WEBVTT

1
00:01:21.507 --> 00:01:22.358
<v Jamie Dunphy>Good morning.

2
00:01:23.335 --> 00:01:27.424
<v Jamie Dunphy>I am now calling to order this work session of the Portland City Council.

3
00:01:27.504 --> 00:01:31.977
<v Jamie Dunphy>It is Thursday, May 7th at 9:30 a.m. Bing!

4
00:01:33.435 --> 00:01:38.965
<v Jamie Dunphy>Colleagues, we have a tight timeline today again, as we do, well, every time we show up on this dais.

5
00:01:39.430 --> 00:01:45.971
<v Jamie Dunphy>We're going to be hearing from the second part of our Community and Economic Development Service Area.

6
00:01:47.462 --> 00:01:51.805
<v Jamie Dunphy>As I mentioned, we have 3— well, we have 4 big areas to get through today.

7
00:01:52.927 --> 00:02:00.013
<v Jamie Dunphy>We have the DCA's office, the Spectator Venues, Arts Prosper, Children's Levy, and Portland Clean Energy Fund in 3 separate presentations.

8
00:02:00.109 --> 00:02:00.650
<v Jamie Dunphy>Thank you.

9
00:02:00.650 --> 00:02:00.650
<v Jamie Dunphy>Thank you, Deputy City Administrator Donnie Oliveira.

10
00:02:00.650 --> 00:02:01.730
<v Jamie Dunphy>Thank you, Deputy City Manager Tracy Warren, for those presentations.

11
00:02:01.730 --> 00:02:05.629
<v Jamie Dunphy>There is— I'll be direct, there's not enough time for everyone to speak on every topic today.

12
00:02:06.670 --> 00:02:12.050
<v Jamie Dunphy>This service area is too large and too diverse to be handled in 2 days, at least not with its current organizational chart.

13
00:02:12.050 --> 00:02:15.150
<v Jamie Dunphy>So you all have the agenda which shows the timelines.

14
00:02:15.150 --> 00:02:16.030
<v Jamie Dunphy>You should have the agenda.

15
00:02:16.030 --> 00:02:16.879
<v Dan Ryan>I don't know that you do.

16
00:02:17.789 --> 00:02:23.639
<v Jamie Dunphy>We need to finish our work today, so please maintain situational awareness so we can collectively do the work we need to do.

17
00:02:23.669 --> 00:02:26.120
<v Jamie Dunphy>So I'm going to welcome up DCA Donnie Oliveira.

18
00:02:27.798 --> 00:02:36.871
<v Jamie Dunphy>And as we've done, uh, Donnie, would you rather do all the presentations and then Q&A, or would you rather do presentation, Q&A, presentation, Q&A?

19
00:02:36.950 --> 00:02:38.969
<v Donnie Oliveira>Thank you for the question, Councilor— Council President.

20
00:02:39.194 --> 00:02:39.450
<v Donnie Oliveira>It's—.

21
00:02:39.915 --> 00:02:42.480
<v Raymond C. Lee>I would say do all the presentation, then go to Q&A.

22
00:02:42.800 --> 00:02:43.522
<v Raymond C. Lee>Get it all out the way.

23
00:02:44.084 --> 00:02:45.574
<v Jamie Dunphy>Okay, let's do that then.

24
00:02:45.703 --> 00:02:51.473
<v Jamie Dunphy>So we're going to hear all of our presentations, and then we will jump in.

25
00:02:51.520 --> 00:02:52.579
<v Jamie Dunphy>So take it away.

26
00:02:52.836 --> 00:02:53.396
<v Donnie Oliveira>All right, thank you.

27
00:02:53.877 --> 00:03:01.204
<v Donnie Oliveira>All right, Council President, Vice President, Donnie Oliveira, for the record, this is part 2 of our service areas presentations to you all.

28
00:03:01.751 --> 00:03:02.506
<v Donnie Oliveira>Next slide, please.

29
00:03:08.270 --> 00:03:09.366
<v Donnie Oliveira>All right, just go to next slide.

30
00:03:09.415 --> 00:03:11.384
<v Donnie Oliveira>Let's get through this part fast because we have a lot to cover.

31
00:03:12.175 --> 00:03:21.407
<v Donnie Oliveira>So, councilors, you saw this slide yesterday, but I want to acknowledge that we have updated this slide to shift from showing our proposed budget in millions to billions.

32
00:03:21.947 --> 00:03:23.800
<v Donnie Oliveira>Per Councilor Smith's request.

33
00:03:24.460 --> 00:03:25.524
<v Donnie Oliveira>So just acknowledging that.

34
00:03:25.830 --> 00:03:43.045
<v Donnie Oliveira>And once again, just for the, for the public who are tuning in today, that 695-person number reflects the full service area staff, including Prosper Portland staff, who are a vital part of our service area but are not technically city staff.

35
00:03:43.787 --> 00:03:44.415
<v Donnie Oliveira>Next slide, please.

36
00:03:46.864 --> 00:03:48.925
<v Donnie Oliveira>Again, just showing our organizational structure.

37
00:03:49.465 --> 00:03:56.050
<v Donnie Oliveira>I'm just noting that Prosper Prosper Portland is noted distinctly here to reflect their unique partnership with the city.

38
00:03:56.955 --> 00:04:08.318
<v Donnie Oliveira>Although they are not a city bureau, they are essential to the work that the city does to deliver community economic development goals and strategies and directions from this body.

39
00:04:09.334 --> 00:04:09.955
<v Donnie Oliveira>Next slide, please.

40
00:04:12.620 --> 00:04:32.266
<v Donnie Oliveira>I also shared this slide yesterday, but again, it's important just to reflect for those watching that a significant portion of this service area's budget goes directly to community, whether it be through the children's levy, the Clean Energy Fund, arts tax investments, our tax increment financing investments from Prosper and the Housing Bureau.

41
00:04:33.069 --> 00:04:43.286
<v Donnie Oliveira>The point is, is that we have a lot of different resources through grants and loans, direct investments that really deliver a resilient, equitable, sustainable, and prosperous future for the City of Portland.

42
00:04:44.440 --> 00:04:44.990
<v Donnie Oliveira>Next slide, please.

43
00:04:46.555 --> 00:04:52.040
<v Donnie Oliveira>And again, this slide was shared yesterday, uh, just sharing our financial overview by both bureau and by fund.

44
00:04:52.137 --> 00:05:00.776
<v Donnie Oliveira>Uh, obviously the most significant portion here is in BPS, which reflects the full balanced budget of the Portland Clean Energy Fund.

45
00:05:02.161 --> 00:05:02.951
<v Donnie Oliveira>Okay, next slide.

46
00:05:04.273 --> 00:05:06.125
<v Donnie Oliveira>Okay, this is first new slide of the day.

47
00:05:06.771 --> 00:05:12.973
<v Donnie Oliveira>This reflects the changes to our service area's staffing capacity through the core services realignment.

48
00:05:13.069 --> 00:05:23.108
<v Donnie Oliveira>You'll you'll notice that the most significant transfer is in the technology area, which is largely coming out of permitting development and BPS.

49
00:05:23.733 --> 00:05:27.805
<v Donnie Oliveira>A majority of these staff though will stay in their home bureaus to support the specific needs of the bureaus.

50
00:05:28.961 --> 00:05:35.326
<v Donnie Oliveira>But this is a part of the citywide strategy to gain more efficiency through realignment and a core services model.

51
00:05:36.079 --> 00:05:46.615
<v Donnie Oliveira>I think what we're looking for here, and we've seen this already through communications, which has already been implemented, is a chance for us to balance our resources where they're needed at any particular time.

52
00:05:47.557 --> 00:05:48.810
<v Donnie Oliveira>Okay, next slide, please.

53
00:05:50.279 --> 00:05:59.218
<v Donnie Oliveira>All right, so this is the beginning of our content, and I will take this one to start before handing it over to the directors to cover their respective areas.

54
00:05:59.920 --> 00:06:07.475
<v Donnie Oliveira>So the Office of the Deputy City Administrator is my shop that provides the overall service area guidance on policy and project coordination.

55
00:06:08.841 --> 00:06:17.317
<v Donnie Oliveira>Focusing on, on the ability to work with you all in your offices to get things through council, whether it be your policy agendas, whether it be new programs that we're briefing you on.

56
00:06:17.992 --> 00:06:19.982
<v Donnie Oliveira>We coordinate that out of the service area.

57
00:06:20.785 --> 00:06:27.574
<v Donnie Oliveira>The proposed budget is inclusive of smaller programs that make up the Office of the Deputy City Administrator.

58
00:06:28.105 --> 00:06:32.841
<v Donnie Oliveira>Note the proposed staff includes the FTE as a part of the core services realignment.

59
00:06:33.225 --> 00:06:34.879
<v Donnie Oliveira>Not all those staff report up to me.

60
00:06:35.088 --> 00:06:35.281
<v Donnie Oliveira>That's—.

61
00:06:35.634 --> 00:06:45.757
<v Donnie Oliveira>Those are just We're just capturing that to show that the staff that are moving from the bureaus to the core services out of business ops are just captured in this, in this particular way for this slide.

62
00:06:46.338 --> 00:06:47.016
<v Donnie Oliveira>Next slide, please.

63
00:06:50.194 --> 00:07:10.064
<v Donnie Oliveira>For our particular budget, a significant portion of the funds that you see here are coming from other funds, and we make a very modest amount of general fund, just making up about $2.5 million for the staff and the internal services that make up our service area.

64
00:07:11.766 --> 00:07:23.331
<v Donnie Oliveira>The key takeaway here is that, you know, when we think about these roles and what we're doing here, it's really in support of our coordination with council and ensuring the bureaus are working on the same page.

65
00:07:23.396 --> 00:07:29.663
<v Donnie Oliveira>It's the idea of a one-city model starts with the office of the DCA and so forth.

66
00:07:30.922 --> 00:07:31.788
<v Donnie Oliveira>Next slide, please.

67
00:07:33.541 --> 00:07:35.697
<v Donnie Oliveira>And again, this is just the FTE summary.

68
00:07:36.346 --> 00:07:49.944
<v Donnie Oliveira>We'll flag again just for situational awareness that that large FTE number reflects the realignment positions, and really the core group of FTE in the DCA's offices is 6.

69
00:07:51.992 --> 00:07:52.235
<v Donnie Oliveira>All right.

70
00:07:52.300 --> 00:07:53.000
<v Donnie Oliveira>Next slide, please.

71
00:07:54.425 --> 00:07:54.490
<v Donnie Oliveira>Okay.

72
00:07:54.538 --> 00:07:55.865
<v Donnie Oliveira>Now we're into the decision packages.

73
00:07:55.963 --> 00:07:58.665
<v Donnie Oliveira>We wanted to start with this one since it gained some interest.

74
00:07:59.377 --> 00:08:05.172
<v Donnie Oliveira>The Downtown Marketing Initiative is a component of a coordinated multiyear recovery strategy focused on downtown.

75
00:08:05.851 --> 00:08:08.540
<v Donnie Oliveira>This is focused on overall reputational improvement.

76
00:08:08.622 --> 00:08:14.480
<v Donnie Oliveira>It funds several different programs in the downtown this has been an ongoing initiative.

77
00:08:14.560 --> 00:08:15.201
<v Donnie Oliveira>This is not new.

78
00:08:16.083 --> 00:08:18.678
<v Donnie Oliveira>In fact, this is in our current budget that was adopted by council.

79
00:08:19.254 --> 00:08:22.475
<v Donnie Oliveira>It has a long history going back to funding from PBOT.

80
00:08:23.115 --> 00:08:27.218
<v Donnie Oliveira>Where you see it like in this way today is a chance for us to daylight it.

81
00:08:27.458 --> 00:08:32.264
<v Donnie Oliveira>It used to be in a special appropriation, so it was largely not as explicit as a decision package.

82
00:08:32.664 --> 00:08:35.437
<v Donnie Oliveira>So this year for increased transparency, we brought it up.

83
00:08:35.998 --> 00:08:38.994
<v Donnie Oliveira>And so you can see it in this way as a decision package out of the service area.

84
00:08:39.778 --> 00:08:41.845
<v Donnie Oliveira>It would be implemented by Prosper Portland.

85
00:08:42.500 --> 00:08:45.019
<v Donnie Oliveira>But we wanted just to daylight that for you here.

86
00:08:47.210 --> 00:08:47.815
<v Donnie Oliveira>Next slide, please.

87
00:08:50.370 --> 00:08:54.924
<v Donnie Oliveira>And this one is more administrative but important just to continue the work of our Permit Improvement Team.

88
00:08:55.697 --> 00:09:09.714
<v Donnie Oliveira>This was a group that we spoke quite a bit about yesterday, but as Councilor Ryan mentioned, the prior form of government created the Permit Improvement Team to work across the service areas to it says in the name, improve our permitting processes.

