidentified speaker>And Claire, uh, could you please read the statement of conduct?

18
00:06:48.394 --> 00:06:48.935
<v Unidentified speaker>Thank you, Chair.

19
00:06:49.302 --> 00:06:51.769
<v Unidentified speaker>Good afternoon and welcome to the meeting of the Public Works Committee.

20
00:06:52.026 --> 00:07:01.764
<v Unidentified speaker>To testify before this committee in person or virtually, you must sign up in advance on the committee agenda at portland.gov/council/agenda/publicworkscommittee or by calling 311.

21
00:07:02.428 --> 00:07:05.406
<v Unidentified speaker>Registration for virtual testimony closes 1 hour prior to the meeting.

22
00:07:05.923 --> 00:07:08.642
<v Unidentified speaker>In-person testifiers must sign up before the agenda item is heard.

23
00:07:09.161 --> 00:07:13.814
<v Unidentified speaker>If public testimony will be taken on an item, individuals may testify for 3 minutes unless the chair states otherwise.

24
00:07:14.333 --> 00:07:16.110
<v Unidentified speaker>Your microphone will be muted when your time is over.

25
00:07:16.572 --> 00:07:17.471
<v Unidentified speaker>The chair preserves order.

26
00:07:17.600 --> 00:07:24.764
<v Unidentified speaker>Disruptive conduct such as shouting, refusing to conclude your testimony when your time is up, or interrupting others' testimony or committee deliberations will not be allowed.

27
00:07:25.343 --> 00:07:27.108
<v Unidentified speaker>If you cause a disruption, a warning will be given.

28
00:07:27.495 --> 00:07:29.711
<v Unidentified speaker>Further disruption will result in ejection from the meeting.

29
00:07:30.370 --> 00:07:33.165
<v Unidentified speaker>Anyone who fails to leave once ejected is subject to arrest for trespass.

30
00:07:33.839 --> 00:07:36.649
<v Unidentified speaker>Additionally, the committee may take a short recess and reconvene virtually.

31
00:07:37.276 --> 00:07:39.156
<v Unidentified speaker>Your testimony should address the matter being considered.

32
00:07:39.605 --> 00:07:41.437
<v Unidentified speaker>When testifying, please state your name for the record.

33
00:07:41.790 --> 00:07:44.295
<v Unidentified speaker>If you are a lobbyist, identify the organization you represent.

34
00:07:44.762 --> 00:07:48.199
<v Unidentified speaker>And finally, virtual testifiers should unmute themselves when the clerk calls your name.

35
00:07:48.456 --> 00:07:48.874
<v Unidentified speaker>Thank you.

36
00:07:49.324 --> 00:07:50.898
<v Unidentified speaker>Thank you, Claire.

37
00:07:51.444 --> 00:08:02.992
<v Unidentified speaker>So colleagues, today we have a much shorter agenda than usual, um, due to a variety of limitations, but our discussion today really centers on I-5, uh, the Rose Quarter Improvement Project.

38
00:08:03.699 --> 00:08:07.747
<v Unidentified speaker>Um, so, uh, Diana, would you please call this— read this item?

39
00:08:08.694 --> 00:08:10.076
<v Unidentified speaker>Item number 1, doc—.

40
00:13:45.157 --> 00:13:48.250
<v Unidentified speaker>$382 Million in RCN grant funding.

41
00:13:48.844 --> 00:13:55.832
<v Unidentified speaker>In May, June, and July, we are going through STIP and MTIP update process and amendments.

42
00:13:56.619 --> 00:14:12.120
<v Unidentified speaker>The OTC did approve the STIP amendment in May, and we've started the MTIP process last week with Metro's TPAC, JPAC, and council presentations in June and vote in June and July.

43
00:14:12.312 --> 00:14:13.995
<v Unidentified speaker>Monica, I'm gonna have to interrupt you right now.

44
00:14:14.059 --> 00:14:17.559
<v Unidentified speaker>I really apologize, but we're having a problem.

45
00:14:17.919 --> 00:14:20.779
<v Unidentified speaker>The broadcasting problem just got resolved.

46
00:14:20.779 --> 00:14:20.779
<v Unidentified speaker>Oh, okay, never mind.

47
00:14:20.779 --> 00:14:21.659
<v Unidentified speaker>So we should be good now.

48
00:14:21.659 --> 00:14:22.559
<v Unidentified speaker>Thank you so much.

49
00:14:22.559 --> 00:14:24.820
<v Unidentified speaker>Apologies for the interruption.

50
00:14:24.820 --> 00:14:33.440
<v Mitch Green>While you've got everyone interrupted, can I make an appeal to maybe clarify some of the acronyms that you're— 'cause I think a lot of folks following along may not necessarily know.

51
00:14:33.440 --> 00:14:33.960
<v Mitch Green>Thanks.

52
00:14:33.960 --> 00:14:43.799
<v Unidentified speaker>Yeah, so the STIP is a Statewide Transportation Improvement Plan, and then Metro has a Metropolitan Transportation Improvement Plan.

53
00:14:43.799 --> 00:14:52.856
<v Unidentified speaker>So our projects Go through both of those approval processes so that they are aligned both at the state level and at the regional level.

54
00:14:53.274 --> 00:15:01.816
<v Unidentified speaker>And with the updates to the scope and funding, we're going through this process to update what is currently programmed in both of those plans.

55
00:15:03.274 --> 00:15:10.149
<v Unidentified speaker>And so for Metro, they have 2 committees and then their Metro Council that we go through both.

56
00:15:10.886 --> 00:15:12.201
<v Unidentified speaker>We call it a 2-touch approach.

57
00:15:12.264 --> 00:15:15.678
<v Unidentified speaker>So we have a presentation first with each one of those.

58
00:15:15.726 --> 00:15:15.839
<v Unidentified speaker>Thank you.

59
00:15:16.017 --> 00:15:21.525
<v Unidentified speaker>Councils, and then a vote in July with eventually with the council final adoption.

60
00:15:24.407 --> 00:15:30.365
<v Unidentified speaker>So then shifting back to construction, we do have the 2 closures scheduled for this summer.

61
00:15:30.462 --> 00:15:42.583
<v Unidentified speaker>The first closure, and we'll dive a lot more detail into these later in the presentation, but the first closure is the 14-hour closure of both directions of I-5 northbound and southbound in the project area.

62
00:15:42.729 --> 00:15:45.405
<v Unidentified speaker>This is a weekend overnight closure in July.

63
00:15:45.455 --> 00:15:57.801
<v Unidentified speaker>And then there is A second closure that we'll mostly focus on today is the 5-week closure, up to 5-week closure of I-5 southbound starting September 11th.

64
00:16:01.379 --> 00:16:15.176
<v Unidentified speaker>So then I mentioned our PMG, or our Project Management Group, and I wanted to provide a little more information on the PMG because as I said in the last slide, the PMG has been instrumental in moving the project forward this year.

65
00:16:16.447 --> 00:16:22.674
<v Unidentified speaker>The PMG is executive-level leadership coordination forum for the Rose Quarter Project.

66
00:16:22.947 --> 00:16:47.349
<v Unidentified speaker>It brings together leadership from ODOT, the project team, the city, Metro, Albina Vision Trust, Oregon Trucking Association, the Blazers, and community members from our Historic Albina Advisory Board and the Community Oversight Advisory Committee so that the project can move forward with greater transparency and alignment and shared understanding.

67
00:16:49.028 --> 00:17:01.599
<v Unidentified speaker>Specifically from the city, I want to highlight the contributions of PBOT Director Williams, Patricia Dierfendorfer from Bureau of Planning and Sustainability, and Amy Nagy from Prosper Portland.

68
00:17:02.909 --> 00:17:17.489
<v Unidentified speaker>Director Wesley from Prosper Portland will be joining the PMG in June, and we look forward to his engagement and discussions on the broader development of the district and the area and how the Rose Quarter project is just one part of that broader development.

69
00:17:19.998 --> 00:17:30.513
<v Unidentified speaker>As I mentioned in the status update, the primary focus of the project management group in January through April was getting alignment on the scope of Phase 1B and 1C.

70
00:17:31.075 --> 00:17:47.778
<v Unidentified speaker>And then starting in April and May, we began a deeper conversation on funding strategy, aligned partner messaging, and outreach so the project can stay coordinated as we seek funding for the remainder of the work to complete the project in full.

71
00:17:49.012 --> 00:17:53.452
<v Unidentified speaker>Assisting the PMG Thank you, Councilor Herbold.

72
00:17:53.532 --> 00:18:01.003
<v Unidentified speaker>So the Rose Quarter project was selected as one of 3 projects nationally for America Forward's technical assistance.

73
00:18:01.836 --> 00:18:22.115
<v Unidentified speaker>America Forward provides value to the project through their nationally recognized expertise and is led by former Undersecretary to Chris— former USDOT Undersecretary Christopher Coase, former Washington Secretary of Transportation Roger Millar, and former USDOT Advisor Julian Reinbeck.

74
00:18:23.719 --> 00:18:28.468
<v Unidentified speaker>We've, as a group, we've discussed several ways to continue to strengthen the project's approach.

75
00:18:29.510 --> 00:18:45.376
<v Unidentified speaker>And one of the primary themes that the project management group has recently assembled around is the shift of thinking of all the development economic opportunity that's happening in the district and not just focusing on the transportation project itself.

76
00:18:46.516 --> 00:18:47.880
<v Unidentified speaker>This is still in development.

77
00:18:48.922 --> 00:19:00.448
<v Unidentified speaker>But we're working with America Forward to stand up a group to provide leadership around the broader district as a whole with representation from everything that's going on in the area.

78
00:19:01.184 --> 00:19:11.124
<v Unidentified speaker>This is similar to what's been done in this city in the past for things such as the Portland Streetcar and Pearl District development and other projects and big developments.

79
00:19:12.150 --> 00:19:25.611
<v Unidentified speaker>We're also working as a group on a presentation for Governor Kotek's Transportation Vision Workgroup that's working towards development of recommendations for transportation funding in the 2027 legislative session.

80
00:19:26.286 --> 00:19:31.839
<v Unidentified speaker>So there's a lot of work, a lot of work ahead and a lot of work to look forward to with our project management group.

81
00:19:31.953 --> 00:19:33.782
<v Unidentified speaker>And with that, I'll turn it over to David.

82
00:19:37.569 --> 00:19:50.368
<v David Kim>So I think a critical aspect to this project is really understanding the purpose and need and the solution or benefits that this project offers, not just at a local level, but a regional and statewide level, and to a certain extent, a national level as relates to freight mobility.

83
00:19:54.503 --> 00:20:02.786
<v David Kim>So from a safety perspective, uh, this location has some of the, uh, worst, uh, uh, crash rates in the state on the interstate system.

84
00:20:03.539 --> 00:20:11.387
<v David Kim>It, uh, is, uh, the top congestion bottleneck where we have the convergence of I-5, I-84, and I-405.

85
00:20:12.125 --> 00:20:23.036
<v David Kim>And, uh, Portland— uh, this location has the 4th worst congestion and 7th worst traffic amongst 49 major metropolitan areas across the country.

86
00:20:24.757 --> 00:20:25.464
<v David Kim>The improvements that—.

87
00:20:26.045 --> 00:20:27.138
<v Unidentified speaker>Could you say that one more time?

88
00:20:27.925 --> 00:20:37.949
<v David Kim>Okay, so Portland has the 4th worst congestion and 7th worst traffic amongst 49 major metropolitan areas.

89
00:20:40.323 --> 00:20:44.912
<v David Kim>And so in addition to the safety elements, we're looking at the operational piece.

90
00:20:45.997 --> 00:20:47.426
<v David Kim>Of improving traffic flow.

91
00:20:47.924 --> 00:20:53.498
<v David Kim>There's a freight mobility element to this as well as a community development and economic development.

92
00:20:54.509 --> 00:20:59.762
<v David Kim>And going to the next slide, there's also a restorative justice element.

93
00:20:59.810 --> 00:21:08.115
<v David Kim>So when the interstate was constructed in the '60s, you can see on the left a vibrant neighborhood of Albina.

94
00:21:08.565 --> 00:21:17.886
<v David Kim>And after the interstate system was constructed, It really split and displaced— split the community, the neighborhood, and displaced many of the businesses and residents of the area.

95
00:21:20.115 --> 00:21:31.349
<v David Kim>So this is an artist rendering of what the development could look like once the project is fully built out.

96
00:21:31.414 --> 00:21:40.828
<v David Kim>So having the covers in place, the covers being able to support development of businesses and potential housing.

97
00:21:42.790 --> 00:21:54.948
<v David Kim>We've worked with our partners, including Albina Vision Trust, City of Portland, TriMet, Oregon Metro, the Trailblazers, and others to look at this vision and really turn it into reality.

98
00:21:55.222 --> 00:21:58.876
<v David Kim>And as Monica mentioned, there's a lot of other investment taking place.

99
00:21:58.941 --> 00:22:07.666
<v David Kim>This is truly fertile ground and partnering with those other organizations and agencies to make this vision turn into reality.

100
00:22:09.184 --> 00:22:12.759
<v David Kim>We're adopting new and innovative approaches to make this possible.

101
00:22:13.435 --> 00:22:16.510
<v David Kim>As Monica mentioned, we're partnering with America Forward.

102
00:22:16.575 --> 00:22:29.977
<v David Kim>They're working with other communities across the country to look at best practices for how to solidify projects like this and also how to identify and secure funding at the local, state, and national levels.

103
00:22:31.604 --> 00:22:38.074
<v David Kim>The future of the Albina is being shaped by a growing network of investments from our partners.

104
00:22:38.493 --> 00:22:49.196
<v David Kim>And the partners have all stepped up, as Monica mentioned, with the PMG Group and the collaboration and the opportunities to leverage and partner in terms of that vision.

105
00:22:50.113 --> 00:22:55.294
<v David Kim>The I-5 Rose Quarter project is a foundational investment that supports these efforts.

106
00:22:55.890 --> 00:23:02.151
<v David Kim>From a transportation perspective, from a safety perspective, from reducing congestion, Thank you.

107
00:23:02.263 --> 00:23:04.808
<v David Kim>And restoring the neighborhood connections.

108
00:23:05.694 --> 00:23:13.992
<v David Kim>We're also making significant investments to the surface streets, so the walking, the biking, the transit, by constructing safer crossings.

109
00:23:14.733 --> 00:23:24.057
<v David Kim>And this highway cover will help, again, reconnect elements of these surface improvements.

110
00:23:27.439 --> 00:23:31.153
<v David Kim>So I mentioned economic and freight mobility benefits.

111
00:23:31.201 --> 00:23:49.329
<v David Kim>So this does— this project does address on the We know that Portland is the economic engine and hub for the state, and so efficient and timely and reliable movement of goods is critical.

112
00:23:49.329 --> 00:23:52.869
<v David Kim>The Oregon Trucking Association is a strong champion and advocate for this project.

113
00:23:53.529 --> 00:23:58.140
<v David Kim>It's going to save drivers nearly 2.5 million hours of travel time.

114
00:23:58.470 --> 00:24:01.630
<v David Kim>The hours of congestion here are pretty much throughout the entire day.

115
00:24:02.109 --> 00:24:03.529
<v Loretta Smith>And then, um, I think we're going to have to take a vote on this.

116
00:24:03.652 --> 00:24:12.411
<v David Kim>This is not just a project in terms of the outcome, but there are, what I like to say, the process is just as important as the outcome.

117
00:24:12.490 --> 00:24:14.655
<v David Kim>So there's small business elements.

118
00:24:14.704 --> 00:24:20.943
<v David Kim>We got a lot of local businesses working, but we also have a lot of local workers that are working on this project through apprenticeship programs.

119
00:24:21.602 --> 00:24:35.443
<v David Kim>And so building career opportunities and building capacity so that as they are able to work on this project, get that mentoring and family wage jobs, And wealth creation that they're able to work on other projects for the city and the state.

120
00:24:36.315 --> 00:24:37.749
<v David Kim>And so yeah, a lot of growth opportunities.

121
00:24:39.086 --> 00:24:45.903
<v David Kim>And really, this will be a catalyst for development, both from the public sector and private sector.

122
00:24:49.240 --> 00:24:54.578
<v David Kim>So the overall vision and scope of this project is illustrated on this slide.

123
00:24:55.162 --> 00:24:58.689
<v David Kim>So number one is the full build-out of the highway cover.

124
00:24:59.595 --> 00:25:05.310
<v David Kim>There'll be a new crossing at Hancock Street that'll be on top of the COVID That's number 2.

125
00:25:06.259 --> 00:25:17.894
<v David Kim>And then numerous multimodal facility improvements such as for bicyclists, pedestrians, as well as transit users.

126
00:25:18.964 --> 00:25:20.959
<v David Kim>And the streetcar will be going through here as well.

127
00:25:22.449 --> 00:25:24.798
<v David Kim>We're also looking at new connectivity.

128
00:25:25.718 --> 00:25:29.589
<v David Kim>With the construction of a pedestrian bicycle bridge over the interstate.

129
00:25:30.152 --> 00:25:33.141
<v David Kim>That's number 4, and you could see that in the teal color.