89
00:09:10.461 --> 00:09:19.197
<v Donnie Oliveira>This is a request to carry over the remainder of that funding, which is $120,000, that specifically focuses on the Digital Services Division at PP&D.

90
00:09:19.424 --> 00:09:25.804
<v Donnie Oliveira>This is us improving our technology systems and how we do our intake for customers within PP&D.

91
00:09:27.509 --> 00:09:28.601
<v Donnie Oliveira>All right, next slide, please.

92
00:09:29.421 --> 00:09:33.481
<v Donnie Oliveira>Okay, so now we're specifically talking about spectator venues here.

93
00:09:33.888 --> 00:09:37.418
<v Donnie Oliveira>It's a small but mighty team of 3 that focuses on the oversight of our largest venues.

94
00:09:39.245 --> 00:09:42.706
<v Donnie Oliveira>It works on supporting travel and tourism and visitor development efforts.

95
00:09:43.427 --> 00:09:52.369
<v Donnie Oliveira>Collectively, these venues that are overseen with overseeing the Spectator Venues Program attract millions of visitors every year and generate millions of dollars that support our local economy.

96
00:09:53.427 --> 00:10:02.753
<v Donnie Oliveira>The team is led by Carl Lyle, who's our Spectator Venues Program Manager, and supports the operation of the city-owned sports venues through long-term agreements that are tailored to each specific venue.

97
00:10:02.897 --> 00:10:04.916
<v Donnie Oliveira>So think Providence Park, Moda Center, et cetera.

98
00:10:06.567 --> 00:10:15.287
<v Donnie Oliveira>Generally, the city pays for some facility capital costs and debt service associated with major renovations and receives revenues from ticket fees and parking in the city's garages.

99
00:10:16.345 --> 00:10:25.866
<v Donnie Oliveira>The Spectator Venues Program also plays an active role in supporting travel, tourism, and economic development through partnerships with our partners at Travel Portland and Sport Oregon.

100
00:10:26.845 --> 00:10:27.389
<v Donnie Oliveira>Next slide, please.

101
00:10:28.880 --> 00:10:31.317
<v Donnie Oliveira>So this is a breakdown of the fund.

102
00:10:32.167 --> 00:10:48.748
<v Donnie Oliveira>It's funded through the Spectator Venues and Visitor Activities Fund with the revenue originating from ticket fees, parking parking revenues and an allocation from the Multnomah County Visitor Facilities Trust account, which is funded by a 2.5% transient lodging tax surcharge and a 2.5% vehicle rental tax surcharge.

103
00:10:49.567 --> 00:10:52.586
<v Donnie Oliveira>The program is maintaining about a $30 million base budget.

104
00:10:53.341 --> 00:10:57.245
<v Donnie Oliveira>You'll notice that this particular program does not have any decision packages.

105
00:10:57.326 --> 00:11:05.839
<v Donnie Oliveira>It's largely self-sustaining, although it did incur a $287,000 realignment cost, which was fully offset by the contingency from the fund.

106
00:11:06.856 --> 00:11:07.390
<v Donnie Oliveira>Next slide, please.

107
00:11:08.475 --> 00:11:14.188
<v Donnie Oliveira>And this just shows the, once again, uh, mighty team of 3 at the Spectator Venues Program.

108
00:11:15.320 --> 00:11:16.438
<v Donnie Oliveira>All right, next slide, please.

109
00:11:18.177 --> 00:11:28.624
<v Donnie Oliveira>Within the Spectator Venues Fund and Activities Program, staff will continue providing oversight and planning for the future of the city's venues, including Providence Park, BOTA Center, and the Veterans Memorial Coliseum.

110
00:11:29.610 --> 00:11:38.899
<v Donnie Oliveira>The team manages the Spectator Venues Fund to collect revenues from event activities and meet all city financial obligations, including debt service and repair and replacement expenditures.

111
00:11:39.716 --> 00:11:44.253
<v Donnie Oliveira>The last phase of the VMC renovation project will be completed this fall, which we're very excited about.

112
00:11:44.381 --> 00:11:49.591
<v Donnie Oliveira>And if you haven't had a chance to see the, the recently remodeled and renovated building, it's spectacular.

113
00:11:49.735 --> 00:11:50.393
<v Donnie Oliveira>Highly encourage it.

114
00:11:51.836 --> 00:12:02.432
<v Donnie Oliveira>The team is working with the Portland Timbers about sustaining investments in the stadium, which turns 100 years old this year, and in ways to support their efforts to bring more summer concerts to the venue.

115
00:12:03.297 --> 00:12:06.038
<v Donnie Oliveira>The goal is to continue to support Providence Park.

116
00:12:06.264 --> 00:12:13.885
<v Donnie Oliveira>It's, uh, it's in excellent condition, uh, today, but we know that we need more investments to continue to make it viable through the length of that lease agreement.

117
00:12:14.609 --> 00:12:32.100
<v Donnie Oliveira>We also want to acknowledge that as a, as a stadium that is largely dependent on people getting there by transit, uh, continuing to support activation around the park is, is highly important to the sustained success of both the Timbers and Thorns and of course any concerts that may be hosted there.

118
00:12:32.585 --> 00:12:38.734
<v Donnie Oliveira>And last, of course, and not least, this team is leading the work to negotiate a new lease with the Portland Trail Blazers at the Moda Center.

119
00:12:40.586 --> 00:12:45.553
<v Donnie Oliveira>And that— with that, I'm going to turn it over to Director Montez to talk about the Office of Arts and Culture.

120
00:12:46.250 --> 00:12:46.506
<v Cherity Montez>Thank you.

121
00:12:47.634 --> 00:12:48.423
<v Cherity Montez>Good morning, councilors.

122
00:12:48.537 --> 00:12:52.144
<v Cherity Montez>For the record, my name is Cherity Montez, and I'm the director of the Office of Arts and Culture.

123
00:12:53.029 --> 00:12:59.644
<v Cherity Montez>The Office of Arts and Culture is another small but mighty team of 5 with a vision of arts and culture at the center of public life in Portland.

124
00:13:00.211 --> 00:13:01.942
<v Cherity Montez>We support this vision in several ways.

125
00:13:02.760 --> 00:13:06.399
<v Cherity Montez>First, we tend to the impact of the arts tax, which you heard all about yesterday.

126
00:13:07.009 --> 00:13:12.923
<v Cherity Montez>We support arts education coordination and help expand access to arts learning for students across Portland's public schools.

127
00:13:13.902 --> 00:13:24.385
<v Cherity Montez>We provide grants and sponsorships to Portland-based arts organizations, individual artists, and community partners who create public programming, performances, exhibitions, and cultural experiences across the city.

128
00:13:25.539 --> 00:13:37.491
<v Cherity Montez>We also steward some of the city's key cultural assets, including the city-owned Portland Five Centers for the Arts, the city's public art collection of more than 1,700 works, and the Portland, Oregon side trademark and licensing program.

129
00:13:38.534 --> 00:13:49.614
<v Cherity Montez>Together, these programs support Portland's creative economy, expand access to the arts, and help ensure that arts and culture remain visible and accessible in neighborhoods, schools, public spaces, and our civic life.

130
00:13:50.883 --> 00:13:56.807
<v Cherity Montez>The proposed budget totals approximately $10.6 million to support this body of work, which I will detail in the next slide, please.

131
00:13:58.907 --> 00:14:02.375
<v Cherity Montez>So this slide provides a high-level overview of Arts and Culture's budget.

132
00:14:02.860 --> 00:14:15.837
<v Cherity Montez>The top line shows the current service level totaling approximately $11.2 million, and the bottom line shows the proposed budget of approximately $10.6 million, which reflects reductions and realignments that I will walk through in the next few slides.

133
00:14:16.562 --> 00:14:17.176
<v Cherity Montez>Next slide, please.

134
00:14:20.067 --> 00:14:23.546
<v Cherity Montez>This slide shows the Office of Arts and Culture's FTE summary.

135
00:14:24.187 --> 00:14:41.413
<v Cherity Montez>The proposed budget does reflect a change to one vacant coordinator position that was moved through the city's realignment project, but the office remains a 5-person team responsible for arts education coordination, cultural planning, grantmaking, public art stewardship, Portland Five oversight, and the Portland, Oregon Sign Licensing Program.

136
00:14:41.717 --> 00:14:47.078
<v Cherity Montez>And we work really closely with the office, the Grants Management Division, on all of our grantmaking.

137
00:14:47.811 --> 00:14:48.429
<v Cherity Montez>Next slide, please.

138
00:14:51.513 --> 00:14:58.042
<v Cherity Montez>So this budget preserves several core services that are central to the Office of Arts and Culture's mission and important to Portlanders.

139
00:14:58.860 --> 00:15:05.325
<v Cherity Montez>First, the office is preserving unrestricted grants for established nonprofit arts organizations through our Operating Support Program.

140
00:15:06.174 --> 00:15:16.280
<v Cherity Montez>Operating support grantees demonstrate artistic excellence, provide public programming, serve K-12 students in underserved communities, support creative workers, and contribute to neighborhood vitality.

141
00:15:16.682 --> 00:15:26.636
<v Cherity Montez>Maintaining this grant program helps provide stability for arts organizations that Portlanders rely on for performances, exhibitions, arts education, and cultural programming throughout the year.

142
00:15:28.097 --> 00:15:41.778
<v Cherity Montez>Second, although there is a reduction in the number of awards, the office is preserving our small grants program that serves individual artists, emerging arts organizations and arts collectives, culturally specific programming, and community-based arts activity.

143
00:15:42.373 --> 00:15:49.325
<v Cherity Montez>The small grants program is key because it provides critical resources for individual artists, and that's not something that all cities provide.

144
00:15:50.080 --> 00:15:59.279
<v Cherity Montez>It also creates an entry point for artists and groups that may not have the scale, staffing, or operating history to participate in larger institutional funding programs.

145
00:16:00.275 --> 00:16:07.485
<v Cherity Montez>It helps support public-facing arts experiences that are often neighborhood-based, culturally specific, and directly connected to community.

146
00:16:09.010 --> 00:16:12.912
<v Cherity Montez>Third, this budget maintains general fund resources for our public art program.

147
00:16:13.682 --> 00:16:17.729
<v Cherity Montez>This funding helps preserve our ability to steward public art as a core public service.

148
00:16:18.500 --> 00:16:44.355
<v Cherity Montez>That includes maintaining the city's public art collection, which includes works like the recently reinstalled elk statue, as well as supporting public art planning and capital improvement projects as required by our Percent for Art code, advancing community-informed projects, and ensuring that public artworks remain accessible, Public art is especially important because it reaches Portlanders outside of traditional arts venues.

149
00:16:45.370 --> 00:16:51.179
<v Cherity Montez>It shows up in our parks, in civic buildings, in our streets and rights of way, in libraries, neighborhood gathering places.

150
00:16:51.374 --> 00:16:55.032
<v Cherity Montez>It's one of the most visible ways that a city can invest in arts access for the public.

151
00:16:55.840 --> 00:16:56.466
<v Cherity Montez>Next slide, please.

152
00:16:59.509 --> 00:17:09.131
<v Cherity Montez>So first decision package in the fiscal year '25-'26, budget process, bureaus were directed to take an 8% reduction to ongoing general fund resources.

153
00:17:10.044 --> 00:17:17.818
<v Cherity Montez>The Office of Arts and Culture inadvertently received a double cut during the transition from the Vibrant Community Service area to Community and Economic Development.

154
00:17:18.780 --> 00:17:26.796
<v Cherity Montez>The proposed budget restores $357,184, which represents the portion of the reduction that was applied twice.

155
00:17:27.741 --> 00:17:35.740
<v Cherity Montez>And this restoration supports grants, public activations, and the office's ability to provide direct community-facing arts and culture services.

156
00:17:36.585 --> 00:17:37.282
<v Cherity Montez>Next slide, please.

157
00:17:40.306 --> 00:17:52.926
<v Cherity Montez>And then our second decision package for fiscal year '26-'27, the proposed budget includes a $373,384 reduction in general fund resources.

158
00:17:54.493 --> 00:17:57.836
<v Cherity Montez>As I mentioned earlier, the office is preserving our small grants program.

159
00:17:58.112 --> 00:18:08.038
<v Cherity Montez>However, this reduction will reduce the number of small grants and events sponsored this includes a reduction of approximately 15% to the small grants program.

160
00:18:08.631 --> 00:18:19.574
<v Cherity Montez>We estimate this reduction will result in approximately 45 to 55 fewer publicly accessible performances, exhibitions, or other works of art available to the community via grantees.

161
00:18:20.711 --> 00:18:30.308
<v Cherity Montez>And this budget will also result in approximately 5 to 10 fewer community event sponsorships or activations, which is about a reduction of about 35% compared to previous years.

162
00:18:30.356 --> 00:18:30.565
<v Cherity Montez>Councilor Herbold.

163
00:18:32.250 --> 00:18:44.068
<v Cherity Montez>Overall, this reduction means fewer opportunities for Portlanders to experience arts and culture in their neighborhoods, fewer opportunities for artists and small arts organizations to receive support, and fewer cultural activities that contribute to Portland's creative economy.

164
00:18:44.935 --> 00:19:03.965
<v Cherity Montez>At the same time, the proposed budget preserves the Office of Arts and Culture's core functions: arts education coordination, cultural planning, grantmaking to individual artists and arts organizations, sponsorships, and stewardship of the city's cultural infrastructure, including our public art collection, our performing arts venues, and our iconic Portland, Oregon sign.

165
00:19:04.847 --> 00:19:05.905
<v Cherity Montez>Thank you for your time this morning.

166
00:19:06.115 --> 00:19:08.983
<v Cherity Montez>That concludes my remarks, and I think I turn it over to Director Wesley.

167
00:19:10.459 --> 00:19:10.907
<v Cornell Wesley>Good morning.

168
00:19:11.340 --> 00:19:12.398
<v Cornell Wesley>My name is Cornell Wesley.

169
00:19:12.623 --> 00:19:15.636
<v Cornell Wesley>I serve as the executive director for Prosper Portland.

170
00:19:17.096 --> 00:19:27.587
<v Cornell Wesley>As presented on April 21st, Prosper Portland's fiscal year '26-'27 proposed budget includes $202 million in planned expenditures across all funding sources.

171
00:19:28.584 --> 00:19:43.420
<v Cornell Wesley>The budget incorporates the mayor's proposed general fund of $13.1 million in ongoing and one-time funding and $3.2 million in recreational cannabis tax supporting the Inclusive Business Resources Network and Reimagine grant program.

172
00:19:44.239 --> 00:19:47.659
<v Cornell Wesley>Total staffing is proposed at 94 positions.

173
00:19:48.432 --> 00:19:50.480
<v Cornell Wesley>Next slide.

174
00:19:52.045 --> 00:19:56.722
<v Cornell Wesley>Prosper Portland current service level for general fund is $13.4 million.

175
00:19:57.046 --> 00:20:04.553
<v Cornell Wesley>However, this included $2 million in one-time funding that replaced ongoing funds last fiscal year.

176
00:20:06.160 --> 00:20:15.517
<v Cornell Wesley>The mayor's budget includes an additional $1 million in one-time funding for the Storefront Program and net reductions of $1.9 million in one-time funding.

177
00:20:15.825 --> 00:20:20.365
<v Cornell Wesley>And ongoing funds from current service level that we'll discuss in the next slides.

178
00:20:22.001 --> 00:20:23.416
<v Cornell Wesley>Next slide.

179
00:20:24.895 --> 00:20:28.690
<v Cornell Wesley>Total FTE in the current year is 104 positions.

180
00:20:29.397 --> 00:20:48.518
<v Cornell Wesley>Expiration of one-time general funds, ongoing spend-down of existing TIF districts, slower deployment of SIF, and delays on new TIF factored into our recent reduction in force that is reducing total positions by 10 for fiscal year '26-'27.

181
00:20:49.755 --> 00:20:59.902
<v Cornell Wesley>This includes 13 existing positions across the agency, 9 filled, 4 vacant, and adding back several new positions to reconfigure the work.

182
00:21:00.656 --> 00:21:17.142
<v Cornell Wesley>The 3 new positions are in HR and IT, replacing several other positions in those areas, and 1 new position, resource development, to support new grant and revenue-generating approaches to improve long-term financial sustainability for the enterprise.

183
00:21:18.448 --> 00:21:21.125
<v Cornell Wesley>Next slide.

184
00:21:21.692 --> 00:21:30.230
<v Cornell Wesley>Of the 94 positions funded in next year's proposed budget, 33 are funded via general fund and RCT.

185
00:21:30.989 --> 00:21:46.887
<v Cornell Wesley>This includes the Office of Small Business, the Business Advancement Team, Office of Events and Film, Inclusive Business Resource Network, Reimagine grants, as well as lending and small business tenanting support and related back office staff.

186
00:21:47.498 --> 00:21:53.294
<v Cornell Wesley>Also, 40 positions are funded by TIF districts, including Residential District Program income.

187
00:21:54.017 --> 00:21:56.665
<v Cornell Wesley>10 positions are funded via PSF agreements.

188
00:21:57.243 --> 00:22:00.728
<v Cornell Wesley>7 positions are funded by SIF investment earnings.

189
00:22:01.241 --> 00:22:08.451
<v Cornell Wesley>3 Positions are funded— 3 positions are funded by other funds such as E-Zone or other contracts.

190
00:22:09.076 --> 00:22:19.188
<v Cornell Wesley>Overall, of the 94 positions, approximately 63 are budgeted as direct program delivery and 31 as administration and indirect.

191
00:22:19.828 --> 00:22:31.711
<v Cornell Wesley>Administration and indirect includes HR, finance, policy, IT, procurement, and a significant portion of comms, legal, exec, and overall department management.

192
00:22:34.529 --> 00:22:35.256
<v Cornell Wesley>Next slide.

193
00:22:39.305 --> 00:22:53.548
<v Cornell Wesley>The general fund reductions focused on maintaining the following: the Office of Small Business, a new office that has successfully addressed community needs for centralized intake, navigation, and resource support.

194
00:22:54.297 --> 00:23:02.208
<v Cornell Wesley>With strong momentum and scaling, this small team of 4 has worked with nearly 700 companies in their first year.

195
00:23:03.315 --> 00:23:13.680
<v Cornell Wesley>Secondly, the Office of Events and Film, critical to leveraging private investment in foot traffic and economic impact around cultural events and film production.

196
00:23:14.450 --> 00:23:25.880
<v Cornell Wesley>In 2025, provided support for 43 events, which drove more than 782,000 visits and leveraged more than $9 million in industry investment.

197
00:23:26.651 --> 00:23:38.027
<v Cornell Wesley>In fiscal year '24-'25, Film Navigation provided support for 107 productions and generated $191 million in local spend.

198
00:23:39.409 --> 00:23:53.843
<v Cornell Wesley>As compared to arts and culture event support, the Office of Film Events and Film provides both technical assistance via grants and technical assistance via permitting navigation to event and film producers.

199
00:23:54.660 --> 00:24:03.785
<v Cornell Wesley>We prioritize activations in the Central City and neighborhood business districts that stimulate small business spending and other economic activity.

200
00:24:04.459 --> 00:24:08.868
<v Cornell Wesley>The office leverages corporate and other private sector engagement.

201
00:24:10.008 --> 00:24:26.856
<v Cornell Wesley>Technical assistance on the event side can also include facets of event support from initial event planning and site logistics, coordination with city partners, event promotion and marketing, and impact tracking post-production.

202
00:24:28.849 --> 00:24:31.682
<v Cornell Wesley>Thirdly, the Business Advancement Team.

203
00:24:32.810 --> 00:24:42.176
<v Cornell Wesley>Continuing to build industry ecosystems is essential to population growth and quality job creation.

204
00:24:43.155 --> 00:24:50.605
<v Cornell Wesley>Our priority industries are major employers and contributors to the city's GDP and to our tax base.

205
00:24:51.505 --> 00:25:11.048
<v Cornell Wesley>Over the last 2 years, the Business Advancement team has supported our targeted industry clusters to achieve 52 retention, expansion, or recruitment projects, over 600 new living-wage jobs for Portlanders, and $240 million in new private investment into our city.

206
00:25:12.359 --> 00:25:12.700
<v Cornell Wesley>Next slide.

207
00:25:15.532 --> 00:25:25.512
<v Cornell Wesley>$1 Million added as one-time funding in the mayor's proposed budget will support implementation of the Storefront Prosperity Investment Program grants citywide.

208
00:25:26.529 --> 00:25:39.980
<v Cornell Wesley>The funds implemented across Portland will complement Prosper's existing TIF district programming for PIP grant in TIF districts and through the use of some allocated program income in the new TIF districts.

209
00:25:40.931 --> 00:25:44.705
<v Cornell Wesley>The funds provide matching funds for tenant improvements, including downtown.

210
00:25:45.546 --> 00:25:53.904
<v Cornell Wesley>Grant funds can support both facade improvements, including signage, and interiors such as paint, flooring, and shelving.

211
00:25:56.596 --> 00:26:00.076
<v Cornell Wesley>$800,000 Of this funding will go to these tenant improvements.

212
00:26:00.643 --> 00:26:10.015
<v Cornell Wesley>And would provide up to $100,000 for grocery stores, $50,000 for new restaurants, and up to $25,000 for other retail businesses.

213
00:26:10.999 --> 00:26:16.019
<v Cornell Wesley>$200,000 Of this funding will be reserved for ongoing repair grants.

214
00:26:16.664 --> 00:26:26.909
<v Cornell Wesley>Grant funds can be used for both external and internal repairs, such as window and door replacement, as well as security prevention and insurance premium increases.

215
00:26:28.201 --> 00:26:39.684
<v Cornell Wesley>This strategy captures the vision of activation and the ongoing commitment to reactivating our commercial spaces across Portland and supporting our small business community.

216
00:26:40.655 --> 00:26:43.308
<v Cornell Wesley>Some staffing impacts expected.

217
00:26:44.020 --> 00:26:51.517
<v Cornell Wesley>The Workforce Program Delivery Add-Back will provide some resource support to support implementation.

218
00:26:52.803 --> 00:26:54.184
<v Cornell Wesley>Next slide.

219
00:26:57.045 --> 00:27:10.457
<v Cornell Wesley>With the expiration of $2 million in one-time funds, the mayor is requesting an add-back of $1.03 million in ongoing funds to support the adult and youth workforce development programs.

220
00:27:11.402 --> 00:27:25.375
<v Cornell Wesley>The remaining $1.08 million of expiring funds is part of the recent reduction in force that is reducing 10% of Prosper's workforce supporting economic and urban development activities.

221
00:27:27.382 --> 00:27:28.692
<v Cornell Wesley>Next slide.

222
00:27:31.569 --> 00:27:41.578
<v Cornell Wesley>Reductions to existing ongoing funding include impacts to workforce development and small business technical assistance for $798,000.

223
00:27:41.757 --> 00:27:48.356
<v Cornell Wesley>A $260,000 reduction is with workforce A $532,000 reduction is with IBRN.

224
00:27:49.353 --> 00:28:09.888
<v Cornell Wesley>However, when combined with other expiring one-time funding from '25-'26, the net impact to workforce programming will be closer to $445,000, eliminating service to an entire program or reducing service in all 3 programs.

225
00:28:10.773 --> 00:28:30.641
<v Cornell Wesley>Currently, the total number of participants served by each program are 600 adult Economic Opportunity Program participants, 500 youth participants through NextGen, 250 adult workforce participants through the Community Workforce Navigator.

226
00:28:32.508 --> 00:28:43.549
<v Cornell Wesley>Now, since the release of the mayor's proposed budget, we are working with our partners at Work Systems about how to minimize the programmatic impacts of a budget cut of this size.

227
00:28:44.981 --> 00:28:46.211
<v Cornell Wesley>Next slide.

228
00:28:47.973 --> 00:29:02.589
<v Cornell Wesley>The $532,000 reduction to IBRN would eliminate 2 to 3 partners from the network, reducing community-based capacity for business advising and technical assistance, and likely affecting partner staff.

229
00:29:03.576 --> 00:29:20.375
<v Cornell Wesley>The reduced capacity from fewer contracted partners would eliminate technical assistance and business advising access for 175 small business owners from the 600 total currently served each year across the network.

230
00:29:22.215 --> 00:29:24.433
<v Cornell Wesley>I will now pass to Director McElroy.

231
00:29:25.189 --> 00:29:26.105
<v Meg McElroy>Thank you, Director Wesley.

232
00:29:26.555 --> 00:29:28.017
<v Meg McElroy>For the record, my name is Meg McElroy.

233
00:29:28.162 --> 00:29:29.993
<v Meg McElroy>I'm the interim director at the Children's Levy.

234
00:29:30.171 --> 00:29:31.199
<v Meg McElroy>I use she/her pronouns.

235
00:29:31.701 --> 00:29:43.458
<v Meg McElroy>And I want to take a moment of gratitude before I get started with my formal comments to say thank you to the councilors and city staff who extended yesterday's City Council meeting to hear testimony on Ordinance 2026-132.

236
00:29:43.891 --> 00:29:44.211
<v Meg McElroy>Thank you.

237
00:29:45.557 --> 00:29:49.118
<v Meg McElroy>The Portland Children's Levy works to increase opportunity for Portland's children.

238
00:29:49.423 --> 00:29:57.410
<v Meg McElroy>Its goals are to prepare children for school, to support their success in and out of school, and to eliminate racial and ethnic disparities in their success and well-being.