130
00:25:33.991 --> 00:25:45.174
<v David Kim>And then certainly we'll be adding aux lanes and wider shoulders in each direction to really improve the operation of interstate through this corridor.

131
00:25:45.961 --> 00:25:50.878
<v David Kim>And then lastly, we're looking to relocate the I-5 southbound off-ramp.

132
00:25:50.959 --> 00:26:00.280
<v David Kim>Today it The off-ramp terminates at Broadway, and we want to move that further to the south so you don't have cars from the interstate entering into the middle of the COVID area.

133
00:26:04.369 --> 00:26:08.884
<v David Kim>So the construction that is underway— so Monica mentioned that we broke ground last August.

134
00:26:09.768 --> 00:26:15.297
<v David Kim>We are working on some stormwater facilities to address the runoff as part of the Portland Harbor Agreement.

135
00:26:15.345 --> 00:26:28.352
<v David Kim>So we have both a water quality detention facility there as well as some stormwater detention facilities under the I-5 or I-405 interstate area.

136
00:26:29.065 --> 00:26:37.093
<v David Kim>And then on the main line, the plan is to work on some seismic retrofit under the structure.

137
00:26:39.130 --> 00:26:39.964
<v David Kim>There's bridge work.

138
00:26:41.170 --> 00:26:45.333
<v David Kim>And then we have the extension of an existing aux lane.

139
00:26:45.492 --> 00:26:48.660
<v David Kim>So currently there's an aux lane between the Moda thank you.

140
00:26:48.660 --> 00:26:50.779
<v David Kim>So we have an existing ramp on I-84.

141
00:26:50.779 --> 00:26:53.750
<v David Kim>We're looking to extend that aux lane to the Morrison Bridge.

142
00:26:54.720 --> 00:27:00.200
<v David Kim>And so part of the project will also preserve the existing concrete deck.

143
00:27:00.200 --> 00:27:03.019
<v David Kim>So redecking the concrete this summer.

144
00:27:03.019 --> 00:27:09.730
<v David Kim>And that works— what Monica will speak to as it relates to the closure, about 2,000 feet of concrete that's really just in bad shape.

145
00:27:09.859 --> 00:27:19.292
<v David Kim>And then looking at installing a sign bridge that will help drivers that are unfamiliar with the area to navigate through thank you.

146
00:27:22.013 --> 00:27:25.255
<v David Kim>As I mentioned, the process is just as important as the outcome.

147
00:27:26.521 --> 00:27:28.643
<v David Kim>And, you know, with every project, there are stories to be told.

148
00:27:28.852 --> 00:27:38.308
<v David Kim>And we have a video here that demonstrates the impact that these projects have on small businesses and workers.

149
00:27:38.422 --> 00:27:44.567
<v David Kim>And so there's also a link to this video on YouTube that should be in your packet.

150
00:27:44.648 --> 00:27:46.180
<v David Kim>So Monica, I'll let you go ahead and run the video.

151
00:27:47.432 --> 00:27:50.074
<v Unidentified speaker>Councilor Smith.

152
00:27:53.230 --> 00:27:56.353
<v David Kim>I've been doing this for over 30 years.

153
00:27:57.010 --> 00:28:07.237
<v David Kim>Going across the Brooklyn Bridge when I was like 6 years old, I seen these sparks off to the side and I was like, Dad, what are those fireworks?

154
00:28:07.334 --> 00:28:09.541
<v David Kim>And he was like, that's the guy welding.

155
00:28:10.234 --> 00:28:12.250
<v David Kim>I was like, well, that's what I want to do.

156
00:28:12.314 --> 00:28:13.201
<v David Kim>I want to be a welder.

157
00:28:17.022 --> 00:28:18.804
<v David Kim>So I met Jeff about a year ago.

158
00:28:19.445 --> 00:28:26.780
<v David Kim>Jeff was talking about the bridge project, and I've loved bridges ever since I went across that bridge at 6 years old.

159
00:28:26.990 --> 00:28:30.953
<v David Kim>This job, it's a great opportunity for me and for us in the community.

160
00:28:31.386 --> 00:28:42.627
<v David Kim>Raymour, not just coming from a business standpoint, Jeff Moreland, he's under the headship of the supreme being of the universe, you know, spiritually.

161
00:28:42.887 --> 00:28:46.280
<v David Kim>Really sincere in helping people, saying, I'm gonna give you a shot, let's do it.

162
00:28:47.195 --> 00:28:51.625
<v David Kim>I see employment by the community for the community.

163
00:28:51.804 --> 00:28:53.807
<v David Kim>I see growth in the community.

164
00:28:54.972 --> 00:28:55.555
<v David Kim>This is home.

165
00:28:56.553 --> 00:28:57.634
<v David Kim>Portland is home.

166
00:28:58.166 --> 00:29:01.526
<v David Kim>I love helping my community, training them in welding.

167
00:29:01.945 --> 00:29:05.046
<v David Kim>Boom, take the test, now you're making $35 an hour.

168
00:29:06.824 --> 00:29:29.640
<v David Kim>And I'll have to say— oh, by the way, we also used a local media group.

169
00:29:29.688 --> 00:29:30.125
<v Unidentified speaker>Sorry.

170
00:29:31.579 --> 00:29:31.772
<v Unidentified speaker>Sorry.

171
00:29:32.048 --> 00:29:35.214
<v David Kim>We used a local small business to create this video.

172
00:29:35.667 --> 00:29:41.144
<v David Kim>But I'll have to say that certainly as public agencies, we have the ability to set targets and goals.

173
00:29:41.820 --> 00:29:47.592
<v David Kim>But to achieve success stories like this, you have to have a contractor that is committed.

174
00:29:47.931 --> 00:29:59.527
<v David Kim>And having the Hamilton-Sund team in partnership with Waymark Construction, we've been able to advance apprenticeship, hit our targets for minority workers and small business and apprenticeship and TERO and DBE.

175
00:29:59.709 --> 00:30:14.119
<v David Kim>So, and that's one, Powerful aspect with a construction manager general contractor delivery method, what's known as CMGC, is we have a lot more flexibility and influence on not just the what, but the how.

176
00:30:15.769 --> 00:30:17.130
<v Unidentified speaker>Thanks, David.

177
00:30:17.130 --> 00:30:19.670
<v Unidentified speaker>I see a couple hands risen.

178
00:30:19.670 --> 00:30:23.150
<v Unidentified speaker>We're going to shift from this into the closure.

179
00:30:23.150 --> 00:30:24.420
<v Unidentified speaker>So if we want to take questions.

180
00:30:25.630 --> 00:30:25.650
<v Unidentified speaker>Okay.

181
00:30:26.809 --> 00:30:27.970
<v Unidentified speaker>I think we can wait.

182
00:30:28.250 --> 00:30:28.346
<v Unidentified speaker>Okay.

183
00:30:28.412 --> 00:30:29.176
<v Unidentified speaker>With our questions, Jen.

184
00:30:29.241 --> 00:30:29.990
<v Unidentified speaker>Let's keep going.

185
00:30:30.070 --> 00:30:30.836
<v Unidentified speaker>I'll keep going.

186
00:30:35.109 --> 00:30:35.287
<v Unidentified speaker>Okay.

187
00:30:35.946 --> 00:30:40.490
<v Unidentified speaker>So now shifting into the construction closures this summer and fall.

188
00:30:41.248 --> 00:30:55.146
<v Unidentified speaker>You may have seen in the news and have likely heard starting in early May, we had a news release announcing this to the public around the 5-week closure that will start in September and run through October.

189
00:30:55.922 --> 00:31:11.471
<v Unidentified speaker>So I'm going to walk through the work we've been doing, how we got to the— and arrived at the construction approach, what we anticipate the traffic impacts to be, and how we're getting the word out and our ongoing coordination to make sure this is successful as possible.

190
00:31:14.009 --> 00:31:23.731
<v Unidentified speaker>So starting really quick before I dive into that 5-week closure, as I mentioned before, we do have a 14-hour closure this summer.

191
00:31:24.125 --> 00:31:39.298
<v Unidentified speaker>So this closure will be a full closure of northbound and southbound lanes in the Rose Quarter project area to install that sign bridge that David mentioned in the scope slide for safe navigation once construction is complete.

192
00:31:39.763 --> 00:31:48.659
<v Unidentified speaker>This closure is planned to be 14 hours and will start at 10:00 PM on a Saturday and open up no later than 12:00 PM on Sunday.

193
00:31:49.156 --> 00:31:53.234
<v Unidentified speaker>But we will reopen sooner if the work is completed quicker.

194
00:31:55.713 --> 00:32:00.166
<v Unidentified speaker>So then diving into the big closure this fall, the work that we're doing.

195
00:32:00.214 --> 00:32:09.615
<v Unidentified speaker>So we are doing structural repairs to the surface and surface replacement of the I-5 southbound roadway in this area.

196
00:32:09.953 --> 00:32:20.499
<v Unidentified speaker>So this section of road was built 60 years ago with the construction of I-5, and the concrete bridge deck in this area was last replaced in 1985.

197
00:32:20.547 --> 00:32:23.000
<v Unidentified speaker>So it is well past its 25-year design life.

198
00:32:23.053 --> 00:32:30.988
<v Unidentified speaker>And as you're aware, As you're probably aware, driving through this area, there's significant potholes and cracks and ruts and damage to the surface.

199
00:32:31.869 --> 00:32:44.282
<v Unidentified speaker>And if repairs are delayed any further, there is a worry that this bridge deck damage can further lead to more damage to the bridge structure itself, which is more costly repairs in the future and longer closures.

200
00:32:45.099 --> 00:32:51.482
<v Unidentified speaker>Once complete, the replaced bridge surface is designed to last 25 years or more.

201
00:32:51.932 --> 00:32:54.835
<v Unidentified speaker>So it'll be a long time before it'll need to be replaced again.

202
00:32:54.962 --> 00:32:56.037
<v Unidentified speaker>Thank you.

203
00:32:57.000 --> 00:33:07.788
<v Unidentified speaker>And this area, and I'll mention this a little bit further in the options that we considered, but this area of I-5 is unique and difficult to work in because it is very narrow and only 2 lanes.

204
00:33:08.078 --> 00:33:12.144
<v Unidentified speaker>It is 38 feet wide, so there is not very wide shoulders.

205
00:33:12.821 --> 00:33:16.446
<v Unidentified speaker>And I'll expand a little bit more on how that kind of went into our decision-making.

206
00:33:18.482 --> 00:33:33.095
<v Unidentified speaker>First, just as an example, you may recall, may or may not recall, in 2024, a hole formed in I-5 and an emergency closure was needed at 4:45 PM to repair the bridge deck during peak rush hour traffic.

207
00:33:33.509 --> 00:33:41.727
<v Unidentified speaker>So the picture on the right is from underneath the bridge structure near the 405 interchange, looking up through a hole in the bridge.

208
00:33:42.609 --> 00:33:50.851
<v Unidentified speaker>So these kinds of last-minute emergency repairs and closures will be more common if the necessary repairs aren't completed this fall.

209
00:33:53.261 --> 00:33:55.557
<v Unidentified speaker>And so here, there's no sound to this.

210
00:33:55.623 --> 00:34:08.097
<v Unidentified speaker>We just have a A time-lapse video that shows a bridge deck repair in rural Oregon, much smaller scale, but this helps demonstrate the work that we will be doing in the process.

211
00:34:08.664 --> 00:34:13.989
<v Unidentified speaker>So first, the team will implement traffic control and signage and the communications.

212
00:34:14.742 --> 00:34:18.057
<v Unidentified speaker>You can see they're removing the existing deck.

213
00:34:18.284 --> 00:34:22.230
<v Unidentified speaker>It's about a little over 2 inches of concrete gets removed by sections.

214
00:34:22.311 --> 00:34:39.315
<v Unidentified speaker>So with a micro-milling machine and then coming back with a water blasting machine, imagine extremely high-powered pressure washer, and then they go back by hand and repair weaker areas of the deck where there may be holes and maybe reinforcement is exposed.

215
00:34:41.090 --> 00:34:46.461
<v Unidentified speaker>This one was again just a smaller closure overnight, so I'll let the nighttime go.

216
00:34:46.889 --> 00:34:56.186
<v Unidentified speaker>So then after the deck repairs themselves are complete, a new concrete overlay will be placed.

217
00:34:56.235 --> 00:35:02.380
<v Unidentified speaker>You can see here they're doing final cleaning of the deck and then starting to pour the concrete overlay.

218
00:35:05.070 --> 00:35:13.648
<v Unidentified speaker>Once the overlay is poured, so once the concrete is poured and finished, you can see they're placing blankets and curing compound.

219
00:35:14.090 --> 00:35:16.344
<v Unidentified speaker>So this will cure for a few days.

220
00:35:16.860 --> 00:35:21.500
<v Unidentified speaker>We will install bridge expansion joints between each bridge.

221
00:35:22.016 --> 00:35:34.411
<v Unidentified speaker>And then on the Rose Quarter project, you don't see it here, but on the Rose Quarter project, we will do saw cut a new concrete texture for skid resistance, then eventually stripe and reopen to traffic.

222
00:35:35.117 --> 00:35:38.097
<v Unidentified speaker>A few things I wanted to highlight that you can see in this video.

223
00:35:38.163 --> 00:35:42.250
<v Unidentified speaker>Crews will be working 24 hours a day, 7 days a week during the closure.

224
00:35:42.811 --> 00:35:45.552
<v Unidentified speaker>They'll maximize concurrent work as much as possible.

225
00:35:45.601 --> 00:35:54.449
<v Unidentified speaker>You can see a lot of equipment and people working simultaneously on different operations to get this work done as fast as possible.

226
00:35:54.496 --> 00:35:56.885
<v Unidentified speaker>We'll have multiple machines, multiple crews.

227
00:35:57.222 --> 00:36:08.804
<v Unidentified speaker>Our team has worked with ODOT engineers and others using— to use the latest technology in rapid curing concrete to get things opened up as quick as possible.

228
00:36:09.432 --> 00:36:18.400
<v Unidentified speaker>And really every hour of the schedule is accounted for, and there'll be, you know, times at the end where the concrete is curing for the last pour.

229
00:36:18.463 --> 00:36:21.565
<v Unidentified speaker>But other than that, there is work going 24/7.

230
00:36:24.875 --> 00:36:28.583
<v Unidentified speaker>And like I mentioned, we looked at different options.

231
00:36:28.695 --> 00:36:33.525
<v Unidentified speaker>So we looked at 3 different options when evaluating how to approach this work.

232
00:36:33.684 --> 00:36:42.092
<v Unidentified speaker>So first, single lane closure, and this was deemed really infeasible due to that limited width in the area.

233
00:36:42.878 --> 00:36:58.550
<v Unidentified speaker>There's not enough width in this area of I-5 to safely have crews working in one lane, have a barrier, a safety barrier in between the crews and the traveling public, and then have enough room for the traveling public to travel through that area.

234
00:36:58.855 --> 00:37:00.666
<v Unidentified speaker>We also have, you know, safety risks.

235
00:37:00.713 --> 00:37:10.056
<v Unidentified speaker>If there wasn't a barrier there and just cones, you run the risk of traffic and the workers coming into contact with each other, and that is a very serious risk.

236
00:37:10.456 --> 00:37:28.648
<v Unidentified speaker>There's also concerns, potential poor concrete quality, as you can— on bridges with live traffic, there's vibration, and pouring concrete next to that vibration, there's a potential for poor If it was feasible, we did look at duration.

237
00:37:29.021 --> 00:37:38.128
<v Unidentified speaker>It would be nearly 4 months longer than the scheduled complete closure and would add roughly $4.5 to $7 million in added cost.

238
00:37:40.083 --> 00:37:46.898
<v Unidentified speaker>We looked at weekend closures as a second option, and that was ruled out due to major inefficiencies.

239
00:37:46.963 --> 00:37:52.275
<v Unidentified speaker>As you can imagine, setting up and taking down major traffic control every weekend and not being able to get a lot of work done in one weekend.

240
00:37:52.342 --> 00:37:52.690
<v Unidentified speaker>I think that's a good point.

241
00:37:56.461 --> 00:38:06.726
<v Unidentified speaker>We also had the same concrete quality and durability concerns from— for having multiple small concrete pours with multiple joints between those concrete pours.

242
00:38:07.561 --> 00:38:20.313
<v Unidentified speaker>And then the biggest reason this was ruled out, this would extend across 2 summers of full weekend closure, every weekend for 2 summers, and add roughly $6 to $9 million in additional project costs.

243
00:38:20.362 --> 00:38:20.490
<v Unidentified speaker>Thank you.

244
00:38:20.797 --> 00:38:27.297
<v Unidentified speaker>So ultimately, we landed after a lot of consideration on a continuous 5-week closure.

245
00:38:28.331 --> 00:38:40.536
<v Unidentified speaker>And this approach is the cheapest, the fastest, the safest for the workers, and provides the highest quality concrete and longest lasting bridge deck that will live up to its 25-year design life.

246
00:38:44.862 --> 00:38:49.315
<v Unidentified speaker>Now shifting into what the closure will look like.

247
00:38:49.722 --> 00:38:57.905
<v Unidentified speaker>As I mentioned earlier, the closure is the closure is scheduled to begin on Friday, September 11th, and will last up to 5 weeks.