239
00:29:58.324 --> 00:30:18.817
<v Meg McElroy>As required by the authorizing legislation approved by Portland voters, The Children's Levy grants funds to specific program services for children prenatal up to age 24 and their families in 6 areas of focus: afterschool, child abuse prevention intervention, early childhood, foster care, hunger relief, and mentoring.

240
00:30:19.667 --> 00:30:25.634
<v Meg McElroy>For context, in fiscal year '24-'25, the Children's Levy grant-funded services reached over 20,000 children and their families.

241
00:30:26.531 --> 00:30:37.542
<v Meg McElroy>The Children's Levy fiscal year '26-'27 budget includes 6.9 FTE to implement the functions of the levy which are grantmaking, grants management, community engagement, and administration of the levy.

242
00:30:38.060 --> 00:30:41.998
<v Meg McElroy>The total proposed budget for fiscal year '26-'27 is $33.8 million.

243
00:30:42.538 --> 00:30:43.261
<v Meg McElroy>Next slide, please.

244
00:30:45.650 --> 00:31:02.550
<v Meg McElroy>The Children's Levy fiscal year '26-'27 budget of $33.8 million includes all costs associated with current multi-year grant obligations and contingency for pending allocation committee grant decisions that are being considered by City Council through Ordinance 2026-132.

245
00:31:03.450 --> 00:31:11.825
<v Meg McElroy>It includes costs for grants management and community engagement, and the budget also includes administration such as levy financial management, oversight, and staff supervision.

246
00:31:12.980 --> 00:31:16.140
<v Meg McElroy>The Children's Levy does not receive any funding from the general fund.

247
00:31:17.151 --> 00:31:29.428
<v Meg McElroy>All resources and grants— excuse me, all resources for grants and administration are under the Children's Investment Fund, which was established in 2003 to account for all revenues and expenditures related to the Children's Levy.

248
00:31:30.330 --> 00:31:37.285
<v Meg McElroy>Revenue from the levy is legally required to be spent on grants that support children and families and cannot be used for other purposes.

249
00:31:38.041 --> 00:31:38.683
<v Meg McElroy>Next slide, please.

250
00:31:40.757 --> 00:31:43.894
<v Meg McElroy>All FTE who support the Children's Levy are funded by the levy.

251
00:31:44.493 --> 00:31:50.088
<v Meg McElroy>As shown in the table, under the core services realignment, the change in current service level is 1 FTE.

252
00:31:50.733 --> 00:31:55.761
<v Meg McElroy>The levy communications director FTE is now part of the city communications office in the city operations service area.

253
00:31:55.842 --> 00:31:55.954
<v Meg McElroy>Thank you.

254
00:31:57.316 --> 00:31:59.824
<v Meg McElroy>And the position remains embedded in the Children's Levy Bureau.

255
00:32:00.712 --> 00:32:06.666
<v Meg McElroy>While that position is no longer budgeted in levy personnel, the costs associated are part of the levy budget contingency.

256
00:32:07.267 --> 00:32:13.146
<v Meg McElroy>As we understand it, a cost model is being developed for bureaus to contribute towards centralized realigned services.

257
00:32:16.460 --> 00:32:17.130
<v Meg McElroy>Next slide, please.

258
00:32:18.932 --> 00:32:26.196
<v Meg McElroy>As required by the levy authorizing legislation, the Allocation Committee is presenting grant recent grant decisions to City Council for consideration.

259
00:32:26.950 --> 00:32:34.753
<v Meg McElroy>Budget decisions by the Levies Allocation Committee continue to support community priorities for children's programming in the Levy 6 program areas that I mentioned earlier.

260
00:32:35.459 --> 00:32:39.913
<v Meg McElroy>The levy does not have any decision packages for City Council as part of this budget process.

261
00:32:40.826 --> 00:32:51.224
<v Meg McElroy>Children's Levy fiscal year 26-27 budget, as I said, includes contingency for pending Allocation Committee grant decisions being considered by Council through Ordinance 2026-132.

262
00:32:51.272 --> 00:32:51.384
<v Meg McElroy>Thank you.

263
00:32:51.806 --> 00:32:54.044
<v Meg McElroy>And again, the Children's Levy does not receive general fund.

264
00:32:54.157 --> 00:32:57.011
<v Meg McElroy>All resources used by the levy are from the Children's Investment Fund.

265
00:32:57.093 --> 00:32:58.845
<v Meg McElroy>I'll now pass it over to Director Engstrom.

266
00:33:00.789 --> 00:33:01.079
<v Eric Engstrom>Thank you.

267
00:33:01.630 --> 00:33:02.291
<v Eric Engstrom>Excuse me.

268
00:33:02.452 --> 00:33:02.890
<v Eric Engstrom>Good morning.

269
00:33:03.067 --> 00:33:04.796
<v Eric Engstrom>Again, for the record, my name is Eric Engstrom.

270
00:33:04.844 --> 00:33:07.009
<v Eric Engstrom>I'm the Director of the Bureau of Planning and Sustainability.

271
00:33:08.201 --> 00:33:16.518
<v Eric Engstrom>And as you all know, we talked about the rest of BPS yesterday, so I'm going to skip over some of the overview about what the Bureau does and dive right into PSEF.

272
00:33:18.438 --> 00:33:21.675
<v Eric Engstrom>As I do that, I want to say one thing up front about terminology.

273
00:33:21.740 --> 00:33:31.951
<v Eric Engstrom>You're going to see me refer to the PCEF core administrative team a few times in the presentation, and what I mean by that is that that's the core team within BPS that's managing the overall program.

274
00:33:32.384 --> 00:33:35.830
<v Eric Engstrom>That does not include folks in other bureaus that are doing PCEF work.

275
00:33:35.942 --> 00:33:49.119
<v Eric Engstrom>It doesn't include PCEF-funded positions or work in the CSO's office or other BPS PCEF-funded activities like our bureau administration or our climate team, which receives yes.

276
00:33:50.371 --> 00:33:52.487
<v Eric Engstrom>So I want to just get that clear about terminology.

277
00:33:52.599 --> 00:34:01.547
<v Eric Engstrom>And then also want to acknowledge that depending on how you query the system, you may get slightly different answers in terms of how many FTE or the overall PCF budget.

278
00:34:02.701 --> 00:34:09.420
<v Eric Engstrom>And the difference, the range there is because if you query just the PCF program, you'll get one answer.

279
00:34:09.500 --> 00:34:13.284
<v Eric Engstrom>But if you query the PCF-funded activities, you'll get another answer.

280
00:34:13.364 --> 00:34:26.085
<v Eric Engstrom>And so when you look at the FTE numbers, you're going to see here it In BPS, the PCF numbers range from 47 to 55 FTE, and that's because depending on whether you're looking at that core team only or the PCF-funded positions.

281
00:34:26.197 --> 00:34:34.958
<v Eric Engstrom>And then similarly with the overall budget, you're going to see numbers in various places that range from $695 million to $712 million.

282
00:34:35.376 --> 00:34:42.168
<v Eric Engstrom>Same explanation, it depends if you're looking at the core PCF program or if you're including all PCF-funded activities.

283
00:34:42.677 --> 00:34:44.954
<v Eric Engstrom>So I just wanted to start with that because it's— it can be confusing.

284
00:34:45.788 --> 00:34:46.496
<v Eric Engstrom>Next slide, please.

285
00:34:48.057 --> 00:34:54.653
<v Eric Engstrom>As I said yesterday, PCEFF accounts for about 90% of BPS's budget, around $700 million.

286
00:34:58.427 --> 00:34:58.556
<v Eric Engstrom>That—.

287
00:34:58.605 --> 00:35:06.958
<v Eric Engstrom>I also want to make it clear that that number includes the roughly $425 million fund balance, which is the set-aside for future years.

288
00:35:07.007 --> 00:35:09.309
<v Eric Engstrom>It's the ending fund balance, the unallocated balance.

289
00:35:09.391 --> 00:35:11.923
<v Eric Engstrom>It's what's set aside for future years of the CIP.

290
00:35:12.590 --> 00:35:13.880
<v Eric Engstrom>That we have in hand.

291
00:35:15.679 --> 00:35:19.682
<v Eric Engstrom>So the actual budget for the year, you have to subtract that.

292
00:35:21.159 --> 00:35:24.219
<v Eric Engstrom>And again, this is the overall BPS budget, what you're seeing here.

293
00:35:25.840 --> 00:35:26.309
<v Eric Engstrom>Next slide.

294
00:35:29.025 --> 00:35:40.574
<v Eric Engstrom>So diving into specifics of PSEF, this, given the broad collection and long-term commitments of the Climate Investment Plan, this is a complex budget.

295
00:35:40.686 --> 00:35:53.798
<v Eric Engstrom>The budget shown here includes current and the future years as I mentioned, it subtracts out also some direct payments we make through the Water Bureau and Bureau of Environmental Services.

296
00:35:54.500 --> 00:36:04.036
<v Eric Engstrom>Those transfers function slightly differently than some of the other bureaus that receive PSEF money that receive the money directly into their budget because of the ratepayer nature there.

297
00:36:04.358 --> 00:36:09.313
<v Eric Engstrom>So those are in BPS's budget, but I'm not— I've excluded them from this slide.

298
00:36:09.378 --> 00:36:09.556
<v Eric Engstrom>Thank you.

299
00:36:11.706 --> 00:36:18.027
<v Eric Engstrom>So again, it's around $695 million inclusive of the $425 million of future year work.

300
00:36:18.239 --> 00:36:18.722
<v Eric Engstrom>Next slide.

301
00:36:25.036 --> 00:36:31.077
<v Eric Engstrom>So this shows all of BPS and the PCF-specific funded staff.

302
00:36:31.286 --> 00:36:34.628
<v Eric Engstrom>Again, that's all the staff in BPS that are PCF-funded.

303
00:36:34.726 --> 00:36:39.309
<v Eric Engstrom>It includes some of the folks that are in our bureau administration, and that's largely the realignment you're seeing there.

304
00:36:39.358 --> 00:36:39.793
<v Eric Engstrom>The reduction in staff.

305
00:36:41.880 --> 00:36:53.179
<v Eric Engstrom>The reduction is that there was one communications staffer in our PCEV program that was realigned and cut in the communications realignment that occurred earlier this year.

306
00:36:55.876 --> 00:37:00.465
<v Eric Engstrom>So the rest of the realignment PCEV is shown there, the 6.

307
00:37:02.012 --> 00:37:07.420
<v Eric Engstrom>This includes staff from HR, tech services, communications, finance, and our director's office.

308
00:37:07.664 --> 00:37:09.623
<v Eric Engstrom>That was the subject, obviously, of the realignment work.

309
00:37:09.688 --> 00:37:09.786
<v Eric Engstrom>Thank you.

310
00:37:11.266 --> 00:37:26.646
<v Eric Engstrom>The additions— the proposed budget includes a package to add 4 FTE to the PCF administrative team, the core administrative team, and then there's 1 FTE in that decision package additionally that is for bureau administration.

311
00:37:32.402 --> 00:37:42.472
<v Eric Engstrom>And again, the people that are being realigned will be embedded and still within the overall service area internal services team that Donnie spoke of earlier.

312
00:37:42.519 --> 00:37:48.409
<v Eric Engstrom>So they'll still be serving the, the CEDSA team overall, including some that are dedicated to PCEF.

313
00:37:50.581 --> 00:37:51.213
<v Eric Engstrom>Next slide.

314
00:37:53.820 --> 00:37:59.099
<v Eric Engstrom>So this dives more into BPS's operating budget for PCEF.

315
00:38:00.617 --> 00:38:06.460
<v Eric Engstrom>Again, if you exclude the $425 million that's set aside.

316
00:38:06.541 --> 00:38:10.657
<v Eric Engstrom>I left that off this chart so you can see more accurately what's actually being spent this year.

317
00:38:12.670 --> 00:38:18.728
<v Eric Engstrom>This does show the $26 million going to the general fund from interest in the green.

318
00:38:19.909 --> 00:38:26.635
<v Eric Engstrom>This will require, by the way, code action, a code change, as you did last year in order for it to be implemented.

319
00:38:29.021 --> 00:38:33.146
<v Eric Engstrom>Although the PCF staff team has grown in recent years, it remains fairly small.

320
00:38:34.032 --> 00:38:38.440
<v Eric Engstrom>As a proportion of our overall spending, that's in the dark blue there, the $9.5 million.

321
00:38:39.360 --> 00:38:47.971
<v Eric Engstrom>PSF codes limits us to 12%, I believe, as the administrative overhead, and we're tracking at 8% something right now, so we're well below that.

322
00:38:49.632 --> 00:38:57.706
<v Eric Engstrom>The contracts and IGA portion includes funding for the Collaborating for Climate Action grants, strategic programs, and capacity building support.

323
00:38:58.028 --> 00:38:59.699
<v Eric Engstrom>This is the gold and largest portion.

324
00:39:00.322 --> 00:39:21.047
<v Eric Engstrom>Examples of the kinds of things that are being covered this year under that include the agreements with the school districts, which are now getting underway, our contract for the e-bike program, which has also launched several fairly large contracts that were launched last year for building energy programs, both the single-family retrofits and the affordable multifamily retrofits.

325
00:39:22.472 --> 00:39:40.277
<v Eric Engstrom>The other category there, the $44 million in TAN, includes— that's the miscellaneous column— that includes transfers going to Prosper, which are treated a little bit differently because Prosper is outside so those have to be shown in our external or as an IGA essentially.

326
00:39:40.793 --> 00:39:51.652
<v Eric Engstrom>And then this includes some Bureau of Fleet and Facilities for the Cutter Garage, administrative functions, including the overhead and things like that that they're paying into the city and BPS.

327
00:39:55.487 --> 00:39:56.364
<v Eric Engstrom>Next slide.

328
00:39:59.054 --> 00:40:12.641
<v Eric Engstrom>So again, you all know this, but the Climate Investment Plan is the roadmap that drives of our overall investments over the 5-year period, including allocations to the various bureaus and grant programs, outcomes and goals that advance climate action and resilience across Portland.

329
00:40:13.592 --> 00:40:27.983
<v Eric Engstrom>The funding pathways in the CIP include the Collaborating for Climate Action grants, the strategic programs I've talked about, and then the community grants, and of course the direct funding to the bureaus.

330
00:40:28.887 --> 00:40:32.675
<v Eric Engstrom>The CIP, as you know, is updated annually to be responsive, accountable, and aligned with community needs and program performance.

331
00:40:34.907 --> 00:40:38.853
<v Eric Engstrom>And updates are recommended by the PCEF Committee to City Council.

332
00:40:39.534 --> 00:40:54.760
<v Eric Engstrom>And as you wrap up this budget process, we will be launching the next 2026 CIP amendment process this summer with the goal of sending the next set of recommendations to you at the end of the year, end of the calendar year.

333
00:40:56.077 --> 00:40:56.543
<v Eric Engstrom>Next slide.

334
00:40:58.664 --> 00:41:00.864
<v Eric Engstrom>You've seen this before in some form.

335
00:41:00.913 --> 00:41:04.626
<v Eric Engstrom>This shows the current distribution of the Climate Investment Plan funding across our primary funding areas.

336
00:41:06.661 --> 00:41:07.833
<v Eric Engstrom>As defined by code.

337
00:41:08.492 --> 00:41:12.217
<v Eric Engstrom>These buckets were determined by the community through their input into the CIP.

338
00:41:13.389 --> 00:41:19.797
<v Eric Engstrom>As you've discussed a number of times, they're not necessarily exactly matched to the percentage of our carbon emission sources.

339
00:41:20.617 --> 00:41:23.315
<v Eric Engstrom>And as you know, the CIP was assembled in several stages.

340
00:41:23.362 --> 00:41:30.235
<v Eric Engstrom>So I know a number of you have pointed out that there hasn't been that holistic look of how that all aligns.

341
00:41:30.509 --> 00:41:32.885
<v Eric Engstrom>And the next CIP will give us that better view, I think.

342
00:41:32.949 --> 00:41:33.143
<v Eric Engstrom>Thank you.

343
00:41:34.512 --> 00:41:42.947
<v Eric Engstrom>As you can see, over half the CIP's resources are allocated for renewable energy and energy efficiency, followed by transportation and green infrastructure investments.

344
00:41:44.081 --> 00:41:54.070
<v Eric Engstrom>While this chart reflects where we are today, we know that you have interest in seeing PCF's transportation decarbonization investments better reflected given the scale of emissions in that sector.

345
00:41:55.581 --> 00:42:03.619
<v Eric Engstrom>And as we consider future adjustments in 2027 and 2028, we want to be thoughtful about not only where the additional investment is needed, but where the projects can be realistically delivered.

346
00:42:03.668 --> 00:42:03.844
<v Eric Engstrom>Thank you.

347
00:42:06.184 --> 00:42:09.380
<v Eric Engstrom>Within the current investment period through June 2029.

348
00:42:10.139 --> 00:42:14.706
<v Eric Engstrom>And again, the next CIP will allow us to step back beyond that.

349
00:42:16.269 --> 00:42:25.423
<v Eric Engstrom>We're going to continue to work with Council, the PSF Committee, and Bureau partners to identify opportunities that are climate-aligned, equity-centered, and feasible and responsible to fund.

350
00:42:26.538 --> 00:42:27.039
<v Eric Engstrom>Next slide.

351
00:42:28.717 --> 00:42:34.838
<v Eric Engstrom>This is by the breakdown by the implementer, and as you can see, As you can see, PCF contributes to many services within the city.

352
00:42:36.063 --> 00:42:45.585
<v Eric Engstrom>And I want to take a moment to just thank the community for their vision that allows PCF to contribute to these ongoing core city services where there is clear alignment with the PCF mission.

353
00:42:46.820 --> 00:42:51.211
<v Eric Engstrom>If not for that, that many core programs and functions would go unfunded.

354
00:42:52.780 --> 00:43:03.068
<v Eric Engstrom>To call out a few programs that fit within this, it's where we fund the Housing Bureau to make sure affordable housing developments are energy efficient and more sustainable.

355
00:43:03.900 --> 00:43:08.963
<v Eric Engstrom>It's also where we fund PBOT to make investments in safer cycling and pedestrian infrastructure.

356
00:43:09.413 --> 00:43:17.679
<v Eric Engstrom>It's where we fund urban forestry to do groundbreaking work to taking on the management of the city's street trees to remove that burden from residents.

357
00:43:19.041 --> 00:43:25.146
<v Eric Engstrom>We talked about tree permitting yesterday too, but PCF is also making a large direct investment in actual tree planting and tree care.

358
00:43:25.210 --> 00:43:25.338
<v Eric Engstrom>Thank you.

359
00:43:32.070 --> 00:43:42.750
<v Eric Engstrom>And you can see significant investments in our community grants, externally managing— managed contracts like the e-bike program and the schools, school districts, and TriMet.

360
00:43:44.072 --> 00:43:44.603
<v Eric Engstrom>Next slide.

361
00:43:49.550 --> 00:44:02.737
<v Eric Engstrom>This slide summarizes the decision package I meant— I mentioned earlier to add 4 positions to the PCF administrative core team, and as noted earlier, one overall goes to bureau administration.

362
00:44:03.498 --> 00:44:09.420
<v Eric Engstrom>These positions overall will strengthen PCF's infrastructure as the program continues to grow in scale and complexity.

363
00:44:09.532 --> 00:44:14.630
<v Eric Engstrom>And I want to emphasize that this is planned growth as we scale up to match the scale of the community's investment.

364
00:44:15.146 --> 00:44:17.871
<v Eric Engstrom>Remember, we started with one staff in 2019.

365
00:44:19.824 --> 00:44:24.597
<v Eric Engstrom>As we move into 2027, we are getting closer to our intended long-term sustainability.

366
00:44:24.811 --> 00:44:25.583
<v Eric Engstrom>Thank you.

367
00:44:28.251 --> 00:44:39.916
<v Eric Engstrom>The 2 of these new positions will support our internal operating standards and provide a clearer structure for PCF reporting, and while also serving as leads to start developing the next CIP beginning in 2027.

368
00:44:40.480 --> 00:44:47.277
<v Eric Engstrom>The other 2 positions will expand grants and contracts administration capacity to support timely, consistent, and accountable implementation.

369
00:44:48.815 --> 00:44:49.338
<v Eric Engstrom>Next slide.

370
00:44:49.664 --> 00:44:58.623
<v Eric Engstrom>I want to just take a moment to remind you what the core next slide.

371
00:44:58.768 --> 00:45:03.487
<v Eric Engstrom>So PCEF will continue to grow in the coming year.

372
00:45:04.085 --> 00:45:10.534
<v Eric Engstrom>This is a tremendous amount of work that goes into assuring accountability for that level of outgoing funds.

373
00:45:14.873 --> 00:45:15.402
<v Eric Engstrom>Next slide.

374
00:45:18.070 --> 00:45:21.492
<v Eric Engstrom>So PCEF will continue to grow in the coming year.

375
00:45:21.829 --> 00:45:26.056
<v Eric Engstrom>The slide reflects examples of of PCF-supported projects that will continue.

376
00:45:26.199 --> 00:45:32.670
<v Eric Engstrom>The Community Grant Program, the heart of PCF's work, will continue to award and fund projects led by community-based organizations.

377
00:45:33.264 --> 00:45:43.233
<v Eric Engstrom>The recently launched e-bike program will scale up this year and get more low-income Portlanders navigating our neighborhoods, businesses, and workplaces in ways that are cleaner and more affordable.

378
00:45:43.458 --> 00:45:54.208
<v Eric Engstrom>We'll continue to make efficient home upgrades for vulnerable and low-income Portlanders to scale up our clean energy infrastructure investments across Portland school districts.

379
00:45:54.769 --> 00:45:59.114
<v Eric Engstrom>That work is just now getting underway, which I'm very excited about having school-age kids.

380
00:46:00.525 --> 00:46:16.699
<v Eric Engstrom>Agreements have also been signed for the affordable multifamily program, which will launch this fall, and that's an important element of our overall effort to decarbonize multifamily buildings and provide more comfortable housing and more affordable utility bills for renters.

381
00:46:18.737 --> 00:46:22.228
<v Eric Engstrom>Round 1 of the Clean Industry Hub grants will also launch this fall.

382
00:46:23.164 --> 00:46:29.099
<v Eric Engstrom>And as I noted earlier, PCEV committee will grapple with another annual CIP amendment process starting this summer.

383
00:46:30.074 --> 00:46:31.213
<v Eric Engstrom>That concludes my remarks.

384
00:46:33.099 --> 00:46:34.081
<v Donnie Oliveira>Council President, that's a wrap for us.

385
00:46:34.289 --> 00:46:35.159
<v Donnie Oliveira>So we're open to Q&A.

386
00:46:35.255 --> 00:46:36.510
<v Jamie Dunphy>Fantastic.

387
00:46:37.394 --> 00:46:39.213
<v Jamie Dunphy>Okay, colleagues, let's hop in the queue.

388
00:46:39.438 --> 00:46:42.125
<v Jamie Dunphy>Colleagues, I'm going to ask you all to keep to 5 minutes.

389
00:46:42.699 --> 00:46:44.251
<v Jamie Dunphy>You're welcome to jump back in the queue after that.

390
00:46:45.431 --> 00:46:50.027
<v Mitch Green>Thank you so much, Donnie, and the rest of the team for the update.

391
00:46:50.092 --> 00:46:50.931
<v Mitch Green>I know there's a lot.

392
00:46:50.978 --> 00:46:52.365
<v Mitch Green>You have a very large service area.

393
00:46:54.331 --> 00:46:55.554
<v Mitch Green>I guess I just have one question.

394
00:46:57.469 --> 00:47:09.686
<v Mitch Green>As I'm digging through these position reports in this proposed budget, I just— I'm curious, in the spectators function, is there a reason why that— the leader of that group is a Manager 1?

395
00:47:09.735 --> 00:47:09.784
<v Loretta Smith>Yes.

396
00:47:11.210 --> 00:47:11.690
<v Donnie Oliveira>Great question.

397
00:47:11.755 --> 00:47:12.813
<v Mitch Green>There's 2 direct reports there.

398
00:47:13.101 --> 00:47:14.320
<v Donnie Oliveira>Yeah, great question, Councilor.

399
00:47:14.641 --> 00:47:21.918
<v Donnie Oliveira>It's sort of a product of a team that existed in the old form of government that got separated.

400
00:47:21.998 --> 00:47:22.672
<v Donnie Oliveira>Arts and Culture—.

401
00:47:23.137 --> 00:47:23.266
<v Donnie Oliveira>Sorry—.

402
00:47:23.601 --> 00:47:28.202
<v Donnie Oliveira>And Spectator was once one unit, and it made a little bit more sense, and then we separated those 2.

403
00:47:28.893 --> 00:47:39.592
<v Donnie Oliveira>And it is— you were touching on something that hopefully in the next fiscal year we'll be able to work with the city administrator on, is is addressing some of the smaller units and the appropriate size of what that means.

404
00:47:39.655 --> 00:47:43.557
<v Donnie Oliveira>But that's a function of— I'm just going to use his name because you mentioned it.

405
00:47:43.653 --> 00:47:46.110
<v Donnie Oliveira>It's Carl Lyle, who's the spectator venues manager.

406
00:47:46.559 --> 00:47:52.436
<v Donnie Oliveira>He's been in Manager 1, and we haven't adjusted that with the change of government.

407
00:47:52.516 --> 00:47:53.865
<v Mitch Green>I appreciate that answer.

408
00:47:53.945 --> 00:48:03.342
<v Mitch Green>I mean, obviously it's awkward when you're talking about a specific person, but I do note that, you know, in the City of Portland, there's 198 Mm-hmm.