248
00:38:58.130 --> 00:39:01.784
<v Unidentified speaker>We'll open up sooner if the work is completed sooner.

249
00:39:02.715 --> 00:39:09.255
<v Unidentified speaker>And starting from the north, so on the right side of the screen is a graphic showing the closure and the detour routes.

250
00:39:09.302 --> 00:39:23.449
<v Unidentified speaker>So starting from the north of that graphic, the southbound off-ramp from I-5 to I-405 will be open and all I'll expand on the next slide, but that is the primary detour route.

251
00:39:24.460 --> 00:39:32.376
<v Unidentified speaker>The on-ramps from Greeley Avenue and I-405 northbound to I-5 southbound, those will be closed.

252
00:39:32.728 --> 00:39:44.818
<v Unidentified speaker>We will be leaving one lane open of I-5 southbound to the Broadway-Weidler exit for local traffic going to events at Moda Center, Memorial Coliseum, the Convention Center, or local access.

253
00:39:47.297 --> 00:39:57.039
<v Unidentified speaker>I-5 southbound will be completely closed from the Broadway-Weidler exit to the I-84 interchange, and this is where the work will be taking place.

254
00:39:57.121 --> 00:40:00.804
<v Unidentified speaker>You can see in that hatched work zone area at the south side of the graphic.

255
00:40:02.420 --> 00:40:10.884
<v Unidentified speaker>Both directions of I-84 will remain open to traffic, and westbound traffic will be able to get onto both I-5 north and I-5 southbound from I-84.

256
00:40:10.949 --> 00:40:11.045
<v Unidentified speaker>Thank you.

257
00:40:12.108 --> 00:40:22.143
<v Unidentified speaker>So now looking at the signed detour routes that will be in place during the closure.

258
00:40:22.192 --> 00:40:39.121
<v Unidentified speaker>So for traffic that's driving through the area and continuing on I-5 South, they will be— the signed detour route will be onto the I-405 over the Fremont Bridge and then merge back into I-5 southbound at the south end of the city.

259
00:40:40.443 --> 00:40:49.706
<v Unidentified speaker>For traffic that needs to go eastbound on 84, they'll be detoured as well onto 405, then onto I-5 North and 84 eastbound.

260
00:40:51.688 --> 00:41:02.811
<v Unidentified speaker>For, as I mentioned, the I-5 southbound traffic that is going to the Broadway-Weidler exit, so into the events area, that will remain open.

261
00:41:03.567 --> 00:41:12.621
<v Unidentified speaker>For regional traffic that doesn't need to access downtown Portland and is coming from the north, North, we are encouraging folks to take 205.

262
00:41:12.733 --> 00:41:19.168
<v Unidentified speaker>There'll be signage up at the I-5/205 split for folks that can avoid the area altogether.

263
00:41:20.340 --> 00:41:25.492
<v Unidentified speaker>But this, you know, and we recognize that these are the signed detour routes.

264
00:41:25.813 --> 00:41:32.266
<v Unidentified speaker>There will also be traffic as folks use Google Maps and other things to navigate that will spill over into the city streets.

265
00:41:32.313 --> 00:41:37.128
<v Unidentified speaker>So this will not just be impacting the freeway system, will be impacting the local streets as well.

266
00:41:37.626 --> 00:41:37.898
<v Unidentified speaker>Thank you.

267
00:41:39.199 --> 00:41:42.313
<v Unidentified speaker>And could be some of the worst traffic that the region has seen in a long time.

268
00:41:43.228 --> 00:41:57.961
<v Unidentified speaker>Travel could take 2 to 3 times longer is what our traffic modeling is currently showing, and be at the worst at peak congestion hours, extending all the way up into Washington over the I-5 bridge.

269
00:41:59.101 --> 00:42:14.969
<v Unidentified speaker>And we know this is going to be tough for everyone— travelers, freight, businesses in the area— and we do, as I mentioned, And expect people to find many parallel routes that'll stretch beyond the interstate into city streets.

270
00:42:15.706 --> 00:42:35.099
<v Unidentified speaker>And so we are working, we have been doing some coordination, we have a lot of coordination continuing with PBOT and other bureau staff to make sure we are prepared and have plans during the closure and can make it as least impactful as possible, understanding that there is going to be an impact during the closure.

271
00:42:35.146 --> 00:42:35.259
<v Unidentified speaker>Thank you.

272
00:42:40.213 --> 00:42:44.431
<v Unidentified speaker>We are using multiple strategies for traffic management during the closure.

273
00:42:45.123 --> 00:42:50.076
<v Unidentified speaker>One of them will be clearing incidents so that they don't create compounding impacts.

274
00:42:50.123 --> 00:42:55.619
<v Unidentified speaker>So traffic areas across the region will be monitored during the closure.

275
00:42:56.213 --> 00:43:02.317
<v Unidentified speaker>We'll have incident response vehicles present at different closure and detour route points and increased incident response staff on call.

276
00:43:02.365 --> 00:43:02.574
<v Unidentified speaker>Thank you.

277
00:43:02.670 --> 00:43:12.001
<v Unidentified speaker>Response staff available to provide assistance to disabled vehicles and help keep lanes open and operating as smooth as possible during the detour.

278
00:43:13.550 --> 00:43:32.536
<v Unidentified speaker>We're also, as I mentioned, working with city staff on smoothing traffic flow on local streets, adjusting ramp metering and signal timing, and collaboration— collaborating on traffic operations monitoring and safety during the closure, or ahead of the closure, and operations during the closure.

279
00:43:32.585 --> 00:43:41.141
<v Unidentified speaker>The The graphic on the right shows all the locations in Oregon of variable message signs.

280
00:43:41.815 --> 00:43:55.552
<v Unidentified speaker>We are also coordinating with our counterparts in Washington, with Washington DOT, to notify travelers, as I said, up at the 205 and I-5 split and along I-5 coming down through Vancouver.

281
00:43:56.706 --> 00:43:59.208
<v Unidentified speaker>And lastly, we're asking everyone to plan ahead.

282
00:43:59.527 --> 00:44:19.985
<v Unidentified speaker>Many drivers have no other option than to come through this area during the closure, but if there's some people that do have flexibility, in their travel plans, whether that's traveling during off-peak hours, using public transit, or planning alternate routes so that the system will function better for everyone, that will help.

283
00:44:20.048 --> 00:44:28.059
<v Unidentified speaker>And I did mention earlier, but the traffic modeling is based on nobody changing the traffic patterns or their behaviors.

284
00:44:28.717 --> 00:44:42.581
<v Unidentified speaker>And so what we've seen in the past with these larger traffic closures is people do find alternate times or alternate routes and travel patterns traffic still is bad, but ends up being better than what we've modeled.

285
00:44:42.646 --> 00:44:47.115
<v Unidentified speaker>But, you know, we're planning for the worst and hoping for the best in this.

286
00:44:47.646 --> 00:44:55.407
<v Unidentified speaker>So we're working with our team to address, you know, things as if no one were changing their traffic behaviors.

287
00:44:58.838 --> 00:45:00.695
<v Unidentified speaker>And then switching over to outreach.

288
00:45:00.760 --> 00:45:19.786
<v Unidentified speaker>So we've been building our communications outreach and engagement approach based on past closures in the region, as well as examples of other projects in our neighboring states to the north and south that have had successful managing— success in managing and mitigating some of the traffic by executing a good communication strategy.

289
00:45:21.347 --> 00:45:30.922
<v Unidentified speaker>So our goal overall is to create many touches and reduce surprises with the closure using lessons learned from those previous closures and other projects.

290
00:45:31.422 --> 00:45:36.719
<v Unidentified speaker>We want everyone to be as prepared as possible and plan for the impacts during the closure.

291
00:45:38.387 --> 00:45:48.815
<v Unidentified speaker>Recently, we've been coordinating, as I mentioned, with WSDOT and their team doing the long-duration closures up in the Seattle area on the Revive I-5 project.

292
00:45:49.780 --> 00:45:57.315
<v Unidentified speaker>We're preparing a range of materials to share out through these outreach efforts and working with people in a variety of ways.

293
00:45:57.893 --> 00:46:15.483
<v Unidentified speaker>We'll be attending local events, engaging the media, distributing information through open houses, ODOT channels and using ODOT social media as well as paid advertising campaign and collaborating with our partner agencies and other organizations throughout the city to get this message out.

294
00:46:18.000 --> 00:46:20.152
<v Unidentified speaker>You can see on the screen our outreach schedule.

295
00:46:20.378 --> 00:46:25.119
<v Unidentified speaker>It's ongoing and it will be continuing through the closure and after the closure.

296
00:46:26.146 --> 00:46:29.186
<v Unidentified speaker>We will be doing outreach and coordination throughout the summer.

297
00:46:30.706 --> 00:46:41.831
<v Unidentified speaker>Which will include mailers and social media and advertising campaign, meeting with the community organizations, and ongoing touchpoints with our government and partner audiences.

298
00:46:42.905 --> 00:46:55.891
<v Unidentified speaker>We'll also be sharing a messaging toolkit and graphics, and I will— that's a little bit more on the next slide— with these audiences that you can, as I mentioned, distribute and amplify this message through as many channels as possible.

299
00:46:56.612 --> 00:47:09.219
<v Unidentified speaker>And then during the closure, we'll be continuing the ongoing communications campaign and after the closure, we will follow up on how everything went because we will be doing the northbound closure next year.

300
00:47:09.268 --> 00:47:15.750
<v Unidentified speaker>So we want to make sure that we understand the lessons learned and make improvements for next year as well.

301
00:47:18.429 --> 00:47:22.221
<v Unidentified speaker>This is just some of logos of some of the outreach that we've done.

302
00:47:22.318 --> 00:47:29.885
<v Unidentified speaker>We've done a lot of outreach and coordination, but there's a lot more to be done in the next several months, both at the communications and the technical level.

303
00:47:30.079 --> 00:47:31.282
<v Unidentified speaker>We started outreach in spring 2025.

304
00:47:31.347 --> 00:47:31.543
<v Unidentified speaker>Thank you.

305
00:47:33.706 --> 00:47:43.128
<v Unidentified speaker>To a variety of partner organizations, local government, transit agencies, event centers, hospital emergency services, freight and business organizations.

306
00:47:44.068 --> 00:47:52.331
<v Unidentified speaker>And we also, right before the public launch, hosted 2 webinars for local, regional, and federal elected officials to attend.

307
00:47:54.489 --> 00:48:19.668
<v Unidentified speaker>And then this is a lot of words, but we have a lot more outreach and technical coordination planned over the coming months leading up to the closure, including outreach to local commissions and committees, partner agencies, major events, community organizations, neighborhood organizations and faith groups, business associations, freight distributors, and large employers in the region.

308
00:48:20.422 --> 00:48:40.884
<v Unidentified speaker>And at a technical level, we also have ongoing coordination with, as I mentioned, with PBOT, emergency responders, and other bureaus within the city and project partners to make sure everyone's operations run as smooth is possible during the closure, understanding that there will be an impact to operations while I-5 is closed.

309
00:48:43.331 --> 00:48:50.626
<v Unidentified speaker>And I can't emphasize enough the importance of staying informed and sharing the details of the closure with everyone in the region.

310
00:48:51.141 --> 00:48:56.900
<v Unidentified speaker>As I mentioned, our team has developed a toolkit and we'll be adding more information to that toolkit soon.

311
00:48:57.014 --> 00:48:59.474
<v Unidentified speaker>We have a link on our website that we've been sharing.

312
00:48:59.586 --> 00:49:00.311
<v Unidentified speaker>Thank you.

313
00:49:00.492 --> 00:49:13.612
<v Unidentified speaker>With all of our partners who have the ability to share fact sheets, share sample newsletters that can get integrated into newsletters, graphics, and a whole list of resources.

314
00:49:14.371 --> 00:49:22.545
<v Unidentified speaker>People can also sign up for notifications on our project website and reach out with any questions or concerns that the team will work to address.

315
00:49:23.465 --> 00:49:27.346
<v Unidentified speaker>And I've listed Rose Gerber, who's here in the audience today.

316
00:49:27.427 --> 00:49:30.257
<v Unidentified speaker>She is our public information officer and is our point of contact for communications.

317
00:49:30.306 --> 00:49:38.981
<v Unidentified speaker>She's also happy to take any questions, um, or any, uh, be our single point of contact for communications.

318
00:49:39.047 --> 00:49:45.268
<v Unidentified speaker>And so that concludes my presentation, and happy to open it up for questions and happy to go back to any slide if we need to.

319
00:49:45.380 --> 00:49:46.711
<v Unidentified speaker>Thank you, Monica, and thank you, David.

320
00:49:46.967 --> 00:49:48.362
<v Unidentified speaker>Um, great overview.

321
00:49:49.373 --> 00:50:11.318
<v Unidentified speaker>Um, I'm still in shock, um, when I think about this and the impact, and I know we're going to have a lot of questions, and for you and others, just just to note too that we have Director Millicent Williams in the audience also, um, and Caitlin Ruff, I think, to answer questions should we want to get into, uh, PBOT-related questions.

322
00:50:11.414 --> 00:50:14.684
<v Unidentified speaker>But my head's just spinning about 405.

323
00:50:14.940 --> 00:50:15.228
<v Unidentified speaker>Oh boy.

324
00:50:16.061 --> 00:50:17.536
<v Unidentified speaker>Uh, and, and the alternative routes.

325
00:50:17.905 --> 00:50:19.619
<v Unidentified speaker>I just— it's already— it's bad there now.

326
00:50:20.389 --> 00:50:23.016
<v Unidentified speaker>It's just— I, I can't— it's really hard for me to imagine.

327
00:50:23.065 --> 00:50:29.106
<v Unidentified speaker>I'd love to see a map in the future of all the— what you're fantasizing as the parallel routes and, and what that means.

328
00:50:29.202 --> 00:50:33.641
<v Unidentified speaker>But, um, with that, we'll, we'll just turn to my colleagues.

329
00:50:33.704 --> 00:50:37.085
<v Unidentified speaker>I think, uh, Councilor Koyama Lane already had her hand up first.

330
00:50:38.496 --> 00:50:39.088
<v Tiffany Koyama Lane>Thank you, Chair.

331
00:50:40.177 --> 00:50:52.307
<v Tiffany Koyama Lane>Um, first, I want— thank you for being here, and I want to highlight how the highway cover, that part of the project, is so important and reconnects and repairs some of the harms that community thank you.

332
00:50:52.532 --> 00:50:54.137
<v Tiffany Koyama Lane>I'm very supportive of that.

333
00:50:55.260 --> 00:51:02.286
<v Tiffany Koyama Lane>And I also have some questions about this project that have been informed by different conversations I've had with community members.

334
00:51:03.264 --> 00:51:18.567
<v Tiffany Koyama Lane>I'm hearing concerns from community about when the IBR tolling commences, that diversion onto I-205 and surrounding surface streets will cause congestion and safety, air quality concerns.

335
00:51:20.204 --> 00:51:27.108
<v Tiffany Koyama Lane>Can one of you explain or share what data ODOT is planning to collect during this I-5 South closure?

336
00:51:27.992 --> 00:51:32.856
<v Tiffany Koyama Lane>It seems like it's an opportunity to gather some real data to track behaviors and get information.

337
00:51:33.514 --> 00:51:39.070
<v David Kim>Yeah, so with this closure, we will have real-time data as well as historical data.

338
00:51:39.487 --> 00:51:49.876
<v David Kim>So we're currently collaborating with the region and headquarters about what is the data we want to capture in terms of the volume of traffic, the diversion, where's the traffic going.

339
00:51:51.032 --> 00:51:59.141
<v David Kim>We're still trying to figure out what potential reports we'll want to pull and then share that with IBR.

340
00:51:59.527 --> 00:52:01.324
<v David Kim>I'm sure IBR is going to be very interested.

341
00:52:02.047 --> 00:52:10.349
<v David Kim>So there's going to be immense amounts of data, and we're currently strategizing how do we use that data in a way that can inform future— current and future conversations.

342
00:52:11.260 --> 00:52:11.663
<v Tiffany Koyama Lane>Great.

343
00:52:11.920 --> 00:52:20.137
<v Tiffany Koyama Lane>And if there are community members or even us up here that want to follow that, what type of data you're going to end up gathering, how would we do that?

344
00:52:21.161 --> 00:52:24.144
<v David Kim>I think at this point, I think following up with Rose Gerber.

345
00:52:26.831 --> 00:52:31.293
<v David Kim>Right now, I think this is the 3rd time we've been asked about data and information.

346
00:52:31.456 --> 00:52:39.224
<v David Kim>And so as we have more information, we can reach out to those that have interest in the data and what reports are made available.

347
00:52:40.001 --> 00:52:42.235
<v David Kim>Certainly, we're going to be also collaborating with the IBR team.

348
00:52:43.559 --> 00:52:44.155
<v Tiffany Koyama Lane>And related to—.

349
00:52:44.300 --> 00:52:44.639
<v Unidentified speaker>Oh, go ahead.

350
00:52:44.719 --> 00:52:47.311
<v Unidentified speaker>And collaborating with Millicent and her team.

351
00:52:47.456 --> 00:52:48.150
<v Unidentified speaker>That's wonderful.

352
00:52:48.826 --> 00:52:56.965
<v Tiffany Koyama Lane>Related to data collection, do we know how many serious injuries and deaths have occurred in the Rose Quarter, say, in the last 5 years?

353
00:52:58.931 --> 00:53:07.014
<v David Kim>I don't have that data offhand, but that's certainly data we can pull together in terms of minor accidents to severe injury to fatalities.

354
00:53:07.916 --> 00:53:14.630
<v David Kim>But the chart that we had earlier, this location is in the top 5 or 10% of what we call the Safety Priority Index system.

355
00:53:14.742 --> 00:53:19.195
<v David Kim>So every time there's an accident, the individuals submit DMV records.

356
00:53:20.108 --> 00:53:25.364
<v David Kim>We pull that data together statewide and then look at where there's the most frequency and severity of crashes.

357
00:53:25.476 --> 00:53:28.889
<v David Kim>And so this location has, again, top 5 or top 10%.

358
00:53:29.242 --> 00:53:30.603
<v David Kim>So we can get that information to you.

359
00:53:30.844 --> 00:53:35.827
<v Tiffany Koyama Lane>And are you separating out the difference between, like, Vision Zero, serious injuries, and fatalities?

360
00:53:37.280 --> 00:53:42.572
<v David Kim>I don't know that we make a distinction between Vision Zero.

361
00:53:42.637 --> 00:53:51.978
<v David Kim>I think the way the data works for the state system is a minor fender bender or severe injury or going to the emergency room or there's a fatality.

362
00:53:54.190 --> 00:53:55.257
<v Unidentified speaker>Okay.

363
00:53:55.708 --> 00:54:13.789
<v Tiffany Koyama Lane>And maybe this is a question for someone more at the city, but I'm wondering if someone can speak to funding and thinking about Portland's 2027 legislative priorities with respect to funding this, and there's a lot of other funding gaps for transportation.

364
00:54:14.463 --> 00:54:16.710
<v Tiffany Koyama Lane>How does this project play a role in that?

365
00:54:17.126 --> 00:54:22.534
<v Tiffany Koyama Lane>Not sure, Chair, who's the exact person to bring up for that one, if it's Director Williams or—.

366
00:54:22.902 --> 00:54:32.782
<v Unidentified speaker>Well, clearly we're going to have that at the top of our legislative agenda for more funding for transportation generally, but you're talking about yeah, and how much does this—.

367
00:54:33.487 --> 00:54:38.806
<v Tiffany Koyama Lane>Does this project take up all of that, or is there going to be room for other priorities as well?

368
00:54:40.137 --> 00:54:42.813
<v Unidentified speaker>I don't— maybe that's an unfair question for Director Williams.

369
00:54:42.860 --> 00:54:45.152
<v Unidentified speaker>I'm not sure, but you want to take a stab at it?

370
00:54:45.521 --> 00:54:46.146
<v Millicent Williams>I'll take a stab.

371
00:54:46.226 --> 00:54:47.637
<v Millicent Williams>Good afternoon.

372
00:54:47.764 --> 00:54:49.943
<v Millicent Williams>I'm Millicent Williams, Director of the Portland Bureau of Transportation.

373
00:54:50.056 --> 00:54:52.925
<v Millicent Williams>Thank you so much, uh, councilors and committee.

374
00:54:53.661 --> 00:55:02.668
<v Millicent Williams>Uh, Councilor Koyama Lane, to answer your To answer your question, currently the city is not an investor in this project.

375
00:55:03.373 --> 00:55:10.809
<v Millicent Williams>It does not mean that we would not be an investor and that we would not work together with ODOT to identify funding sources to fill the gap.

376
00:55:11.289 --> 00:55:21.273
<v Millicent Williams>How we would prioritize this would be informed by city leadership in terms of how we would approach it with the appropriate folks at the state level.

377
00:55:21.320 --> 00:55:21.465
<v Millicent Williams>Thank you.

378
00:55:21.530 --> 00:55:35.027
<v Millicent Williams>Level in the— I don't want to say advocacy, but in our efforts to identify the best ways to address what we recognize to be a significant shortfall.

379
00:55:35.349 --> 00:55:55.969
<v Millicent Williams>Currently, zero investment, but both David Kim and I, as well as Monica and several others at ODOT, former Director Chris Strickler, we've all talked about how yeah, and I'm not even saying that the—.

380
00:55:56.170 --> 00:56:04.440
<v Tiffany Koyama Lane>Thinking about the city putting in money, but just thinking about how when we go and advocate, is this kind of our transportation project, this freeway project?

381
00:56:04.449 --> 00:56:08.429
<v Tiffany Koyama Lane>We see— we saw, you know, Safe Routes to Schools get cut.

382
00:56:08.429 --> 00:56:11.320
<v Tiffany Koyama Lane>Is it— is this kind of our— are we using all that up?

383
00:56:11.409 --> 00:56:24.137
<v Tiffany Koyama Lane>And then my last question is, I think, is there a way that we can is just kind of at this point looking at this project, I am hearing more and more constituents ask, are there alternatives at a lower cost?

384
00:56:24.266 --> 00:56:29.090
<v Tiffany Koyama Lane>Are there any cost savings approaches or alternatives that can be explored at this stage?

385
00:56:31.210 --> 00:56:32.880
<v Unidentified speaker>Can I just say something at this point?

386
00:56:33.025 --> 00:56:37.342
<v Unidentified speaker>Is that we're right now, we're just looking at what is this 1C or 1B.

387
00:56:37.568 --> 00:56:46.063
<v Unidentified speaker>We're just looking We're not looking at the full package here.

388
00:56:46.128 --> 00:56:52.498
<v Unidentified speaker>We're just looking at the kind of the asset management, the potholes on I-5, if you will.

389
00:56:52.853 --> 00:56:59.668
<v Unidentified speaker>I mean, this is just a very preliminary piece of taking care of what we own as a state.

390
00:57:00.217 --> 00:57:02.063
<v Unidentified speaker>We're not talking yet.

391
00:57:02.159 --> 00:57:03.552
<v Unidentified speaker>I mean, we don't have the pathway to eminent domain.

392
00:57:03.599 --> 00:57:03.923
<v Unidentified speaker>I think that's a good point.

393
00:57:05.963 --> 00:57:08.918
<v Unidentified speaker>I don't think, because some of that money has been pulled.

394
00:57:09.592 --> 00:57:13.206
<v Unidentified speaker>So right now we're just taking care of what we own as a state.

395
00:57:14.394 --> 00:57:16.387
<v Unidentified speaker>Am I right in making that assumption?

396
00:57:16.835 --> 00:57:30.539
<v David Kim>So Chair Clark, the project we have today, there's a seismic element for resiliency, the bridge deck preservation, but then there's some minor widening yes.

397
00:57:30.797 --> 00:57:39.139
<v David Kim>There's some grading that's gonna take place to— or barrier adjustments to incorporate that extension of the aux lane and then the sign bridges.

398
00:57:39.202 --> 00:57:44.907
<v David Kim>So this project is really a critical element to the rest of the project.

399
00:57:45.228 --> 00:57:55.936
<v David Kim>The challenge that we faced is with the rescission of the funding and no transportation funding package, there was not the funding to do the starting of the COVID work.

400
00:57:56.403 --> 00:58:13.331
<v David Kim>We do have design funds, right-of-way funds, and utility relocation funds to initiate design for Phase 1C, which would get us to about 30% of the COVID And so the big ask of the legislature is gonna be funding the construction phase of 1C.

401
00:58:13.733 --> 00:58:19.918
<v David Kim>And then we'll have Phase 2, which is the remainder of the COVID work and construction of the auxiliary lanes.

402
00:58:20.143 --> 00:58:29.728
<v David Kim>So you are correct, this is really an asset management, seismic resiliency with a little bit of operational improvement and teeing it up for the next broader phase.

403
00:58:30.400 --> 00:58:36.621
<v David Kim>The push the reason for the push to get as much construction done today as possible is really a cost-risk management.

404
00:58:36.686 --> 00:58:38.465
<v David Kim>The longer we wait, the more it's going to cost.

405
00:58:38.563 --> 00:58:43.592
<v David Kim>And so we're trying to leverage all the construction dollars available while we have a contractor on board.

406
00:58:44.967 --> 00:58:45.403
<v David Kim>Anything to add?

407
00:58:48.364 --> 00:58:50.675
<v Tiffany Koyama Lane>No, just that, that last question, which is kind of bigger.

408
00:58:51.969 --> 00:59:01.849
<v Tiffany Koyama Lane>You know, are there conversations around any other alternatives or approaches at this So we went through a robust environmental assessment.

409
00:59:01.849 --> 00:59:03.369
<v David Kim>So the scope of the project has been set.

410
00:59:04.389 --> 00:59:11.960
<v David Kim>So if there's any changes to scope, whether it be a scope addition or reduction, we'll have to evaluate whether that impacts the environmental documents.

411
00:59:12.150 --> 00:59:14.570
<v David Kim>We are evaluating value engineering.

412
00:59:14.570 --> 00:59:16.380
<v David Kim>So are there ways to do things differently?

413
00:59:17.230 --> 00:59:24.989
<v David Kim>This closure is a good example, right, of we looked at different options and alternatives, looked at the impact, looked at the cost, and landed on the option that we thought was the best.

414
00:59:24.989 --> 00:59:38.329
<v David Kim>So you're not ruling out We're working with our design teams, we're working with a contractor evaluating are there other alternatives and options to reduce cost or to limit impacts or to deliver faster.

415
00:59:38.329 --> 00:59:44.800
<v David Kim>And that's the beauty of CMGC is you actually have the contractor that's gonna build the project working with the design team.

416
00:59:44.929 --> 00:59:54.289
<v David Kim>And so we've gone through a series of value engineering sessions and we've identified some opportunities and we can get really technical here, but we've identified some some opportunities to reduce cost.

417
00:59:54.289 --> 00:59:54.309
<v David Kim>Okay.

418
00:59:54.376 --> 00:59:59.068
<v David Kim>Opportunities and are, are incorporating those, uh, opportunities into the design.

419
01:00:01.413 --> 01:00:02.514
<v Unidentified speaker>Thank you, uh, Councilor.

420
01:00:02.563 --> 01:00:04.927
<v Unidentified speaker>I think it's hard right now.

421
01:00:05.219 --> 01:00:07.664
<v Unidentified speaker>We're confronted with the closure.

422
01:00:07.891 --> 01:00:08.068
<v Unidentified speaker>Yeah.

423
01:00:08.360 --> 01:00:09.882
<v Unidentified speaker>And, and what that means.

424
01:00:10.076 --> 01:00:13.786
<v Unidentified speaker>And, and it's really taking care of what we own as a state.

425
01:00:14.351 --> 01:00:18.885
<v Unidentified speaker>But you're right, it's in a larger environment, a larger project that's coming.

426
01:00:18.967 --> 01:00:27.510
<v Unidentified speaker>So I appreciate you bringing that up, because this is just one step forward to something larger, and there's still lots of questions about how we're going to finance that.

427
01:00:28.139 --> 01:00:38.518
<v Unidentified speaker>But I think right now, for me personally, it's like, how, how do we avoid shutting down the city completely with this project, this first phase?

428
01:00:38.797 --> 01:00:39.860
<v Unidentified speaker>That's what really concerns me.

429
01:00:40.333 --> 01:00:41.054
<v Unidentified speaker>Um, Councilor Green.

430
01:00:42.581 --> 01:00:43.797
<v Mitch Green>Uh, thank you, Chair Clark.

431
01:00:43.846 --> 01:00:45.701
<v Mitch Green>Thanks so much for the presentation today.

432
01:00:45.782 --> 01:00:53.505
<v Mitch Green>I just have a few I have a few questions to help me kind of understand, I think, what would be typical project status update parameters or pieces of information.

433
01:00:53.697 --> 01:01:05.612
<v Mitch Green>So my first question is, and before I get going, I echo Councilor Clark, I'm also concerned about the immediate impact, and I've got some questions later that might also be relevant for Director Williams as well.

434
01:01:07.105 --> 01:01:10.331
<v Mitch Green>But what's the current estimate for the total cost of this project?

435
01:01:10.380 --> 01:01:16.818
<v Mitch Green>I know we're talking about one phase of it, But that is a critical input into the broader cost picture.

436
01:01:18.246 --> 01:01:20.221
<v Unidentified speaker>Yeah, so we, thank you, Councilor Green.

437
01:01:20.990 --> 01:01:24.056
<v Unidentified speaker>We are working on an updated cost estimate right now.

438
01:01:24.137 --> 01:01:40.911
<v Unidentified speaker>So the last time the project was estimated was for— was assuming the Reconnecting Communities Grant and the 2027 legislative session, or 2025, apologies, legislative package that would have funded that work and the associated schedule with that.

439
01:01:40.992 --> 01:01:50.568
<v Unidentified speaker>So now that we have agreed upon scope as of a couple months ago for Phase 1C and a delivery schedule to seek funding in 2027.

440
01:01:50.648 --> 01:02:00.034
<v Unidentified speaker>We are updating our cost estimate associated with that delivery schedule and anticipate that to be coming out at the end of the summer.

441
01:02:01.003 --> 01:02:01.170
<v Unidentified speaker>Okay.

442
01:02:01.253 --> 01:02:14.177
<v Unidentified speaker>So the current published cost estimate is roughly $2 billion plus or minus, but we anticipate that to go up because the delivery schedule okay, that is helpful.

443
01:02:14.224 --> 01:02:14.693
<v Mitch Green>Thank you.

444
01:02:16.367 --> 01:02:26.159
<v Mitch Green>And so I'm interested, you had a few bullet points on your early slides about just the interaction effect with the Reconnecting Neighborhoods Grant, which is a really important piece of this.

445
01:02:27.012 --> 01:02:38.213
<v Mitch Green>I echo the support for capping this part of the freeway as an effort to sort of reimagine a new vision for Albina, if you will.

446
01:02:40.246 --> 01:02:50.231
<v Mitch Green>But from what I understand is because we did lose the grant, we are now looking to amend STIP and MTIP to try to find ways to backfill that.

447
01:02:50.617 --> 01:03:02.659
<v Mitch Green>I'm curious, and I understand you've got it laid out on your— OTC has already done their part, and later this month or next month you expect the amendment to Phase B and MTIP to— that conversation will unfold.

448
01:03:02.947 --> 01:03:03.108
<v Unidentified speaker>Yeah.

449
01:03:04.007 --> 01:03:14.128
<v Mitch Green>But what would be the impact I mean, those dollars, those amendments would sort of suggest reprioritizing things, if I'm not mistaken, 'cause you don't, you know, it's creating new resources, right?

450
01:03:14.193 --> 01:03:15.846
<v Mitch Green>So what are we not funding?

451
01:03:16.117 --> 01:03:21.619
<v Mitch Green>And maybe this is an unfair question for you, but I'm curious to know what are we not funding by funding that and amending these plans?

452
01:03:22.855 --> 01:03:24.940
<v Unidentified speaker>Yeah, so I'll start and then fill in, David.

453
01:03:25.356 --> 01:03:39.581
<v Unidentified speaker>So we worked, this was part of, as I mentioned, in December, the Transportation Commission gave us direction to move forward with a Phase 1B but wanted more partner coordination to get that alignment on what that scope was.

454
01:03:40.496 --> 01:03:51.159
<v Unidentified speaker>And so we worked with our PMG partners to look at the remaining scope of Phase 1 that we had all agreed was the next work.

455
01:03:51.255 --> 01:03:59.192
<v Unidentified speaker>So that includes the first third of the COVID work on I-5 between the Broadway-Weidler interchange and 84.

456
01:04:00.137 --> 01:04:00.762
<v Unidentified speaker>We looked at—.

457
01:04:00.811 --> 01:04:01.324
<v Unidentified speaker>Thank you.

458
01:04:02.543 --> 01:04:17.585
<v Unidentified speaker>The remaining funding that we did have, so roughly $170 million is what we had remaining in construction funding, and worked with our design team and our contractor and our partners to look at what we could build with that amount of money.

459
01:04:18.161 --> 01:04:22.235
<v Unidentified speaker>Unfortunately, we could not start the highway cover.

460
01:04:22.282 --> 01:04:27.847
<v Unidentified speaker>That is a large chunk associated with the roughly $380 million that was rescinded.

461
01:04:28.777 --> 01:04:36.585
<v Unidentified speaker>So we agreed that the next phase of work will be the work, what we're calling Phase 1B.

462
01:04:36.713 --> 01:04:53.626
<v Unidentified speaker>So it's on I-5 from I-84 in primarily the northbound direction, work over the Rose Quarter Transit Center and at that I-84 to I-5 interchange merge, and then progressing up towards the highway cover.

463
01:04:53.690 --> 01:05:03.644
<v Unidentified speaker>So we as a project management group and partner group prioritized that work to, as David said, continuing making the best use of the funding that we have available.

464
01:05:03.708 --> 01:05:04.527
<v Unidentified speaker>But key to that—.

465
01:05:04.527 --> 01:05:04.847
<v Unidentified speaker>Thank you.