409
00:48:03.521 --> 00:48:07.829
<v Mitch Green>And in this proposed budget, there's only one reduction at a Manager 1 level.

410
00:48:09.396 --> 00:48:10.552
<v Mitch Green>And that's beyond the scope of you.

411
00:48:10.617 --> 00:48:11.695
<v Mitch Green>This is the citywide thing.

412
00:48:11.742 --> 00:48:17.353
<v Mitch Green>But I'm, you know, talking about it in the context of the choices we've had to make in this budget.

413
00:48:18.152 --> 00:48:20.659
<v Mitch Green>Meanwhile, we did cut 34 public safety specialists.

414
00:48:20.884 --> 00:48:22.829
<v Mitch Green>And so I'm just airing that out.

415
00:48:22.893 --> 00:48:36.331
<v Mitch Green>It was helpful for me to hear from you that this is just sort of a legacy of You know, that sort of a role to me seems like it should fall in an analyst series because it's a, it's a may supervise, not a must supervise.

416
00:48:36.396 --> 00:48:42.277
<v Mitch Green>So I think that was my one question on, on your presentation, and I'll let it go from there.

417
00:48:42.581 --> 00:48:42.936
<v Dan Ryan>Thanks.

418
00:48:43.610 --> 00:48:44.333
<v Jamie Dunphy>Thank you, Councilor Green.

419
00:48:44.719 --> 00:48:45.202
<v Jamie Dunphy>Councilor Smith.

420
00:48:50.057 --> 00:48:50.429
<v Loretta Smith>Good morning.

421
00:48:51.445 --> 00:48:52.155
<v Loretta Smith>Thank you for the presentation.

422
00:48:54.393 --> 00:48:59.297
<v Loretta Smith>I had a question about Summer Works, uh, and NextGen.

423
00:49:00.606 --> 00:49:10.461
<v Loretta Smith>Um, NextGen, you are funding, and I'm wondering, is that a work systems for the apprenticeship programs, or is that something else?

424
00:49:13.693 --> 00:49:17.385
<v Cornell Wesley>So NextGen is, is in partnership with our workforce systems.

425
00:49:17.481 --> 00:49:19.344
<v Cornell Wesley>It's the youth-focused workforce program.

426
00:49:20.750 --> 00:49:28.105
<v Cornell Wesley>Fiscal year '24-'25, 84% of the participants were considered low income and 67% were BIPOC.

427
00:49:28.809 --> 00:49:37.206
<v Cornell Wesley>Of these participants, 193 received employment opportunities and 359 completed their GEDs for high school diplomas.

428
00:49:38.264 --> 00:49:44.931
<v Cornell Wesley>Now, both EOP and NextGen programs use city funding through PROSPER combined with other federal and state resources.

429
00:49:44.994 --> 00:49:45.155
<v Cornell Wesley>Thank you.

430
00:49:48.811 --> 00:50:00.454
<v Loretta Smith>Okay, so I just wanted to go for the record— thank you for that— um, that I'll be proposing an amendment to the mayor's budget for Summer Works, which faced drastic cuts in this budget.

431
00:50:01.291 --> 00:50:12.139
<v Loretta Smith>It reduced its funding from $776,000 to $244,000, and I believe that this vital program not only offers critical work experience for BIPOC youth, Thank you.

432
00:50:12.653 --> 00:50:22.496
<v Loretta Smith>This program not only employs youth and from low-income families and neighborhoods, but also places many of our participants at City Hall and City of Portland bureaus.

433
00:50:23.476 --> 00:50:49.335
<v Loretta Smith>Last year, we passed the resolution to designate programs like Summer Works as a priority in our budget and workforce development initiatives, and I propose funding for this amendment to come from the million dollars in the cannabis revenue allocated within the transportation Department that was in the restricted funds that was moved by the mayor to close the gap of $171 million.

434
00:50:50.126 --> 00:51:00.661
<v Loretta Smith>Allocating these marijuana funds to Summer Works, it will ensure that we continue to support underserved youth and communities effectively.

435
00:51:01.418 --> 00:51:01.869
<v Loretta Smith>Thank you.

436
00:51:03.416 --> 00:51:04.206
<v Jamie Dunphy>Thank you, Councilor Smith.

437
00:51:05.592 --> 00:51:06.074
<v Jamie Dunphy>Councilor Novick.

438
00:51:07.556 --> 00:51:08.440
<v Steve Novick>Thank you, Mr. President.

439
00:51:08.985 --> 00:51:16.853
<v Steve Novick>I've got about 5 questions, and so I'm going to— in order to get them all out in 5 minutes, I'm going to ask each of you to, like, give me the short answer, maybe give me the long answer later.

440
00:51:18.059 --> 00:51:27.485
<v Steve Novick>One is in terms of the tree permitting program that we have, tree strategic programs within PSEF.

441
00:51:27.565 --> 00:51:40.760
<v Steve Novick>So I just want to know if consideration was given to taking some of the money from the current tree program and Yeah, thank you for the question, Councilor.

442
00:51:40.760 --> 00:51:43.980
<v Donnie Oliveira>I'll take a stab first, and Eric, please contribute.

443
00:51:43.980 --> 00:51:51.440
<v Donnie Oliveira>Councilor, when we moved the program from Parks to PP&D, the emphasis was landing on the directive of Council, right?

444
00:51:51.440 --> 00:51:54.219
<v Donnie Oliveira>So we didn't start to contemplate a different funding model.

445
00:51:54.219 --> 00:52:00.090
<v Donnie Oliveira>We took the resources that were directed with the responsibilities, and we said, this is the program we can build.

446
00:52:00.360 --> 00:52:02.641
<v Donnie Oliveira>Now that we know what the gap is, we're going to continue to work with the city staff to Absolutely.

447
00:52:02.704 --> 00:52:15.722
<v Donnie Oliveira>And I think I alluded to this yesterday, but PP&D and Parks staff have started having the conversations about are there resources that Parks can send over in addition to the approximately $3.8 million that is now at PP&D.

448
00:52:16.509 --> 00:52:19.014
<v Donnie Oliveira>And there's the last thing I wasn't able to say yesterday that I wish I would've.

449
00:52:19.398 --> 00:52:28.195
<v Donnie Oliveira>The trade-off, of course, is a substantial part of the urban forestry investment from PCF was to both the planting of new trees and the care of trees.

450
00:52:28.306 --> 00:52:40.871
<v Donnie Oliveira>So it was really emphasis on And while obviously the Title XI support and the permitting is incredibly important, we're talking about trade-offs of planting less trees for more regulation, which is important.

451
00:52:40.967 --> 00:52:45.068
<v Donnie Oliveira>I just want to say that's a conversation that the bureaus are going to have to have to right-size that.

452
00:52:45.277 --> 00:52:46.367
<v Steve Novick>I really appreciate that.

453
00:52:47.615 --> 00:52:58.398
<v Steve Novick>Now, last year we had a CIP amendment come to us that was basically, well, there's some programs that are underspending, so the committee looked at that and decided to shift the money to somewhere else.

454
00:52:58.739 --> 00:53:01.739
<v Steve Novick>And then I came in saying, well, what about other places you could spend it?

455
00:53:01.739 --> 00:53:07.340
<v Steve Novick>And I was told, well, these decisions have already been made, the community groups have been promised the money, et cetera.

456
00:53:07.340 --> 00:53:13.130
<v Steve Novick>Now, it may well be that I should have known to insert myself into that discussion earlier.

457
00:53:13.900 --> 00:53:28.599
<v Steve Novick>So, but I just want to be sure that in this next year, as we lead up to CIP amendments, as you and the PCF staff identify, here are things that— here's potentially available sources of money that the committee, the PCF committee is going to start considering.

458
00:53:28.599 --> 00:53:28.619
<v Steve Novick>Yes.

459
00:53:30.688 --> 00:53:37.420
<v Steve Novick>You let the council know, hey, here's what— here's potential sources of money because of underspending, so you can think about it along with us.

460
00:53:37.934 --> 00:53:44.697
<v Donnie Oliveira>Yeah, Councilor, and on behalf of the City Administrator and CFO Biery, Director Levine from CBO, and our team, absolutely.

461
00:53:44.746 --> 00:53:53.969
<v Donnie Oliveira>As soon as this budget process is over, we're going to jump in earnest to calibrating that underspend so that before we even get into the next EAP, there's situational awareness of what we're working with.

462
00:53:54.483 --> 00:53:59.266
<v Donnie Oliveira>And I also just want to use this moment because it comes up a lot An underspend isn't always a bad thing.

463
00:53:59.523 --> 00:54:01.911
<v Donnie Oliveira>There are scenarios where the underspend was part of the plan.

464
00:54:02.184 --> 00:54:06.882
<v Donnie Oliveira>Just because it hasn't— a dollar hasn't been spent yet doesn't mean that's— that something's wrong, right?

465
00:54:07.076 --> 00:54:07.445
<v Steve Novick>Totally.

466
00:54:07.556 --> 00:54:09.063
<v Donnie Oliveira>I mean, we're gonna capture that too.

467
00:54:09.320 --> 00:54:10.827
<v Steve Novick>Yeah, no, I appreciate that.

468
00:54:10.989 --> 00:54:22.775
<v Steve Novick>Um, finally, I just want to once again express my frustration over the idea— I mean, the idea that there— the idea has been floated of $75 million in PSF dollars, uh, for the Moda Center.

469
00:54:23.577 --> 00:54:32.105
<v Steve Novick>And I asked, well, have— I asked the mayor's office, have you identified which PSAP programs that's going to come out of?

470
00:54:32.634 --> 00:54:34.733
<v Steve Novick>And I was told we're working on that.

471
00:54:35.438 --> 00:54:49.641
<v Steve Novick>And obviously, if there's $75 million that the administration thinks could reasonably be diverted to the Moda Center, then council, I think, should know where you think that money might come from so that we can think maybe there's other ways to spend it.

472
00:54:49.721 --> 00:54:49.849
<v Steve Novick>Thank you.

473
00:54:50.543 --> 00:55:04.311
<v Steve Novick>So the impression I have, and this, this is really on the mayor, frankly, the question of the mayor, is it true that at this point you have no earthly idea where within PSF that $75 million for the Moda Center would come from?

474
00:55:08.389 --> 00:55:11.340
<v Keith Wilson>I'm going to refer that question to my team.

475
00:55:11.405 --> 00:55:22.646
<v Eric Engstrom>Councilor Novick, I think the answer is the same as the last question, which is that we're working I'm working closely with the city administrator and the CFO to examine where our underspending is right now.

476
00:55:22.920 --> 00:55:25.887
<v Steve Novick>Actually, I'm sorry, that really is a question for the mayor.

477
00:55:26.148 --> 00:55:30.641
<v Steve Novick>Is it true that at this point you have absolutely no idea within PSF where that $75 million might come from?

478
00:55:33.831 --> 00:55:47.960
<v Keith Wilson>You know, I work with my team, Councilor Novick, to determine and contemplate areas in which we can find the financing for There are significant amount of improvements that we can do that are emissions reduction focused.

479
00:55:48.039 --> 00:55:50.706
<v Keith Wilson>I'm gonna turn to my team of experts on how we move forward.

480
00:55:50.755 --> 00:56:02.898
<v Keith Wilson>And I've been having conversations with all the councilors on how we can address that using PSEF to determine how we're gonna renovate the MOTA and make it obviously LEED Platinum going forward.

481
00:56:03.043 --> 00:56:06.224
<v Keith Wilson>But PSEF does have a nexus, I believe.

482
00:56:06.336 --> 00:56:20.746
<v Steve Novick>But in the end, these 12 councilors will determine whether that nexus Mayor, I take that as confirming that, frankly, I mean, no disrespect, but all the money has been allocated.

483
00:56:20.972 --> 00:56:23.045
<v Steve Novick>So the $75 million would have to come from somewhere.

484
00:56:23.543 --> 00:56:32.315
<v Steve Novick>So I take your answer as meaning we do not in fact have any— we floated this idea of $75 million, but we have no idea which piece of strategic programs that would come from.

485
00:56:32.925 --> 00:56:36.572
<v Steve Novick>Finally, I've got a question that probably can't be answered right now.

486
00:56:38.472 --> 00:56:42.376
<v Steve Novick>Renewable energy and energy efficiency are grouped together in the CIP.

487
00:56:43.251 --> 00:56:50.335
<v Steve Novick>I think that when the ballot measure was passed, people probably had the idea that most of the money would go to actual renewable energy projects like solar panels and things.

488
00:56:50.853 --> 00:56:58.831
<v Steve Novick>So I'm curious, can you break out how much of the money has been spent on renewable energy as opposed to energy efficiency?

489
00:57:01.690 --> 00:57:05.648
<v Eric Engstrom>Off the top of my head, I can't, but I will get back to you on Okay.

490
00:57:05.793 --> 00:57:08.914
<v Steve Novick>Finally, how many core administrative staff do you have in PSEF now?