466
01:05:05.472 --> 01:05:15.630
<v Unidentified speaker>Was a commitment to work together to seek funding for Phase 1C, which is the work that completes the first phase, completes the first third of the highway cover.

467
01:05:16.804 --> 01:05:22.827
<v Unidentified speaker>Part of that is we do, as David mentioned, have $30 million in right-of-way funding available.

468
01:05:22.989 --> 01:05:34.934
<v Unidentified speaker>And so as part of our commitment to doing— to progressing that work and commitment to starting the highway cover and seeking funding for it, we are looking at early acquisition of those right-of-way parcels.

469
01:05:37.757 --> 01:05:43.847
<v Unidentified speaker>There are some willing sellers in the area that could be used for construction staging and progressing that work.

470
01:05:43.943 --> 01:05:48.751
<v Unidentified speaker>And then showing our commitment as ODOT to move forward with the rest of that project.

471
01:05:49.409 --> 01:05:50.275
<v Mitch Green>Okay, thank you.

472
01:05:50.338 --> 01:05:51.219
<v Mitch Green>That's helpful.

473
01:05:51.380 --> 01:05:55.820
<v Mitch Green>I wanna move to the Governor's Transportation Funding Workgroup that you mentioned.

474
01:05:56.045 --> 01:06:05.597
<v Mitch Green>I'd like to know if tolling or congestion pricing is back in consideration after being kind of taken off the table recently.

475
01:06:07.032 --> 01:06:14.148
<v David Kim>This project team has not been close to those conversations.

476
01:06:14.590 --> 01:06:18.606
<v David Kim>I believe there is a committee that's looking at the various funding options.

477
01:06:20.070 --> 01:06:26.909
<v David Kim>Our focus has really just been on the Rose Quarter project and preparing ourselves to present and explain that project.

478
01:06:26.958 --> 01:06:36.295
<v David Kim>So I'm not in a position to speak to what other potential funding opportunities or We're going to have to go up the food chain.

479
01:06:36.568 --> 01:06:37.822
<v Mitch Green>We'll go up the food chain.

480
01:06:38.336 --> 01:06:38.753
<v Mitch Green>Thank you.

481
01:06:39.123 --> 01:06:50.496
<v Mitch Green>I just wanted to put it on the record that that was an important kind of sort of glimpse into what I think the city is going to need to— I mean, this committee even may perhaps need to discuss that, but I think we'll go up the food chain.

482
01:06:50.929 --> 01:06:51.269
<v Mitch Green>Thank you.

483
01:06:52.827 --> 01:06:58.307
<v Mitch Green>I think the last question I have is really sort of probably mostly appropriate for Director Williams.

484
01:06:58.851 --> 01:07:07.251
<v Mitch Green>But I think what I'm worried about, and there's no way to avoid this, I agree the full continuous closure is probably the most effective way to do this.

485
01:07:07.364 --> 01:07:11.789
<v Mitch Green>It's the least costly approach and you're gonna get better results most likely from it.

486
01:07:12.621 --> 01:07:16.581
<v Mitch Green>But it will send traffic off onto these surface streets.

487
01:07:16.710 --> 01:07:18.601
<v Mitch Green>I've driven these routes myself.

488
01:07:18.650 --> 01:07:19.322
<v Mitch Green>I know where they are.

489
01:07:19.996 --> 01:07:24.661
<v Mitch Green>They're right along the freeway wall and other sort of, there's interstate and the like.

490
01:07:25.688 --> 01:07:35.273
<v Mitch Green>What I'm really concerned about though is then drivers are frustrated, and in that frustration they sort of make moves that are reckless, dangerous, and put people at risk.

491
01:07:35.322 --> 01:07:43.077
<v Mitch Green>And so what are we doing to kind of anticipate that and mitigate, you know, some of those traffic safety risks?

492
01:07:44.554 --> 01:07:45.213
<v Millicent Williams>Thank you, Councilor.

493
01:07:45.679 --> 01:07:59.969
<v Millicent Williams>Our teams have been working closely together, of course, as has been As has been shared, the information about the closure began to develop over a year ago, and that is when our teams were working most closely together about what we might do.

494
01:08:00.771 --> 01:08:08.141
<v Millicent Williams>As we've gotten closer to the date, our traffic teams are engaging to talk about the mitigation strategies.

495
01:08:08.255 --> 01:08:16.769
<v Millicent Williams>We didn't show the map that we're using as a baseline for information about where we anticipate some of that traffic will go.

496
01:08:17.818 --> 01:08:34.960
<v Millicent Williams>But those are the corridors where we'll be focusing some intentional efforts to ensure that there's appropriate not just signage but adjustments to signal timing, having cameras in place to ensure that we're monitoring what's happening so that we can on the fly make changes should we need to.

497
01:08:35.652 --> 01:08:49.619
<v Millicent Williams>And again, some of that really critical communication is what we're going to be depending very heavily on, both from making sure that people know what's happening, understand what's happening, and how to best get around.

498
01:08:50.319 --> 01:09:06.020
<v Millicent Williams>Even in those spaces where we anticipate there to be significant increased capacity that we'll need to handle, again, those are the corridors where we'll be paying the most attention and making those most significant changes.

499
01:09:06.539 --> 01:09:07.180
<v Millicent Williams>It's not just about the It's infrastructure, but it's about the people that are going to be using it.

500
01:09:07.180 --> 01:09:07.220
<v Millicent Williams>Thank you.

501
01:09:07.350 --> 01:09:13.609
<v Millicent Williams>Not just one or two schools, it's several schools.

502
01:09:13.609 --> 01:09:29.109
<v Millicent Williams>And so if you're a D.C.— excuse me, a PPS parent, you've already begun to receive information that when school starts, this is going to be one of the things that you have the opportunity to plan for and around, especially if you're in close proximity to this work.

503
01:09:29.140 --> 01:09:31.970
<v Millicent Williams>So there's a great deal of coordination that's happening.

504
01:09:31.970 --> 01:09:32.529
<v Sameer Kanal>We are working We with the city staff.

505
01:09:32.529 --> 01:09:32.670
<v Millicent Williams>We are are working with the city meeting staff.

506
01:09:33.658 --> 01:09:50.823
<v Millicent Williams>As a large group monthly, but there are also meetings that are happening intermittently in between those meetings to ensure that that coordination effort is moving forward in a way that is going to be beneficial and create as little impact as possible.

507
01:09:51.722 --> 01:10:01.238
<v Millicent Williams>The numbers, while challenging in many ways to review, Don't leave us like this.

508
01:10:01.591 --> 01:10:03.019
<v Millicent Williams>You know, there is some hope.

509
01:10:03.917 --> 01:10:16.287
<v Millicent Williams>It will require a great deal of partnership, though, not just between our organizations, but the whole of community is going to have to consider how it might be able to make some adjustments to ensure that people are able to move around safely.

510
01:10:16.368 --> 01:10:17.411
<v Mitch Green>I appreciate that.

511
01:10:17.538 --> 01:10:25.787
<v Mitch Green>And then I'm sure these conversations are underway, but this seems like an opportunity to work with Public Safety Service Area to contemplate maybe some targeted—.

512
01:10:25.819 --> 01:10:26.701
<v Millicent Williams>We actually are.

513
01:10:27.649 --> 01:10:28.805
<v Millicent Williams>We actually are doing that.

514
01:10:29.110 --> 01:10:42.078
<v Millicent Williams>We have a meeting scheduled for Monday with internal support teams to begin to discuss all of the challenges that we anticipate that we'll need to address.

515
01:10:42.511 --> 01:10:43.057
<v Mitch Green>Thank you so much.

516
01:10:43.555 --> 01:10:46.222
<v Unidentified speaker>Thank you, Councilor Green.

517
01:10:46.496 --> 01:10:48.761
<v Unidentified speaker>Councilor Kanal.

518
01:10:49.998 --> 01:10:51.622
<v Sameer Kanal>Thank you, Chair Clark.

519
01:10:51.685 --> 01:10:52.264
<v Sameer Kanal>I appreciate it.

520
01:10:52.313 --> 01:10:53.163
<v Sameer Kanal>Thanks everyone for being here.

521
01:10:54.078 --> 01:11:01.127
<v Sameer Kanal>I'm— I've got a ton of questions, so I will do maybe half of mine and then I'll circle back into the, into the queue.

522
01:11:02.588 --> 01:11:05.206
<v Sameer Kanal>This is the first time I'm getting details on this.

523
01:11:05.399 --> 01:11:09.766
<v Sameer Kanal>I'll just say I'm not sure how much of this is an ODOT responsibility, but I represent this area.

524
01:11:09.814 --> 01:11:15.242
<v Sameer Kanal>This is my district, and I've gotten no offers of briefings or specific information.

525
01:11:15.354 --> 01:11:23.444
<v Sameer Kanal>I am really grateful for the number of people that an organization that are on slide 27 as people who were talked to, but not D2 folks.

526
01:11:23.976 --> 01:11:28.773
<v Sameer Kanal>And this is why it's so important that we have a D2 councilor on this committee for the first time.

527
01:11:29.628 --> 01:11:39.127
<v Sameer Kanal>I've actually been offered more briefings by community than by official staff from any agency on this project, including a couple organizations who are probably watching online or even in this room.

528
01:11:39.925 --> 01:11:42.658
<v Sameer Kanal>So I will be following up and asking for a one-on-one briefing.

529
01:11:44.079 --> 01:11:52.670
<v Sameer Kanal>I'll just say, because of the fact that there's so much interest in this publicly, we are getting a ton of outreach from our constituencies.

530
01:11:52.926 --> 01:11:59.783
<v Sameer Kanal>And I just— we're not resourced, and I don't mean money or staff, I mean information to provide out with it.

531
01:11:59.846 --> 01:12:12.958
<v Sameer Kanal>So at some point I'll probably be following up, but I would love to ask if one— if a representative from both ODOT and PBOT would be willing to join me at a town hall help explain to my constituents what's going to happen to them.

532
01:12:15.902 --> 01:12:20.283
<v David Kim>Councilor Kanal, we'd be happy to, uh, participate in a town hall, get the word out.

533
01:12:21.140 --> 01:12:22.256
<v Millicent Williams>Yes, Councilor, we'd be happy.

534
01:12:22.353 --> 01:12:30.015
<v Sameer Kanal>I appreciate that, and, and I, I'll be valuing the information as a councilor, but also as someone who takes this route fairly frequently, including this morning.

535
01:12:30.597 --> 01:12:33.831
<v Sameer Kanal>Um, so strongly support the LID project.

536
01:12:34.073 --> 01:12:37.810
<v Sameer Kanal>ABT, want to be very helpful in, in any way I can on that.

537
01:12:38.292 --> 01:12:51.796
<v Sameer Kanal>I also know that there's a lot of critical work in what's already happening— the stormwater facilities, the pedestrian and bicycle improvements to come, um, avoiding the completely unnecessary bottleneck where it goes from 3 to 2 to back to 3 in, in like a half second.

538
01:12:52.326 --> 01:12:54.911
<v Sameer Kanal>Um, it has been a problem for years in that area.

539
01:12:55.457 --> 01:12:58.154
<v Sameer Kanal>Um, so I, I do appreciate that.

540
01:12:58.266 --> 01:13:08.939
<v Sameer Kanal>I am concerned about several different things— safety So from a safety perspective, Councilor Green covered a lot of it in terms of major disruption to local residents.

541
01:13:09.979 --> 01:13:12.350
<v Sameer Kanal>And I'm not sure if ODOT knows this, but I know PBOT does.

542
01:13:14.000 --> 01:13:19.909
<v Sameer Kanal>We had a 55-ish percent reduction in traffic deaths in the other 3 districts of the city last year.

543
01:13:20.479 --> 01:13:23.770
<v Sameer Kanal>We had about a— we had one fewer in my district.

544
01:13:23.779 --> 01:13:26.619
<v Sameer Kanal>Had we had the same impact in reducing traffic reducing deaths in the other 3 districts, we would have had 2 fewer deaths.

545
01:13:26.619 --> 01:13:26.659
<v Sameer Kanal>Thank you.

546
01:13:26.686 --> 01:13:33.832
<v Sameer Kanal>Traffic deaths in D2 that we did in the other 3, I'd have 10 more neighbors and 10 more constituents from just last year.

547
01:13:34.314 --> 01:13:39.002
<v Sameer Kanal>And so because we're the worst on traffic deaths in the city, I am concerned about this.

548
01:13:39.065 --> 01:13:47.463
<v Sameer Kanal>And the data we have from PBOT is that most of that actually has to do with proximity to and the access points around the freeways.

549
01:13:47.817 --> 01:13:53.557
<v Sameer Kanal>So 84 as well, but particularly I-5 near where our high crash corridors are Interstate Killingsworth, all that.

550
01:13:54.994 --> 01:14:07.533
<v Sameer Kanal>So because these are my neighbors, this is my district, and I'm worried about lives that'll be lost and the confusion around it, I want to make sure that there's as much assistance, signage, disruption minimizing activity that we can do.

551
01:14:08.828 --> 01:14:18.319
<v Sameer Kanal>Um, and I'm concerned about— so I'll start with Greeley, uh, in a minute here, but, uh, Greeley's the best way to get around the closure, right?

552
01:14:18.414 --> 01:14:22.211
<v Sameer Kanal>So having that be closed too is concerning, right?

553
01:14:22.275 --> 01:14:22.757
<v Sameer Kanal>That's the—.

554
01:14:22.823 --> 01:14:27.922
<v Sameer Kanal>That'll be more for the later one because it kind of joins right up where you're talking about for the 5-week closure.

555
01:14:27.988 --> 01:14:34.644
<v Sameer Kanal>But is the anticipation that we're going to be putting people onto interstate entirely at that point as you come southbound on Greeley?

556
01:14:36.411 --> 01:14:36.994
<v Sameer Kanal>Yes, Councilor.

557
01:14:37.480 --> 01:14:37.658
<v Sameer Kanal>Okay.

558
01:14:38.130 --> 01:14:42.296
<v Unidentified speaker>The on-ramp to Greeley is closed so that—.

559
01:14:42.831 --> 01:14:48.144
<v Sameer Kanal>So folks wouldn't be able The on-ramp from Greeley to I-5 South?

560
01:14:48.208 --> 01:14:48.369
<v Sameer Kanal>Yep.

561
01:14:49.823 --> 01:14:56.824
<v Sameer Kanal>There's an on-ramp that joins up and makes it a 2-lane road for a while that's primarily used coming off of Swan Island.

562
01:14:56.872 --> 01:15:02.256
<v Sameer Kanal>It's got all the FedEx, UPS trucks, is most of the people who join up there.

563
01:15:03.353 --> 01:15:08.984
<v Sameer Kanal>But it ends up becoming a 2-lane road for a period of time, and so I'm concerned about that specific spot as opposed to the other 2 spots.

564
01:15:09.159 --> 01:15:09.304
<v Sameer Kanal>Thank you.

565
01:15:09.351 --> 01:15:15.699
<v Sameer Kanal>This is a place where exactly what Councilor Green was talking about, people trying to get around the traffic will think there is an opportunity to do so.

566
01:15:15.940 --> 01:15:17.595
<v Sameer Kanal>This is right by Hazelnut Grove.

567
01:15:17.707 --> 01:15:21.860
<v Sameer Kanal>This is— so there's also concerns about folks who are pedestrians in that area too.

568
01:15:22.917 --> 01:15:24.104
<v Sameer Kanal>So I just wanted to flag that.

569
01:15:26.237 --> 01:15:39.122
<v Sameer Kanal>On the maintenance side, how this will not— the plan that you are making based off of Yes.

570
01:15:39.835 --> 01:15:56.438
<v Sameer Kanal>I'm concerned that it will create greater cost for PBOT in terms of maintenance of surrounding city streets that will have more traffic diverted onto them in the case of a 5-week continuous closure than in the case of intermittent weekend closures.

571
01:15:57.266 --> 01:16:00.347
<v Sameer Kanal>And I'm not sure if there's any plan to Thank you.

572
01:16:00.444 --> 01:16:01.070
<v Sameer Kanal>I have a question for the city staff.

573
01:16:01.118 --> 01:16:05.390
<v Sameer Kanal>I know that there's been a lot of talk about the need to compensate for that increased wear and tear on roads in the city streets.

574
01:16:05.806 --> 01:16:11.555
<v Sameer Kanal>Specifically, Broadway is an example of a street that has needed some work for a while.

575
01:16:11.796 --> 01:16:13.193
<v Sameer Kanal>There's potholes all over the place.

576
01:16:14.204 --> 01:16:16.180
<v Sameer Kanal>So my— I have a 2-part question.

577
01:16:16.228 --> 01:16:21.975
<v Sameer Kanal>The ODOT side of it is, what is the mitigation for that in this plan?

578
01:16:22.810 --> 01:16:28.421
<v Sameer Kanal>And, and have you costed that out relative to interim of the weekend versus continuous closure?

579
01:16:28.824 --> 01:16:36.524
<v Sameer Kanal>And for PBOT, how are we going to be stepping up the work that PBOT does in this area to make up for that increased wear and tear?

580
01:16:36.653 --> 01:16:39.798
<v Unidentified speaker>Can I just say, Councilor Kanal, I love these questions.

581
01:16:40.363 --> 01:16:42.524
<v Unidentified speaker>It's about time we get some compensation, right?

582
01:16:43.145 --> 01:16:44.881
<v Sameer Kanal>Yeah, I'm building to that.

583
01:16:47.689 --> 01:16:56.216
<v David Kim>Well, so from an impact standpoint, I don't I don't believe that we evaluated the wear and tear on city streets with the increased traffic flow.

584
01:16:57.140 --> 01:17:03.618
<v David Kim>I'll be honest, there's no plan today to compensate the city for the increased traffic.

585
01:17:05.032 --> 01:17:08.434
<v David Kim>The focus of ODOT and the city is about safety.

586
01:17:09.143 --> 01:17:14.604
<v David Kim>We know where the hotspots are for pedestrians and cyclists and schools.

587
01:17:15.367 --> 01:17:16.713
<v David Kim>And so we have our own modeling.

588
01:17:16.974 --> 01:17:17.704
<v David Kim>We have the city's modeling.

589
01:17:18.220 --> 01:17:23.652
<v David Kim>We're connecting, identifying where the potential hotspots are, and then assessing what safety improvements can we make.

590
01:17:23.699 --> 01:17:27.881
<v David Kim>Safety is first and foremost what our focus is on during this closure.

591
01:17:28.331 --> 01:17:29.980
<v David Kim>Traffic management is the second piece.

592
01:17:30.510 --> 01:17:39.420
<v David Kim>And so we expect that as drivers experience delays in the first week, we expect there'll be changes in behavior.

593
01:17:40.605 --> 01:17:48.032
<v David Kim>I can say that 6% of the traffic that is coming from Washington people going to Washington can use I-205 because they're going through Portland.

594
01:17:48.931 --> 01:17:54.086
<v David Kim>But the hours of congestion are going to be extended about 3 hours longer in the PM peak.

595
01:17:54.167 --> 01:18:00.605
<v David Kim>People are going to— might leave earlier, but really it's the afternoon PM peak where we expect the traffic to be longer.

596
01:18:00.670 --> 01:18:09.502
<v David Kim>So I think it's something we'll have to take a look at to see where are, based on the data, where are we seeing increases in traffic volume and where are the impacts.

597
01:18:10.529 --> 01:18:11.846
<v David Kim>There may be wear and tear.

598
01:18:12.555 --> 01:18:16.296
<v David Kim>But for 5 weeks versus a year, the impacts may be different.

599
01:18:16.926 --> 01:18:18.603
<v Sameer Kanal>So I appreciate that.

600
01:18:18.828 --> 01:18:31.769
<v Sameer Kanal>I just wanna point out, so Lombard, when the road dieting happened west of I-5 on Lombard, there was little to no mitigation done for the fact that a lot of that traffic got pushed to Columbia, which is fine, but also to Willamette.

601
01:18:32.774 --> 01:18:37.634
<v Sameer Kanal>And ironically, the Willamette Boulevard right.

602
01:18:37.681 --> 01:18:39.707
<v Sameer Kanal>As well as the little streets, right?

603
01:18:39.770 --> 01:18:42.502
<v Sameer Kanal>So Chautauqua is wide enough for people to get down there, but Foss isn't.

604
01:18:43.081 --> 01:19:03.774
<v Sameer Kanal>So right next to around Columbia Park, there's all this traffic that was redirected by a— this is a permanent shift, obviously, not a temporary closure, but that's a heavier— there's a lot of heavier traffic for pedestrians and bicyclists and scooters and things like that on yeah.

605
01:19:04.479 --> 01:19:05.314
<v Sameer Kanal>On Columbia.

606
01:19:05.845 --> 01:19:23.122
<v Sameer Kanal>And because it's 2 different agencies, 2 different jurisdictions, I'm trying to ask now to ensure that we don't have what happened there, which is this completely separated out situation where people are trying to get to work fast, they're turning onto Foss, and there's a kid right there.

607
01:19:23.667 --> 01:19:32.130
<v Sameer Kanal>And I've personally watched it happen where it's like slamming on the brakes, and not just once, right on the corner of either Foss and Lombard or Foss and Lamott.

608
01:19:32.177 --> 01:19:37.845
<v Sameer Kanal>So I'm curious about that, 'cause I'm trying to say we need to get this figured out before it starts.

609
01:19:38.391 --> 01:19:44.605
<v Sameer Kanal>I understand safety on ODOT streets is great and important, and I'm glad that's your first priority.

610
01:19:45.038 --> 01:19:49.760
<v Sameer Kanal>I wanna make sure that we're not just moving the safety risk to roads that aren't built for it right now.

611
01:19:50.643 --> 01:19:54.207
<v David Kim>Right, so in terms of mitigation and addressing yes.

612
01:19:54.319 --> 01:20:01.689
<v David Kim>We recognize that there's going to be diversion, so we are collaborating with PBOT to identify what are safety measures.

613
01:20:02.105 --> 01:20:07.712
<v David Kim>We're evaluating each high corridor that has high use of pedestrians and cyclists to say this is a hotspot.

614
01:20:08.048 --> 01:20:09.699
<v David Kim>Is there more we can do in terms of signage?

615
01:20:10.212 --> 01:20:16.268
<v David Kim>Are there opportunities for us to put in speed feedback trailers to let drivers know what their speed is?

616
01:20:16.604 --> 01:20:21.297
<v David Kim>And we're going through that process right now to see what other improvements, because this is a temporary condition.

617
01:20:22.307 --> 01:20:34.471
<v David Kim>Very different equation if it's a permanent condition where we know that I don't know the specifics to Lombard, whether that was a jurisdictional transfer or not as it relates to the road diet.

618
01:20:34.520 --> 01:20:35.033
<v Unidentified speaker>It was.

619
01:20:35.306 --> 01:20:35.467
<v Unidentified speaker>Okay.

620
01:20:35.564 --> 01:20:36.608
<v Unidentified speaker>It's still yours.

621
01:20:36.752 --> 01:20:37.409
<v Millicent Williams>Okay.

622
01:20:37.618 --> 01:20:50.689
<v Millicent Williams>But happy to answer the question regarding what we might be able to do, especially in the short term, to address some of the road condition concerns that may either currently exist or that may be anticipated.

623
01:20:51.475 --> 01:20:55.654
<v Millicent Williams>Become more prominent when this happens.

624
01:20:57.207 --> 01:21:08.805
<v Millicent Williams>Typically what happens when we know an event is coming to town, PBOT goes out, assesses a route— parade, run, marathon, big bike ride— and we do go and do pretreatment.

625
01:21:08.983 --> 01:21:22.507
<v Millicent Williams>We fill potholes, we refresh striping, we do all of those things to make sure that people have as safe and comfortable So if it means that we're filling a pothole, then so be it.

626
01:21:22.556 --> 01:21:25.429
<v Millicent Williams>If it means we're doing thermoplast at a crossing, then so be it.

627
01:21:25.542 --> 01:21:29.060
<v Millicent Williams>That's what we will do in advance of a major event coming.

628
01:21:29.497 --> 01:21:41.167
<v Millicent Williams>With this, we recognize that a major event is coming, and to David's point, that coordination really is important for us to know where the spillover will potentially go so that we can make sure that we're addressing it.

629
01:21:41.216 --> 01:21:57.210
<v Millicent Williams>Councilmember Herbold, one of the things that we talked about even in yesterday's meeting as we talked about this was there are a number of city agencies that have equipment that will be going onto routes that they otherwise would not be using to get to the work that they're going to do.

630
01:21:57.643 --> 01:22:15.064
<v Millicent Williams>So we're talking about how we can make those adjustments even to either, either the pattern of work, the schedule of work, whether we put something else later or earlier to ensure that we don't find ourselves on top of each other trying to solve problems for folks who are traveling in the right-of-way.

631
01:22:15.931 --> 01:22:18.596
<v Millicent Williams>But those are things that we're going to be able to do.

632
01:22:19.784 --> 01:22:31.153
<v Millicent Williams>The maintenance operations team recognizes that there's going to be a need for us to shift the way that we operate a little bit to be able to accommodate the needs that we'll be seeing.

633
01:22:31.923 --> 01:22:39.421
<v Millicent Williams>So, so some of those response times, some of the things that we get calls about all the time, we'll be able to prioritize addressing those.

634
01:22:40.000 --> 01:22:42.987
<v Millicent Williams>Will we be able to take care of everything in advance of this closure?

635
01:22:43.067 --> 01:22:48.012
<v Millicent Williams>I cannot guarantee you that, but I can guarantee that we will try really hard to make sure that we do.

636
01:22:48.912 --> 01:22:53.824
<v Millicent Williams>The coordination is of critical importance.

637
01:22:54.371 --> 01:23:10.636
<v Millicent Williams>I have underscored that many, many times in communication with ODOT, both in writing and in conversations that this is not a place where we have an option of failure to show up well for not just the city but for the region.

638
01:23:11.230 --> 01:23:13.206
<v Millicent Williams>And so we're going to be working on that.

639
01:23:13.734 --> 01:23:14.442
<v Sameer Kanal>I appreciate that.

640
01:23:14.537 --> 01:23:33.356
<v Sameer Kanal>And I have one more question, but just to follow up on this, I think ensuring that we are— you recently sent us some information on how PBOT prioritizes prioritizes projects, and having this be a core part of the criteria to ensure that these particular roads that the, the will be the alternate routes is really important.

641
01:23:33.789 --> 01:23:49.269
<v Sameer Kanal>And since I gave one example on Greeley that I think is closer to where ODOT's jurisdiction is, I'll give one for you as well, which is further up, because I still think there'll be additional traffic even given the interstate route that you can take from Greeley.

642
01:23:49.846 --> 01:23:58.903
<v Sameer Kanal>Where the little zigzag is, up just north of Adidas headquarters, there are crosswalks there that have limited visibility.

643
01:23:59.560 --> 01:24:02.162
<v Sameer Kanal>And people come with bikes, people come jogging.

644
01:24:02.466 --> 01:24:03.976
<v Sameer Kanal>Usually if someone's walking, you can see it.

645
01:24:04.394 --> 01:24:08.712
<v Sameer Kanal>I personally have been rear-ended there stopping for somebody who came out of nowhere a few months ago.

646
01:24:09.676 --> 01:24:14.926
<v Sameer Kanal>And so I would love to see that improved in general, but I think it's particularly timely for that.

647
01:24:15.055 --> 01:24:16.951
<v Sameer Kanal>My last question, and then I'll pass it off.

648
01:24:17.421 --> 01:24:30.261
<v Sameer Kanal>There was a— there's a slide, I think it's 23, where it says, and it's been referenced here, that a lot of this is about communication to encourage drivers to plan ahead and change travel, which I assume means mode of travel if they're able.

649
01:24:31.760 --> 01:24:32.710
<v Sameer Kanal>TriMet's being cut right now.

650
01:24:33.547 --> 01:24:40.698
<v Sameer Kanal>And so I'm not sure how we can expect without additional frequency of the Yellow Yes.

651
01:24:40.747 --> 01:24:49.384
<v Sameer Kanal>I know that there's been a lot of talk about the TriMet rail line and several of the buses for folks who are taking or who could be taking transit to do so effectively.

652
01:24:50.510 --> 01:25:04.858
<v Sameer Kanal>Is there any sort of bridge funding going on to help boost up the frequency during this, you know, 5 weeks, which is also, you know, you mentioned the beginning of the school year for PPS, to ensure that TriMet is whole and that people can get around?

653
01:25:04.907 --> 01:25:15.425
<v Sameer Kanal>Because it's It doesn't work to say, instead of taking a 20-minute drive, take an hour-long transit trip that doesn't need to be an hour long, but you're waiting for most of that time, right?

654
01:25:16.039 --> 01:25:30.234
<v Sameer Kanal>So is there any plan to mitigate the effects on, not to mention that some folks might want a seat on these if they're full, are there any plans to mitigate in terms of frequency for TriMet?

655
01:25:32.484 --> 01:25:32.743
<v Unidentified speaker>Go ahead.

656
01:25:34.036 --> 01:25:34.601
<v Unidentified speaker>Thank you, Councilor.

657
01:25:34.779 --> 01:25:40.082
<v Unidentified speaker>So we have been coordinating with TriMet and unfortunately, as you mentioned, there are cuts.

658
01:25:41.905 --> 01:25:57.595
<v Unidentified speaker>We don't have funding allocated right now for additional service, but we are in conversations with them on how we can best approach this and what their ridership looks like, especially during events at Moda Center.

659
01:25:57.773 --> 01:25:59.636
<v Unidentified speaker>It already is very full during those events.

660
01:25:59.717 --> 01:26:14.207
<v Unidentified speaker>And if we're encouraging folks to take transit, So there's, there's a lot of work over the next couple months still with TriMet, but right now we do not have dedicated funding.

661
01:26:15.203 --> 01:26:19.328
<v Sameer Kanal>Yeah, I think that's something really important to mitigate for throughout this process.

662
01:26:20.100 --> 01:26:28.979
<v Sameer Kanal>By the way, the week without driving is the 4th week of the 5 weeks that you've proposed here, so I imagine there'll already be people pushing for a greater level of transit.

663
01:26:29.060 --> 01:26:30.078
<v Sameer Kanal>Level of transit ridership.

664
01:26:30.322 --> 01:26:30.920
<v Sameer Kanal>I'll pass it off here.

665
01:26:30.969 --> 01:26:31.583
<v Sameer Kanal>I have more later.

666
01:26:31.761 --> 01:26:33.380
<v Unidentified speaker>Thank you so much, Councilor Kanal.

667
01:26:33.444 --> 01:26:36.761
<v Unidentified speaker>And you asked some of my very own questions, so I appreciate that.

668
01:26:37.262 --> 01:26:38.966
<v Unidentified speaker>We'll turn to Councilor Smith now.

669
01:26:40.380 --> 01:26:40.671
<v Loretta Smith>Thank you.

670
01:26:41.123 --> 01:26:42.127
<v Loretta Smith>Thank you, Madam Chair.

671
01:26:42.935 --> 01:26:46.350
<v Loretta Smith>Thank you all for coming and giving your presentation.

672
01:26:46.884 --> 01:26:53.752
<v Loretta Smith>As a former COBIT minority contractor, I just got one of the emails from ODOT at 1:18.

673
01:26:55.122 --> 01:27:13.038
<v Loretta Smith>And I still get the, I still get the notices, um, that on Tuesday, June 16th, the Historic Albina Advisory Board and Community Oversight Advisory Committee, they'll be holding a meeting next week from 5 to 6, and the meeting will also be live streamed.

674
01:27:13.505 --> 01:27:26.703
<v Loretta Smith>So I urge my, um, my members, and I know that, uh, Councilor, uh, Kanal, he was concerned about not getting briefed on stuff, and so I would also look at that too, because Different people have different information.

675
01:27:26.768 --> 01:27:31.877
<v Loretta Smith>So that would be an opportunity for you to, uh, to look at this.

676
01:27:32.537 --> 01:27:37.698
<v Loretta Smith>And as I was thinking about this, um, I want to be real specific.

677
01:27:38.425 --> 01:27:48.635
<v Loretta Smith>I wanted to know if, if there are any explicit air quality safeguards that will be implemented for Harriet Tubman Middle School during construction.

678
01:27:49.556 --> 01:27:59.529
<v Loretta Smith>Because as you know, widening the freeway, uh, it brings active lanes closer to a historically impacted school that have had lots of issues.

679
01:28:00.122 --> 01:28:13.091
<v Loretta Smith>And so I wanted to find out if there are any zero emission or air filtration guarantees that are built into your contracts that would deal specifically with Harriet Tubman Middle School.

680
01:28:14.355 --> 01:28:15.328
<v Unidentified speaker>Yes, thank you, Councilor.

681
01:28:15.587 --> 01:28:27.161
<v Unidentified speaker>So the work that we are doing right now is north and then south of Harriet Tubman Middle School, but we do have a significant amount of work in future phases right next to Harriet Tubman Middle School.

682
01:28:27.369 --> 01:28:27.546
<v Unidentified speaker>Okay.

683
01:28:28.315 --> 01:28:40.229
<v Unidentified speaker>And that work in our initial planning stages, we've looked at their filtration system and then the emissions of equipment working right next to them.

684
01:28:41.078 --> 01:29:08.662
<v Unidentified speaker>We've met several times, this was probably 2 to 3 years ago in the early planning stages with Portland Public Schools staff, looking at their filtration system and how often we would need to replace those filters with the additional emissions that would come with equipment near the school, but also looking at low-emission equipment and working only during the summer months.

685
01:29:08.743 --> 01:29:15.421
<v Unidentified speaker>So we would not be working during the school year, but understanding that there are still summer programs that do happen at the school as well.

686
01:29:15.490 --> 01:29:15.631
<v Unidentified speaker>Right.

687
01:29:16.460 --> 01:29:16.814
<v Loretta Smith>Great.

688
01:29:17.038 --> 01:29:25.073
<v Loretta Smith>And I'm really concerned about jobs, and I'm concerned about the ability to have apprenticeships and, and those kinds of things.