491
00:57:10.353 --> 00:57:22.284
<v Eric Engstrom>The core team is around 47, and then when I mentioned the 55 number, that includes some PSEF-funded positions in the BPS administration and our climate team as well.

492
00:57:23.699 --> 00:57:29.418
<v Steve Novick>I just wanted to say that actually sounds to me like a very modest number of people to manage a program of this magnitude.

493
00:57:29.856 --> 00:57:38.032
<v Steve Novick>So the idea that you're adding 4 people to help manage this multi-hundred million dollar program Sounds to me eminently reasonable, and it's quite possible it's not, not enough.

494
00:57:38.114 --> 00:57:38.759
<v Steve Novick>So thank you.

495
00:57:38.807 --> 00:57:47.494
<v Eric Engstrom>I'll just add that that number includes 4 or 5 vacancies right now too, because we're actively trying to hire, which as you can imagine is tricky right now with layoffs happening at the same time.

496
00:57:47.965 --> 00:57:48.306
<v Raymond C. Lee>Thank you.

497
00:57:48.695 --> 00:57:50.074
<v Jamie Dunphy>Thank you, Councilor Novick.

498
00:57:50.317 --> 00:57:52.739
<v Jamie Dunphy>Councilor Morillo.

499
00:57:55.061 --> 00:57:55.400
<v Olivia Clark>Thank you.

500
00:57:55.786 --> 00:58:08.125
<v Angelita Morillo>Um, I just have a few questions here for the Office of the regarding the spectator venues, it looks like 2 positions are transferring out of BPS into the DCA's office.

501
00:58:08.909 --> 00:58:12.793
<v Angelita Morillo>What will their new roles be and what is the impact expected to be on BPS?

502
00:58:15.389 --> 00:58:16.436
<v Donnie Oliveira>Thank you, Councilor.

503
00:58:16.628 --> 00:58:27.711
<v Donnie Oliveira>I'm gonna, um, so one of the positions that are going to be moving over or have already been functioning in the, um, the service area, they're going to be providing service area-wide support.

504
00:58:27.777 --> 00:58:32.422
<v Donnie Oliveira>So one of the staff, for example, is the person who handles all of the council filings.

505
00:58:32.487 --> 00:58:35.923
<v Donnie Oliveira>We're a very active service area at council, as you all know.

506
00:58:36.485 --> 00:58:42.717
<v Donnie Oliveira>So this is the person that collects all the information, working with the bureaus to get it filed, make sure everything's true to form, works with our city auditor's office.

507
00:58:43.327 --> 00:58:44.452
<v Donnie Oliveira>It's a pretty heavy lift for us.

508
00:58:45.077 --> 00:58:51.518
<v Donnie Oliveira>They do all of our service area public records requests and function as like sort of our council coordinator for that perspective.

509
00:58:52.626 --> 00:58:58.177
<v Donnie Oliveira>And I believe the second person Is our finance, our service area finance person.

510
00:58:58.840 --> 00:59:06.561
<v Donnie Oliveira>Given the wide range of funding sources that we have in the service area, we're very dynamic in that way.

511
00:59:06.804 --> 00:59:26.706
<v Donnie Oliveira>And having somebody who can coordinate across the service area, especially when you think about the arts tax and PSEF and all the funds, of course, and the Housing Bureau, just given the nature of the distinct funding type that we have, having a person who's able to coordinate that on behalf and in partnership with the CFO and CBO was pretty essential for our service area.

512
00:59:27.012 --> 00:59:27.126
<v Donnie Oliveira>It's—.

513
00:59:27.563 --> 00:59:30.505
<v Donnie Oliveira>I don't know if it's unique to us, but it was definitely a glaring need.

514
00:59:31.373 --> 00:59:34.525
<v Donnie Oliveira>And then I'll let Eric kind of describe how that's landing for BPS.

515
00:59:34.913 --> 00:59:38.242
<v Eric Engstrom>Yeah, well, those 2 people in particular still serve us essentially.

516
00:59:38.324 --> 00:59:45.822
<v Eric Engstrom>So there's just a change in the context of where they sit, but we're largely still— those functions are still being provided to us.

517
00:59:48.213 --> 00:59:48.954
<v Angelita Morillo>Okay, thank you.

518
00:59:50.532 --> 00:59:59.177
<v Angelita Morillo>We also keep hearing about how the City Budget Office needs more staff, but I see that an Analyst 4 is moving from CBO into the DCA's office.

519
00:59:59.755 --> 01:00:03.322
<v Angelita Morillo>Can you tell us more about why that's happening, what their role is going to be?

520
01:00:04.237 --> 01:00:11.771
<v Donnie Oliveira>Yeah, Councilor, that's the position that functions as the CBO rep in the service area, so it's consistent across all the service areas.

521
01:00:12.447 --> 01:00:16.735
<v Donnie Oliveira>So this person functions as a CBO analyst distinct for the service area.

522
01:00:16.784 --> 01:00:24.293
<v Donnie Oliveira>So our financial analyst works hand in hand with the CBO analyst to both trip the budget with our larger funding structures.

523
01:00:25.063 --> 01:00:29.422
<v Donnie Oliveira>So it's a— they're a team essentially within the service area to support that.

524
01:00:29.518 --> 01:00:32.146
<v Donnie Oliveira>But that person functions as a CBO person.

525
01:00:33.284 --> 01:00:35.958
<v Angelita Morillo>Okay, so we're not gonna lose them as another analyst?

526
01:00:36.264 --> 01:00:36.905
<v Donnie Oliveira>No, not at all.

527
01:00:37.128 --> 01:00:48.184
<v Donnie Oliveira>In fact, it's gonna help with, we hope, and the person has been working with in this capacity already and he's been a great asset to us navigating the budget process and we'll continue to improve that.

528
01:00:48.905 --> 01:00:55.980
<v Donnie Oliveira>But the idea is that it'll allow for CBO to have line of sight and more granularity into the functions of the bureaus.

529
01:00:58.030 --> 01:00:59.018
<v Angelita Morillo>Okay, thank you for that.

530
01:01:00.181 --> 01:01:02.483
<v Angelita Morillo>Um, I have 2 more questions, sorry.

531
01:01:02.951 --> 01:01:07.717
<v Angelita Morillo>My next question is around the Prosper Portland recreational cannabis tax funds.

532
01:01:08.376 --> 01:01:12.523
<v Angelita Morillo>Um, can you tell us a bit more about their support for Prosper?

533
01:01:15.097 --> 01:01:15.322
<v Steve Novick>Yes.

534
01:01:15.594 --> 01:01:49.181
<v Cornell Wesley>So the record— the total amount of recreational cannabis tax totals around $3.1 million and is broken out to support 4 programs, that being their Reimagine Oregon program, which receives around $2 million, the IBRN, Inclusive Business Resource Network, which is just above $1 million, My People's Market, which is around $56,000, Mercatus Directory, So those— that's how— that is how it's broken out, and it's through those particular lanes, specifically 2, that serves the cannabis community.

535
01:01:49.695 --> 01:01:58.315
<v Cornell Wesley>The Reimagine grant is where you can apply, and through our partnership with affiliates and IBRN is how we extend those resources as well.

536
01:01:59.628 --> 01:02:00.094
<v Meg McElroy>Gotcha.

537
01:02:00.190 --> 01:02:15.298
<v Angelita Morillo>Okay, thank you, because I think, you know, when we talk about those cannabis tax dollars, I think there was a lot of discussion during 2020 about making sure that they're going towards Um, undoing harm for the Black community that's disproportionately incarcerated for this.

538
01:02:16.052 --> 01:02:18.510
<v Angelita Morillo>So I think we want to make sure that that continues to be a focus.

539
01:02:19.666 --> 01:02:23.181
<v Angelita Morillo>Um, my next question is for the Bureau of Planning and Sustainability.

540
01:02:23.552 --> 01:02:29.445
<v Angelita Morillo>Do we have any data that shows how we remediate graffiti at a property and then have to go back and do it again?

541
01:02:30.262 --> 01:02:38.079
<v Angelita Morillo>Um, because I feel like we spend millions of dollars sometimes getting rid of graffiti and then doing it multiple times at the same location?

542
01:02:38.257 --> 01:02:39.538
<v Angelita Morillo>Are we looking at any other options?

543
01:02:41.260 --> 01:02:42.068
<v Eric Engstrom>Thank you for the question.

544
01:02:42.487 --> 01:02:44.380
<v Eric Engstrom>Yeah, we could get some data on that.

545
01:02:44.429 --> 01:02:46.693
<v Eric Engstrom>We do— there are instances where we go back.

546
01:02:47.259 --> 01:02:53.057
<v Eric Engstrom>I will say that a repeated cleanup can have a deterrent effect over time.

547
01:02:53.836 --> 01:02:57.782
<v Eric Engstrom>If we continue to clean it up, the taggers will sometimes not return.

548
01:02:59.280 --> 01:03:06.996
<v Eric Engstrom>I also want to make it clear that the graffiti program also distributes the request for work to a variety of bureaus.

549
01:03:07.188 --> 01:03:12.601
<v Eric Engstrom>And so we're the keeper of the overall database of where the complaints and graffiti instances are.

550
01:03:12.793 --> 01:03:25.143
<v Eric Engstrom>And that's a key— coordinating that is a key element of— we coordinate with the police bureau with that data, and that's a core element of what they're able to use in their enforcement actions as well.

551
01:03:25.193 --> 01:03:28.869
<v Eric Engstrom>So it's not just that the money is going to cleanup.

552
01:03:28.934 --> 01:03:41.123
<v Eric Engstrom>There's some of these resources going to actual coordination and then a reminder that the money is going to small businesses, so it's not city cleaning up city offices.

553
01:03:41.251 --> 01:03:43.577
<v Eric Engstrom>It's, it's being spent with small businesses.

554
01:03:43.626 --> 01:03:50.188
<v Eric Engstrom>So if you want to look at it that way, it's a— we're helping small businesses survive during what might be otherwise a difficult time.

555
01:03:51.684 --> 01:03:53.025
<v Angelita Morillo>Okay, thank you so much.

556
01:03:53.380 --> 01:03:54.721
<v Angelita Morillo>That answers all my questions.

557
01:03:55.722 --> 01:03:56.657
<v Jamie Dunphy>Thank you, Councilor Morillo.

558
01:03:57.320 --> 01:03:57.869
<v Jamie Dunphy>Councilor Avalos.

559
01:03:59.141 --> 01:04:03.099
<v Candace Avalos>All right, so let's start with the DCA office and realignment.

560
01:04:03.342 --> 01:04:20.708
<v Candace Avalos>Looking at the scale of the realignment within the DCA's office, especially the jump from 6 to 58 positions through transferred functions, I want to know what the long-term governance vision is here, and specifically, how will this improve communication, transparency, and responsiveness between bureaus and council?

561
01:04:20.788 --> 01:04:24.853
<v Candace Avalos>Because frankly, from the legislative side, many of us are experiencing the The opposite.

562
01:04:25.333 --> 01:04:33.514
<v Candace Avalos>We are experiencing less access to information, less direct collaboration with bureaus, more centralization occurring during a major, major structural transition.

563
01:04:33.594 --> 01:04:40.221
<v Candace Avalos>And in fact, via the news on a records request, DCAs are telling their employers not to work with councilors, uh, and that's very frustrating.

564
01:04:40.492 --> 01:04:49.492
<v Candace Avalos>So how will you assure that this scale-up in bureaucracy will not further decrease councilors' access to information that we need to make budget and policy decisions?

565
01:04:49.958 --> 01:04:50.967
<v Candace Avalos>And this is to you, City Administrator.

566
01:04:51.065 --> 01:04:51.289
<v Candace Avalos>Thank you.

567
01:04:51.369 --> 01:04:52.701
<v Cornell Wesley>Councilor Sameer.

568
01:04:53.646 --> 01:05:18.974
<v Raymond C. Lee>I think in any situation where we have a change in form of government, where we're trying to scale an organization to be more responsible, more accountable to the changes that are happening in the organization, you see these type of expansions in staffing to assure that we have proper span of control as it relates to the functions that we're being asked to respond to overall.

569
01:05:20.018 --> 01:05:34.324
<v Raymond C. Lee>When we look at a communication to council, from my perspective, I've been very transparent with council as it relates to information and responsive to any inquiries that council may have of me.

570
01:05:34.405 --> 01:05:38.001
<v Raymond C. Lee>And that's the same thing that I'm requiring of our DCAs as well.

571
01:05:38.659 --> 01:05:56.878
<v Raymond C. Lee>If there are situations where you're— you feel as councilors that you're not getting that type of responsiveness, I would implore you to please let me know so I can work on those type of situations to address those things so council is being responded to in a timely fashion with accurate information.

572
01:05:58.945 --> 01:05:59.494
<v Donnie Oliveira>And Councilor—.

573
01:05:59.574 --> 01:06:02.302
<v Candace Avalos>I appreciate that, but I feel like we have been talking about this.