689
01:29:25.587 --> 01:29:39.729
<v Loretta Smith>And so I wanted to find out if there was a percentage— I know you've already done the contract— but if there was a percentage of guarantees for minority-owned businesses and enterprises on this particular project, and if so, what were they?

690
01:29:41.713 --> 01:29:42.118
<v Unidentified speaker>Great question.

691
01:29:42.198 --> 01:29:54.256
<v Unidentified speaker>There is a percent— there is, um, goals for both, um, unfortunately the DBE rules rescinded, but we have, we have small business goals that we are still working towards as well as workforce.

692
01:29:54.385 --> 01:30:01.658
<v Unidentified speaker>I do not know those off the top of my head, but I will get them back to our, um, our team has well exceeded those goals.

693
01:30:01.996 --> 01:30:03.229
<v Unidentified speaker>We will be reporting out.

694
01:30:03.293 --> 01:30:18.006
<v Unidentified speaker>So the, the Community Oversight Advisory Committee that you mentioned is our oversight committee over our workforce and small business development, and we report to them regularly on our on our current status.

695
01:30:18.103 --> 01:30:21.024
<v Unidentified speaker>So I will, if you don't mind, I will follow up with you.

696
01:30:21.090 --> 01:30:32.199
<v Loretta Smith>That would be great because like me and many others, I was a former DBE contractor and I was stripped of my DBE status when this new administration came in.

697
01:30:32.552 --> 01:30:39.423
<v Loretta Smith>And I know there are others who had similar experiences with ODOT.

698
01:30:40.179 --> 01:30:42.523
<v Loretta Smith>And I'm wondering how many of those yes.

699
01:30:42.988 --> 01:30:50.195
<v Loretta Smith>How many of those folks, um, were able to get recertified under this new system?

700
01:30:50.935 --> 01:31:08.640
<v Loretta Smith>I didn't get recertified because I'm here on council, but I'm just curious of the, the drop-off of minority businesses because we were already underserved to begin with, and how many of those folks just never— you know, it's just like in COVID, they just never tried again.

701
01:31:08.706 --> 01:31:12.009
<v Loretta Smith>Some of the kids who during COVID they never came back to school.

702
01:31:12.201 --> 01:31:14.909
<v Loretta Smith>We lost a whole generation of children.

703
01:31:15.086 --> 01:31:20.520
<v Loretta Smith>And I think that there's so many challenges and barriers for minority businesses.

704
01:31:21.097 --> 01:31:21.962
<v Loretta Smith>That was a big one.

705
01:31:22.539 --> 01:31:31.581
<v Loretta Smith>And I know that losing that $450 million, because this project is what, close to what, $67 million?

706
01:31:32.414 --> 01:31:34.884
<v Loretta Smith>That was the project that we designed that could meet the moment.

707
01:31:34.963 --> 01:31:35.716
<v Loretta Smith>Councilor Smith.

708
01:31:36.363 --> 01:31:40.167
<v Loretta Smith>For the money that we had right now.

709
01:31:40.311 --> 01:31:44.488
<v Loretta Smith>And that's why we're doing this smaller version of the Rose Quarter project.

710
01:31:45.109 --> 01:32:00.262
<v Loretta Smith>So I'm just curious if there's some things that we can do, Director Williams, in terms of ODOT and other places, since we're going to be working on renewing the COAB.

711
01:32:00.926 --> 01:32:01.296
<v Loretta Smith>Yes.

712
01:32:01.409 --> 01:32:23.828
<v Loretta Smith>And I want to make sure that, you know, even in the restricted funds, if there's opportunities for us to, um, take some of those dollars and put it into places and spaces that would allow us to increase and to at least level set some of the apprenticeship opportunities so that some of these folks can be small businesses.

713
01:32:24.565 --> 01:32:41.868
<v Loretta Smith>And, you know, there, there are a lot of big projects, IBR and others that are in the hopper, but they're not recognizing DBEs as a critical piece to the future of the project like it was before.

714
01:32:42.143 --> 01:33:21.212
<v Loretta Smith>And so if there's anything that we do in terms of adding our technical assistance or receiving or putting out dollars, I— before I would put out some I would have some requirements to getting city money that this is— this needs to be set up so that we can, one, get folks COVID certified or have some way to certify folks and help those folks who have not gotten recertified under the new system be certified and increase the number of apprenticeships that we have because it's ridiculous.

715
01:33:21.573 --> 01:33:27.186
<v Loretta Smith>I mean, we have a lot of money traveling through our bank accounts.

716
01:33:27.300 --> 01:33:48.951
<v Loretta Smith>And, you know, this $2 billion that we just put out for our water, for our new water filtration center, I'm thinking we have an opportunity to leverage our position to be able to, through the Water Department and the Transportation Department, to make sure that we are improving the situation for minority businesses in this city.

717
01:33:49.689 --> 01:34:00.194
<v Loretta Smith>And if we don't use the, the kind of muscle that we have by putting all of these projects in partnership with ODOT and the federal government into play, then what are we doing?

718
01:34:01.189 --> 01:34:10.793
<v Loretta Smith>Why, if we're not going to leverage our position, uh, because we're, we're positioned to do all of this stuff, it just depends on what we make a priority.

719
01:34:10.842 --> 01:34:21.983
<v Loretta Smith>So I just wanted to put it on record that, um, that should be something that our city administrator and the mayor, and when you're having these leadership conversations, that this is something that's important to me.

720
01:34:22.063 --> 01:34:23.779
<v Loretta Smith>And I'll always ask you the same question.

721
01:34:23.828 --> 01:34:24.791
<v Loretta Smith>I'm very consistent.

722
01:34:25.176 --> 01:34:31.819
<v Loretta Smith>I ask the same question all the time because I want to know what's happening to our babies and what's happening to our minority communities.

723
01:34:32.332 --> 01:34:36.585
<v Loretta Smith>So that is something that I would like to follow back up with you.

724
01:34:37.466 --> 01:34:38.333
<v Millicent Williams>Thank you, Councilor.

725
01:34:38.413 --> 01:34:39.761
<v Millicent Williams>We will— thank you, Councilor.

726
01:34:39.954 --> 01:34:48.221
<v Millicent Williams>We'll make sure that we continue to do the work that we've done there is, again, a pretty— it's a significant partnership.

727
01:34:48.301 --> 01:34:49.682
<v Millicent Williams>It's a tremendous partnership, actually.

728
01:34:50.292 --> 01:34:58.722
<v Millicent Williams>And there are opportunities for us to, as I've challenged the team, do the right things regardless of what you call it.

729
01:34:59.123 --> 01:35:05.289
<v Millicent Williams>If you're doing the right things for every community, then everyone will benefit in the ways that we intend.

730
01:35:05.884 --> 01:35:07.810
<v Millicent Williams>So we do pay very close attention to that.

731
01:35:07.859 --> 01:35:07.987
<v Millicent Williams>Thank you.

732
01:35:08.131 --> 01:35:14.894
<v Millicent Williams>To that, we are working to make sure that people are prepared to take advantage of the opportunities that are going to be available.

733
01:35:15.038 --> 01:35:18.042
<v Loretta Smith>And I agree with you, you have to tell people to do the right things.

734
01:35:18.090 --> 01:35:20.018
<v Loretta Smith>But see, I know better, right?

735
01:35:20.338 --> 01:35:26.090
<v Loretta Smith>Oh yes, because we wouldn't need the Voting Rights Act or the Civil Rights Act if people would do the right thing.

736
01:35:26.137 --> 01:35:27.052
<v Loretta Smith>They don't do the right thing.

737
01:35:27.149 --> 01:35:29.623
<v Loretta Smith>You have to back that up with policies and languages.

738
01:35:29.800 --> 01:35:30.104
<v Unidentified speaker>That's right.

739
01:35:30.202 --> 01:35:33.654
<v Loretta Smith>And you have to have people like me who are going to enforce it if we got it on the books.

740
01:35:34.168 --> 01:35:37.538
<v Loretta Smith>So for me, yeah, we got to keep saying it.

741
01:35:37.684 --> 01:35:45.773
<v Loretta Smith>And sometimes I just continue to say the same thing and hopefully somebody will pick up that I'm not going to stop saying it.

742
01:35:46.029 --> 01:35:55.435
<v Millicent Williams>And we look forward to continuing to engage to ensure that we're not just reflecting that we hear you, but that we take seriously the things that you're challenging us on.

743
01:35:55.498 --> 01:35:55.595
<v Loretta Smith>Thank you.

744
01:35:55.659 --> 01:35:56.478
<v Loretta Smith>I appreciate that.

745
01:35:56.863 --> 01:35:57.761
<v Unidentified speaker>Thank you, Councilor Smith.

746
01:35:57.827 --> 01:36:01.934
<v Unidentified speaker>We depend on your consistent Um, really appreciate that.

747
01:36:01.997 --> 01:36:06.055
<v Unidentified speaker>I'm going to take the liberty of asking a couple questions, then I'll turn it back over to Councilor Kanal.

748
01:36:06.713 --> 01:36:10.756
<v Unidentified speaker>Um, I'm going to just probe on that July date, that 14-hour closure.

749
01:36:10.884 --> 01:36:13.899
<v Unidentified speaker>Can you give us a better idea when that might happen?

750
01:36:14.332 --> 01:36:17.524
<v Unidentified speaker>Uh, yeah, so it is currently scheduled for July 11th.

751
01:36:17.957 --> 01:36:19.738
<v Unidentified speaker>Oh, okay, July 11th.

752
01:36:19.801 --> 01:36:19.979
<v Millicent Williams>Great.

753
01:36:20.122 --> 01:36:21.326
<v Unidentified speaker>July 4th, that's good.

754
01:36:22.112 --> 01:36:23.490
<v Unidentified speaker>Um, okay, thank you.

755
01:36:24.197 --> 01:36:27.372
<v Unidentified speaker>And some of my other— my questions were answered earlier.

756
01:36:27.484 --> 01:36:29.810
<v Unidentified speaker>I was going I was gonna ask you, where's the freight community?

757
01:36:30.150 --> 01:36:31.475
<v Unidentified speaker>What are they thinking?

758
01:36:31.541 --> 01:36:33.091
<v Unidentified speaker>What are they planning for?

759
01:36:34.447 --> 01:36:35.809
<v Unidentified speaker>Yeah, thank you, Chair.

760
01:36:36.246 --> 01:36:39.943
<v Unidentified speaker>We have done a lot of coordination with the freight community.

761
01:36:39.992 --> 01:36:47.041
<v Unidentified speaker>So through the design process, we go to what is called the Mobility Advisory Committee.

762
01:36:47.619 --> 01:36:53.664
<v Unidentified speaker>That is a spot for coordination and official approval for the closure through the freight community.

763
01:36:54.675 --> 01:36:56.923
<v Unidentified speaker>And so that happened over the last couple years.

764
01:36:57.899 --> 01:37:06.811
<v Unidentified speaker>Actually, just this week are going back to the freight community for an update at that Mobility Advisory Committee.

765
01:37:07.631 --> 01:37:22.917
<v Unidentified speaker>We've also, both at the technical level and then at the communications level, we've gone to several meetings with the freight community specifically around the operations that they have in the area.

766
01:37:23.608 --> 01:37:25.278
<v Unidentified speaker>And there's ongoing conversations.

767
01:37:25.341 --> 01:37:25.567
<v Unidentified speaker>Thank you.

768
01:37:27.462 --> 01:37:28.956
<v Unidentified speaker>Just north of where this—.

769
01:37:29.003 --> 01:37:31.685
<v Unidentified speaker>Yeah, just north of the area, and then using I-5 South.

770
01:37:31.734 --> 01:37:36.632
<v Unidentified speaker>I mean, I know they already have issues with congestion, so this is just going to be a multiplier.

771
01:37:37.274 --> 01:37:50.235
<v Unidentified speaker>I'm going to diverge just for a second and stick my neck out, um, and try to move myself from catastrophizing here to trying to find some silver linings, to see if there are some silver linings here.

772
01:37:50.588 --> 01:37:58.510
<v Unidentified speaker>And I'm just wondering about kind of non-traditional marketing around this and see if we can find some opportunities here.

773
01:37:58.798 --> 01:38:06.029
<v Unidentified speaker>I know that sounds a little wacky, but, you know, people are going to be stuck and looking for alternatives.

774
01:38:06.110 --> 01:38:18.997
<v Unidentified speaker>And I'm just wondering if there's some sort of downtown hotel marketing opportunity here, or just where can we find some opportunities here to— I think what is it?

775
01:38:19.045 --> 01:38:19.800
<v Unidentified speaker>What is that old saying?

776
01:38:19.847 --> 01:38:22.095
<v Unidentified speaker>Make a, a silk purse out of a sow's ear.

777
01:38:22.721 --> 01:38:23.347
<v Unidentified speaker>You know what I'm saying?

778
01:38:23.765 --> 01:38:24.810
<v David Kim>That's the—.

779
01:38:24.890 --> 01:38:32.180
<v Unidentified speaker>Um, and, or I'm even thinking that, you know, we all could dress up in animal suits, you know, and go to some of these hot spots and wave signs.

780
01:38:32.292 --> 01:38:41.780
<v Unidentified speaker>And, you know, we've done that at some of the schools around, you know, uh, and just try to attract more attention of the, the drivers and, uh, get them to slow down.

781
01:38:41.845 --> 01:38:50.117
<v Unidentified speaker>Just some wacky ideas, but I'm just thinking that there might be some opportunities here to do something creative.

782
01:38:50.761 --> 01:38:50.890
<v Unidentified speaker>Yes.

783
01:38:51.082 --> 01:38:51.596
<v Loretta Smith>Oh, okay.

784
01:38:51.805 --> 01:39:19.679
<v Millicent Williams>Councilor Clark, I did want to mention one of the things that we're going to be discussing in our meeting on Monday is how we as a city might be able to encourage different behaviors, travel time shifting, encouraging people to visit a local restaurant, do a staycation, And of course, we'll continue to engage with businesses about shifting start or end times in terms of their employees.

785
01:39:20.145 --> 01:39:25.462
<v Millicent Williams>But one of the things that when I did emergency management work a million years ago—.

786
01:39:25.703 --> 01:39:26.377
<v David Kim>Right.

787
01:39:26.554 --> 01:39:34.569
<v Millicent Williams>When we would have a snowstorm invariably come at rush hour, the message was stay downtown.

788
01:39:35.548 --> 01:39:37.266
<v Millicent Williams>And go to that local restaurant.

789
01:39:37.636 --> 01:39:57.658
<v Millicent Williams>And it ended up providing first responders the opportunity and the transportation department the opportunity to clear the roads so that you didn't have people sitting on XYZ Highway or XYZ Road for hours running out of gas, losing their patience and other things while they're waiting to get home.

790
01:39:58.783 --> 01:40:08.864
<v Millicent Williams>Of course, now that there are shifts in the day, There are fewer people that are in one place at one time and looking out of the window waiting for the first snowdrop to fall.

791
01:40:09.185 --> 01:40:25.274
<v Millicent Williams>We know this is happening, so we can plan for that, and we can work with the hospitality community, the Restaurant Association, the business associations, the BIDs, or the business districts to see if there might be ways that they could help us with that.

792
01:40:26.012 --> 01:40:42.541
<v Millicent Williams>Look at doing some promotions that help to alleviate the stress that the traveling public would feel, that the roadways would feel, by having a mass exodus or mass entrance into the city either in either direction at any point during the day.

793
01:40:42.637 --> 01:40:44.123
<v Millicent Williams>So that's something that we're going to be discussing.

794
01:40:44.382 --> 01:40:44.545
<v Unidentified speaker>Great.

795
01:40:44.626 --> 01:40:47.524
<v Unidentified speaker>I'm so glad to hear you say that, Director Williams.

796
01:40:48.529 --> 01:40:51.136
<v Unidentified speaker>Maybe we could even figure out a contest.

797
01:40:51.507 --> 01:40:52.802
<v Unidentified speaker>I think that's right.

798
01:40:52.965 --> 01:40:58.427
<v Unidentified speaker>To get people interested in staying downtown, spending the night or dinner or whatever it is.

799
01:40:58.509 --> 01:41:01.435
<v Millicent Williams>Well, we do have the staycation weekend that is coming up in September.

800
01:41:02.077 --> 01:41:06.932
<v Millicent Williams>It will be paired with the Sunday Parkways that's in September, the Downtown Sunday Parkways.

801
01:41:07.192 --> 01:41:08.086
<v Millicent Williams>What better time?

802
01:41:08.409 --> 01:41:09.612
<v Millicent Williams>Better time.

803
01:41:09.725 --> 01:41:10.582
<v Unidentified speaker>Good timing.

804
01:41:10.918 --> 01:41:11.514
<v Unidentified speaker>Excellent timing.

805
01:41:12.204 --> 01:41:12.960
<v Unidentified speaker>Thank you so much.

806
01:41:13.168 --> 01:41:13.988
<v Unidentified speaker>Councilor Kanal.

807
01:41:15.837 --> 01:41:16.094
<v Sameer Kanal>Thank you.

808
01:41:16.784 --> 01:41:18.359
<v Sameer Kanal>I guess I'll start there.

809
01:41:18.632 --> 01:41:19.194
<v Sameer Kanal>I like the idea.

810
01:41:20.425 --> 01:41:26.645
<v Sameer Kanal>I want to make sure it's not just downtown though, because the small businesses in this area are going to be affected very heavily.

811
01:41:26.759 --> 01:41:28.427
<v Sameer Kanal>I have a few questions about that.

812
01:41:30.082 --> 01:41:44.305
<v Sameer Kanal>We know that some of the interstate travel is going to be diverting to 205, and some of the businesses, you know, I'm thinking about up in Jantzen Beach, Hayden Island, Delta Park area, Jubitz, that sort of area, right, are going to be affected by the lack of traffic.

813
01:41:44.354 --> 01:41:44.404
<v Sameer Kanal>Sure.

814
01:41:44.931 --> 01:41:56.814
<v Sameer Kanal>Or less traffic that are coming through from those— you said 6%, but I imagine there's more that's within the sort of catchment area we're talking about between the 205 area.

815
01:41:57.150 --> 01:42:01.085
<v Sameer Kanal>So wanted to talk about how we're supporting those businesses.

816
01:42:01.212 --> 01:42:10.189
<v Sameer Kanal>I don't think there's anyone from Prosper here today, but I wanted to follow up and maybe ask if you're aware of anything from the Prosper side in terms of providing support to small businesses.

817
01:42:10.766 --> 01:42:13.431
<v Sameer Kanal>I don't know.

818
01:42:14.171 --> 01:42:18.314
<v Millicent Williams>I don't think— I know we can talk.

819
01:42:18.409 --> 01:42:19.438
<v Millicent Williams>We can talk about it.

820
01:42:20.079 --> 01:42:25.329
<v Millicent Williams>I was looking at Caitlin to see if there had been some conversations with Prosper.

821
01:42:25.618 --> 01:42:25.939
<v Millicent Williams>Not yet.

822
01:42:26.278 --> 01:42:30.533
<v Millicent Williams>But thank you for placing it in our consciousness.

823
01:42:30.613 --> 01:42:51.310
<v Millicent Williams>We will make sure that as a part of this conversation, we're looking not just, like you said, at the downtown, but the, the full catchment area, the full project impact area, so that we can make sure that there are strategies in place to support businesses large and small, mom-and-pops all the way up to your Fred Meyers, to make sure that folks are able to do everything that they need to do.

824
01:42:51.726 --> 01:42:59.483
<v Millicent Williams>And when I talk about a Fred Meyer, I'm also talking about it from us going there to get our groceries, but also Fred Meyer being able to deliver said groceries.

825
01:42:59.899 --> 01:43:11.926
<v Millicent Williams>So all of those things are are really, really important, and continuity is something that we can't risk not having in the city.

826
01:43:12.135 --> 01:43:15.314
<v Millicent Williams>So I'll make sure that we talk about that with Prosper.

827
01:43:15.636 --> 01:43:16.792
<v Sameer Kanal>Yeah, and I appreciate that.

828
01:43:16.840 --> 01:43:23.600
<v Sameer Kanal>I think I'm really glad you brought up their ability to get goods to the place.

829
01:43:23.841 --> 01:43:41.134
<v Sameer Kanal>And obviously this is not PBOT's responsibility to solve, but I'm just going to put this in I just wanna put into the record for SEDSA and Prosper, which is, you know, when I started working at the city in 2021, I used to have to go to different Fred Meyers actually because the Lombard and Interstate one wasn't able to get as much restocked.

830
01:43:41.181 --> 01:44:00.815
<v Sameer Kanal>And that was not because of necessarily exclusively things related to road work, but it was a question of like you could always go to a different part of the city and find what you were looking for, but you could 70% of the time find what you're looking for at Lombard and Interstate.

831
01:44:00.863 --> 01:44:02.975
<v Sameer Kanal>And St. Johns got it even worse at some times.

832
01:44:03.024 --> 01:44:06.978
<v Sameer Kanal>So I think this is an important thing to keep in mind.

833
01:44:09.614 --> 01:44:13.501
<v Sameer Kanal>I asked about the transit side from the perspective of boosting it.

834
01:44:13.921 --> 01:44:15.783
<v Sameer Kanal>Do we know if buses are gonna be rerouted?

835
01:44:15.864 --> 01:44:16.949
<v Sameer Kanal>And if so, which ones and how?

836
01:44:18.500 --> 01:44:20.828
<v Unidentified speaker>Councilor, there will not be any bus rerouting.

837
01:44:21.408 --> 01:44:22.981
<v Sameer Kanal>Great, good to hear.

838
01:44:24.636 --> 01:44:26.179
<v Sameer Kanal>I know I'm jumping around a little bit.

839
01:44:26.243 --> 01:44:28.011
<v Sameer Kanal>This is not— it was written kind of in the slide order.

840
01:44:30.140 --> 01:44:37.020
<v Sameer Kanal>NEBA, the Northeast Broadway Business Association, is a, I think, a good group to reach out to for what we were just talking about.

841
01:44:37.069 --> 01:44:44.458
<v Sameer Kanal>But also, your slide 27 had all the folks that you have talked to, and slide 28 had folks that are going to be talked to.

842
01:44:44.587 --> 01:44:47.953
<v Sameer Kanal>I would love to see some of the local business districts added to the list.

843
01:44:48.050 --> 01:44:57.043
<v Sameer Kanal>So NEBA, Soul District, Mississippi, Overlook Village, and, and in particular Lloyd, I think, is kind of the most adjacent to the area we're talking about here.

844
01:44:57.733 --> 01:45:02.061
<v Sameer Kanal>Um, as, as groups to reach out to, I'm happy to help connect as well.

845
01:45:03.024 --> 01:45:08.554
<v Unidentified speaker>Um, yeah, and Councilor, um, this is a, I would say, a summarized list.

846
01:45:08.634 --> 01:45:16.514
<v Unidentified speaker>We have a much more extensive list that breaks down some of these kind of categories into, into further business associations, and those that you mentioned are on that list.

847
01:45:17.173 --> 01:45:30.432
<v Sameer Kanal>Okay, um, I would love to advocate here and maybe another place as well, uh, for, um, the work, you know, is the work also going to be done at night?

848
01:45:31.296 --> 01:45:37.198
<v Sameer Kanal>And, um, as a lot of what we're talking about here, because of a 5-week closure, I imagine there's already a plan for some of it.

849
01:45:37.792 --> 01:45:42.913
<v Sameer Kanal>But I think there was a conversation about prioritizing intermittent, sometimes day, sometimes night, a mix.

850
01:45:43.154 --> 01:45:54.122
<v Sameer Kanal>And I think putting more of it on the night side makes sense in this area just because we're not— when you get up to the further north areas, then you've got residential, but there's a lot less here.

851
01:45:54.716 --> 01:46:05.033
<v Sameer Kanal>And so I'm trying to avoid affecting folks because I appreciate— I had in my notes to talk about Harry and air quality, but there's also noise pollution, and I wanted to talk about that as well.

852
01:46:05.400 --> 01:46:09.393
<v Sameer Kanal>So, you know, folks going to events in that area and having the impact.

853
01:46:09.488 --> 01:46:10.931
<v Sameer Kanal>So, yes.

854
01:46:11.171 --> 01:46:19.475
<v Unidentified speaker>So, Councilor, for the I-5 closure, both the 14-hour closure and the 5-week closure, work will be going 24/7.

855
01:46:20.229 --> 01:46:26.930
<v Unidentified speaker>We will have crews out there every hour of the day doing the work to get it done as quickly as possible.

856
01:46:27.345 --> 01:46:39.439
<v Unidentified speaker>For other work that we've been doing, we have had several intermittent nightly closures We were— we've shifted traffic a couple different times doing work in the median and now over on the bridge barrier.

857
01:46:39.583 --> 01:46:41.122
<v Unidentified speaker>And a lot of that is happening at night.

858
01:46:41.270 --> 01:46:41.368
<v Unidentified speaker>Yeah.

859
01:46:41.863 --> 01:46:44.055
<v Sameer Kanal>I have seen with my own eyes.

860
01:46:46.380 --> 01:46:51.337
<v Sameer Kanal>Councilor Green asked a question about the lid and the sort of timing there.

861
01:46:51.644 --> 01:46:57.572
<v Sameer Kanal>There was a lot in that response, but what I took away is that right now we have funding for the bridge barrier.

862
01:46:58.126 --> 01:47:01.137
<v Sameer Kanal>Expansion of the freeway for the— but not for the lid.

863
01:47:01.640 --> 01:47:02.206
<v Sameer Kanal>Is that accurate?

864
01:47:02.270 --> 01:47:05.478
<v Sameer Kanal>Am I— that was my interpretation of what I was hearing.

865
01:47:06.729 --> 01:47:07.599
<v Unidentified speaker>Yes, plus.

866
01:47:07.728 --> 01:47:13.268
<v Unidentified speaker>So, Councilor, we have funding for Phase 1A and 1B.

867
01:47:13.542 --> 01:47:23.085
<v Unidentified speaker>So that is work primarily— there's the stormwater work at the north end, but primarily that's the bridge work at the south end of the project.

868
01:47:23.546 --> 01:47:28.643
<v Unidentified speaker>It does get a portion of the freeway expansion and auxiliary lanes.

869
01:47:28.690 --> 01:47:35.503
<v Unidentified speaker>It really only gets us that one auxiliary lane from I-84 down to the Morrison Bridge exit.

870
01:47:35.841 --> 01:47:47.046
<v Unidentified speaker>It doesn't get any of the northbound auxiliary lanes or the auxiliary lanes for the rest of the southbound from I-84 down to— or from, sorry, I-405 down to Moda Center.

871
01:47:47.430 --> 01:47:51.390
<v Unidentified speaker>So it gets a small portion of the auxiliary lane and the freeway work.

872
01:47:52.175 --> 01:47:56.952
<v Unidentified speaker>And then as we move forward and continue to build you know, get funding.

873
01:47:57.224 --> 01:48:00.604
<v Unidentified speaker>I'm hopeful that we get funding for the remainder of the project.

874
01:48:00.668 --> 01:48:06.550
<v Unidentified speaker>And once we hit the highway cover, the highway work and the highway cover work go in tandem.

875
01:48:06.677 --> 01:48:15.876
<v Unidentified speaker>So we will build a portion of the auxiliary lanes underneath the portion of the highway cover that we are working, and we'll continue to do that work as we move north.

876
01:48:16.372 --> 01:48:17.430
<v Sameer Kanal>Okay, that makes sense.

877
01:48:18.761 --> 01:48:31.760
<v Sameer Kanal>And another thing to just kind of put in the record, because I believe what you're saying I think the most important thing here is for maybe the legislature and ODOT leadership more than the region folks, if we expand the freeway and we don't end up building the lid, there's going to be people with pitchforks.

878
01:48:32.242 --> 01:48:35.243
<v Sameer Kanal>And I might well be one of them as well.

879
01:48:35.292 --> 01:48:39.354
<v Sameer Kanal>So I wanted to get that out there because that's the primary concern.

880
01:48:39.403 --> 01:48:46.435
<v Sameer Kanal>I think there's a lot of folks who are very against expanding the freeway but understand that it may be necessary in order to get AVT done.

881
01:48:47.109 --> 01:48:48.957
<v Sameer Kanal>And so the linkage of that is really vital.

882
01:48:49.502 --> 01:48:55.105
<v Unidentified speaker>I'm sorry, I'm just gonna remind you, we only have about maximum 10 minutes, and I know Councilor Green has some more questions too.

883
01:48:55.154 --> 01:48:57.563
<v Sameer Kanal>Sorry, I got 2 more, and one's very quick.

884
01:48:58.671 --> 01:49:04.274
<v Sameer Kanal>In response to earlier Councilor Green question, Director Williams, you said you had a map of what the diversions would be.

885
01:49:04.371 --> 01:49:05.126
<v Sameer Kanal>Can you share that?

886
01:49:05.253 --> 01:49:08.721
<v Sameer Kanal>'Cause I think that's something that all of us should have, but obviously D2.

887
01:49:09.027 --> 01:49:09.926
<v Millicent Williams>We'd be happy to share that, yeah.

888
01:49:10.391 --> 01:49:19.271
<v Sameer Kanal>And then, Has there been any conversation about the mayor relaxing his guidance on return to office during this period of time for North Portlanders?

889
01:49:20.171 --> 01:49:31.217
<v Millicent Williams>It's my understanding that the city administrator, mayor, and Deputy City Administrator Warren are talking about what options might be available for us to consider during this time.

890
01:49:32.069 --> 01:49:34.412
<v Sameer Kanal>That sounds great, and I really appreciate it.

891
01:49:34.461 --> 01:49:38.458
<v Sameer Kanal>And I'll follow up with you about the other thing, which is MLK-specific street closures.

892
01:49:38.636 --> 01:49:39.935
<v Sameer Kanal>Absolutely.

893
01:49:40.481 --> 01:49:41.671
<v Unidentified speaker>Thank you, Councilor Kanal.

894
01:49:41.783 --> 01:49:42.554
<v Unidentified speaker>Councilor Green.

895
01:49:43.372 --> 01:49:47.403
<v Mitch Green>Uh, I just got back in the queue because, Councilor Clark, you raised something I thought was interesting.

896
01:49:47.466 --> 01:49:55.511
<v Mitch Green>Is in our districts on Vermont, we oftentimes have this little event where we councilors will stand out there.

897
01:49:55.655 --> 01:49:57.390
<v Mitch Green>You and me and Eric have been there before.

898
01:49:58.802 --> 01:50:07.105
<v Mitch Green>Yeah, we, we could do those sorts of things and scale this to the other districts and maybe I guess you'd have to properly publicly notice this.

899
01:50:07.768 --> 01:50:13.792
<v Mitch Green>We wouldn't talk about any policy, but we can imagine having the committee out at one of these things waving sort of slow down signs.

900
01:50:13.840 --> 01:50:14.471
<v Mitch Green>I think that could be—.

901
01:50:14.471 --> 01:50:16.061
<v Millicent Williams>We're happy to give you a permit to do that.

902
01:50:17.470 --> 01:50:18.488
<v Mitch Green>Yeah, we want to stay above board.

903
01:50:18.552 --> 01:50:19.911
<v Millicent Williams>That was in jest, but yes.

904
01:50:20.007 --> 01:50:20.217
<v Mitch Green>Thanks.

905
01:50:20.817 --> 01:50:22.287
<v Mitch Green>I don't want to get on the wrong side of history here.

906
01:50:22.417 --> 01:50:22.514
<v Unidentified speaker>No.

907
01:50:23.970 --> 01:50:24.146
<v Unidentified speaker>Great.

908
01:50:24.195 --> 01:50:27.835
<v Unidentified speaker>Well, I think that's really a part of keeping Portland innovative and interesting.

909
01:50:28.033 --> 01:50:29.779
<v Unidentified speaker>I mean, you know, we were in the New York Times thank you.

910
01:50:29.779 --> 01:50:37.840
<v Unidentified speaker>We've done some really interesting things at times with our frog suits, so why can't we do something equally interesting on a major shutdown project like this?

911
01:50:37.840 --> 01:50:39.220
<v Unidentified speaker>There's nothing says that we can't do it.

912
01:50:39.220 --> 01:50:40.159
<v Unidentified speaker>It's just our own creativity.

913
01:50:41.199 --> 01:50:43.279
<v Unidentified speaker>So I don't think there are any more questions.

914
01:50:43.279 --> 01:50:44.979
<v Unidentified speaker>I just really want to thank you.

915
01:50:44.979 --> 01:50:46.960
<v Unidentified speaker>This has been an excellent presentation.

916
01:50:47.479 --> 01:50:48.800
<v Unidentified speaker>Thank you for taking all our questions.

917
01:50:48.979 --> 01:50:52.869
<v Unidentified speaker>I know we probably have more as we go along, and we may want to do a check-in.

918
01:50:53.399 --> 01:51:00.542
<v Unidentified speaker>And I realize that July is kind of a, an experiment, you know, a, a one-day trial before we get to September.

919
01:51:01.603 --> 01:51:02.838
<v Unidentified speaker>So we'll see how that goes.

920
01:51:02.952 --> 01:51:04.332
<v Unidentified speaker>But thank you all very much.

921
01:51:04.412 --> 01:51:05.408
<v Unidentified speaker>It was very impressive.

922
01:51:05.521 --> 01:51:06.613
<v Unidentified speaker>I really appreciate it.

923
01:51:07.271 --> 01:51:15.319
<v Unidentified speaker>And with that, colleagues, our next meeting is Tuesday, June the 23rd.

924
01:51:15.720 --> 01:51:29.270
<v Unidentified speaker>We're finally going to get an update on asset management and where that plan is, and we We may have other things coming, some potential items from our colleagues and from executive items from PBOT potentially.

925
01:51:29.350 --> 01:51:31.627
<v Unidentified speaker>So, and that will be hopefully a 3-hour meeting.

926
01:51:31.707 --> 01:51:33.190
<v Unidentified speaker>So this is an abbreviated meeting.

927
01:51:33.641 --> 01:51:38.188
<v Unidentified speaker>But thank you all so much, and I will adjourn the meeting of the Public Works Committee.

928
01:51:42.382 --> 01:51:43.770
<v Millicent Williams>Thank you.