574
01:06:02.494 --> 01:06:10.090
<v Candace Avalos>I haven't seen a change, and it is continuing to be frustrating to me, especially as I'm entering a budget cycle where I'm being told council has the final say, we have the final say.

575
01:06:10.210 --> 01:06:10.690
<v Candace Avalos>I'm sorry.

576
01:06:11.204 --> 01:06:17.929
<v Candace Avalos>Meanwhile, you've already shaped the budget through a lens that is, in my opinion, trying to put blame on council.

577
01:06:18.170 --> 01:06:19.936
<v Candace Avalos>And I'm pretty annoyed right now.

578
01:06:20.097 --> 01:06:28.025
<v Candace Avalos>I'm on one because I've been sitting through these presentations and I do not feel that we have been given the tools to be empowered to do our jobs.

579
01:06:28.137 --> 01:06:29.373
<v Candace Avalos>And I don't need an answer to that right now.

580
01:06:29.983 --> 01:06:30.673
<v Candace Avalos>My next question.

581
01:06:31.268 --> 01:06:38.795
<v Candace Avalos>I continue to hear from East Portland constituents that they don't feel that downtown-centered recovery strategies reflect their lived experience or priorities.

582
01:06:39.195 --> 01:06:45.835
<v Candace Avalos>Many residents are asking for investment in neighborhood commercial corridors, community gathering spaces, safer streets, and basic infrastructure.

583
01:06:45.884 --> 01:06:53.195
<v Candace Avalos>So why is the city prioritizing an additional $200,000 toward downtown marketing and reputation management?

584
01:06:53.565 --> 01:07:04.998
<v Candace Avalos>And how are we evaluating whether these recurring downtown-focused investments are producing meaningful public benefit versus subsidizing older economic patterns that may need to adapt to new community realities?

585
01:07:06.009 --> 01:07:07.146
<v Candace Avalos>And that's a question for Prosper.

586
01:07:07.715 --> 01:07:09.387
<v Cornell Wesley>$200,000 Marketing.

587
01:07:09.728 --> 01:07:10.297
<v Donnie Oliveira>That's the DMI.

588
01:07:13.945 --> 01:07:14.090
<v Loretta Smith>Hmm.

589
01:07:14.268 --> 01:07:18.367
<v Cornell Wesley>Well, Councilor, you're correct that these are very challenging times.

590
01:07:19.820 --> 01:07:27.130
<v Cornell Wesley>The $200,000 in terms of marketing in downtown specifically, our GDP resides within our Central Business District.

591
01:07:27.195 --> 01:07:28.907
<v Cornell Wesley>The bulk of our impact resides there.

592
01:07:29.115 --> 01:07:43.903
<v Cornell Wesley>That is a lived reality, and it's important It's important that while we are using all of the tools available, because the $200,000 is just one tool, we have many other tools that are being used to target and address needs of the east side of our city.

593
01:07:44.418 --> 01:07:55.063
<v Cornell Wesley>And so this is one small pocket, but it is one important piece to generate interest in the assets that generate the most amount of income and impact for our city.

594
01:07:55.208 --> 01:07:55.833
<v Elana Pirtle-Guiney>Councilor Smith.

595
01:07:57.871 --> 01:08:10.278
<v Candace Avalos>Well, on that note, the reduction to the small business support is projected to reduce technical assistance access for about 175 small businesses and eliminating several community-based partners from the Inclusive Business Resource Network.

596
01:08:10.760 --> 01:08:20.386
<v Candace Avalos>So can you explain how we arrived at cutting community-based entrepreneurial support while simultaneously increasing funding for broader economic marketing and recovery strategies?

597
01:08:20.902 --> 01:08:26.677
<v Candace Avalos>And how are we prioritizing between direct neighborhood-level stabilization versus macro-level branding and attraction efforts?

598
01:08:29.109 --> 01:08:32.604
<v Cornell Wesley>So it is not an easy task, and I appreciate you calling that out.

599
01:08:32.939 --> 01:08:44.689
<v Cornell Wesley>But we have to be able to be targeted where we can see the most impact in the shortest amount of time while we are generating and building a broader scope or a broader strategy to impact our city at large.

600
01:08:44.978 --> 01:08:49.899
<v Cornell Wesley>Again, we have to use every tool that's available to us.

601
01:08:50.555 --> 01:08:54.114
<v Cornell Wesley>And I hear you when you call out the reduction in IBRN.

602
01:08:54.179 --> 01:09:10.850
<v Cornell Wesley>These decisions did not come but we had to be married to where we could see, given the reduction in force, the talent we have, and the resources, even if they are shrinking, where the impact can reside in the shortest amount of time, given that we're in recovery.

603
01:09:11.310 --> 01:09:21.810
<v Candace Avalos>Are you answering my question by saying that you all believe that the direct impact, or the thing that— the areas of the budget you believe give the most return are the areas that are not on the east side?

604
01:09:21.810 --> 01:09:22.729
<v Candace Avalos>Because that's how it's feeling in the public.

605
01:09:22.729 --> 01:09:22.810
<v Raymond C. Lee>I think that's fair.

606
01:09:23.570 --> 01:09:25.288
<v Cornell Wesley>No, that's not what I'm saying at all.

607
01:09:25.400 --> 01:09:34.523
<v Cornell Wesley>I'm saying I'm truly honoring the fact that this isn't easy and that impact and reductions in programming is not something or a space that any of us want to be operating in.

608
01:09:34.957 --> 01:09:49.345
<v Cornell Wesley>So these are very difficult decisions, and the choice between particularly operating in recovery is where can we get a quick return to hope, in hopes that there's impact that can be received and experienced across the city.

609
01:09:49.394 --> 01:09:49.698
<v Cornell Wesley>Councilor Smith.

610
01:09:50.295 --> 01:09:51.234
<v Candace Avalos>Where is the quick return?

611
01:09:52.318 --> 01:09:53.710
<v Candace Avalos>When you say the quick return, what do you mean?

612
01:09:54.244 --> 01:09:57.239
<v Cornell Wesley>What I'm defining quick return is in terms of impact.

613
01:09:57.595 --> 01:10:07.485
<v Cornell Wesley>If we are married to data and we can see that $1 can turn into $1.50 in this area, then that has to be a focus in times of recovery.

614
01:10:09.952 --> 01:10:12.172
<v Candace Avalos>I don't agree with that strategy, but I'll leave it at that.

615
01:10:12.382 --> 01:10:12.707
<v Candace Avalos>Thank you.

616
01:10:13.355 --> 01:10:14.069
<v Jamie Dunphy>Thank you, Councilor.

617
01:10:14.230 --> 01:10:14.944
<v Jamie Dunphy>Councilor Koyama Lane.

618
01:10:17.815 --> 01:10:19.073
<v Tiffany Koyama Lane>Thank you, Council President.

619
01:10:19.654 --> 01:10:29.020
<v Tiffany Koyama Lane>I have some questions about PSEF, and so I think I will need Ruth or someone else from CBO for my questions to be available.

620
01:10:34.550 --> 01:10:39.020
<v Tiffany Koyama Lane>Thank you.

621
01:10:40.360 --> 01:10:59.373
<v Tiffany Koyama Lane>Ruth, can you help clarify the relationship between Proposed staffing changes, reductions across the different bureaus, some that we've heard about today, and the connection to PCF, specifically where programs or positions have been supported in whole or in part by PCF.

622
01:11:01.680 --> 01:11:10.079
<v Tiffany Koyama Lane>And can it be clarified if where we're seeing those proposed reductions or cuts, are those funds now being moved to other priorities within the mayor's proposed budget?

623
01:11:10.146 --> 01:11:10.212
<v Tiffany Koyama Lane>Yes.

624
01:11:10.300 --> 01:11:13.018
<v Tiffany Koyama Lane>Like where we see the money for PMO.

625
01:11:13.244 --> 01:11:15.154
<v Tiffany Koyama Lane>Can we get really clear on that, please?

626
01:11:15.979 --> 01:11:16.578
<v Ruth>Sure.

627
01:11:16.724 --> 01:11:17.953
<v Ruth>Well, I'll try.

628
01:11:18.649 --> 01:11:19.247
<v Ruth>We might need to follow up.

629
01:11:19.394 --> 01:11:27.966
<v Ruth>But I think the 2 sort of places to talk about, we talked a lot about tree regulation yesterday.

630
01:11:28.210 --> 01:11:38.956
<v Ruth>So that's obviously the PCF dollars for that program moved from Parks to P&D in this in the '25-'26 budget.

631
01:11:40.518 --> 01:11:53.850
<v Ruth>And so I think you're kind of asking about what is sort of— if those are PSF-funded positions, why are some of them going away, which is similar to Councilor Novick's question and sort of the—.

632
01:11:54.335 --> 01:11:59.412
<v Tiffany Koyama Lane>I think I understand that situation a little bit more, but we're looking at some other PSF positions in today.

633
01:11:59.493 --> 01:12:00.570
<v Ruth>Okay, so then other— got it.

634
01:12:00.636 --> 01:12:19.912
<v Ruth>So then the other main changes the changes around PSF in the proposed budget are the shift from— of about $5.8 million into Portland Solutions, into primarily the PMO program in Portland Solutions.

635
01:12:20.345 --> 01:12:25.570
<v Ruth>And those are coming from 3 strategic programs that are in BES and PBOT.

636
01:12:27.061 --> 01:12:36.345
<v Ruth>The details on the BES The BES program, I don't have the position, like if there are any positions funded by that.

637
01:12:36.426 --> 01:12:37.889
<v Ruth>I'm looking back to see if anyone knows.

638
01:12:39.662 --> 01:12:40.083
<v Ruth>I don't know.

639
01:12:40.164 --> 01:12:45.583
<v Ruth>So we will follow up on that if that would have any position impacts of sort of taking that money out.

640
01:12:45.664 --> 01:12:48.957
<v Ruth>The LED streetlight program is not funding positions.

641
01:12:50.140 --> 01:12:52.912
<v Ruth>So I think we'll just have to get back to you on that BES program.

642
01:12:53.025 --> 01:12:54.257
<v Ruth>Does that answer your question at all?

643
01:12:54.338 --> 01:12:54.386
<v Meg McElroy>Yes.

644
01:12:54.918 --> 01:13:05.413
<v Tiffany Koyama Lane>Yeah, I mean, for example, I have an email this morning from a constituent that is saying PSF allocated funds in a certain way and now the mayor's moving those to other priorities.

645
01:13:06.965 --> 01:13:07.595
<v Tiffany Koyama Lane>That is accurate?

646
01:13:08.838 --> 01:13:10.761
<v Ruth>Just the $5.8 million, yeah.

647
01:13:11.181 --> 01:13:12.152
<v Tiffany Koyama Lane>Okay, thank you.

648
01:13:15.371 --> 01:13:25.672
<v Ruth>Sorry, just to be clear though, it's all within the CIP, so it's the same It's aligned with the programs that were initially funded through the CIP.

649
01:13:25.801 --> 01:13:28.417
<v Ruth>It's not changing the CIP allocations.

650
01:13:28.480 --> 01:13:34.935
<v Ruth>It's kind of saying instead of delivering this through BS and PBOT, it's being delivered through Portland Solutions.

651
01:13:35.130 --> 01:13:35.699
<v Tiffany Koyama Lane>Thank you.

652
01:13:36.024 --> 01:13:36.284
<v Meg McElroy>Yeah.

653
01:13:36.918 --> 01:13:37.796
<v Jamie Dunphy>Thank you, Councilor Koyama Lane.

654
01:13:38.203 --> 01:13:38.837
<v Jamie Dunphy>Councilor Zimmerman.

655
01:13:42.118 --> 01:13:42.538
<v Eric Zimmerman>Thank you.

656
01:13:43.440 --> 01:14:01.992
<v Eric Zimmerman>Donnie, you've got some interesting stuff in your portfolio here as a service area, but I'll take it, the fact that Prosper, who has its own independent board, still submits a budget to us that has to be approved by us.

657
01:14:02.460 --> 01:14:05.347
<v Eric Zimmerman>I'm getting a nod yes, that we can change it.

658
01:14:06.180 --> 01:14:08.649
<v Eric Zimmerman>Yeah, I think there's pretty broad agreement about that.

659
01:14:10.569 --> 01:14:14.507
<v Eric Zimmerman>But it often comes up because the other group that's sitting up here is PSEV.

660
01:14:14.831 --> 01:14:19.788
<v Eric Zimmerman>It often comes up that for some reason the City Council isn't the budget authority for PSEV.

661
01:14:19.869 --> 01:14:20.065
<v Eric Zimmerman>Yes.

662
01:14:20.699 --> 01:14:29.523
<v Eric Zimmerman>And I don't know why that continues to be this lagging concern that if a group of community members say so, that it just shall be.

663
01:14:29.990 --> 01:14:32.864
<v Eric Zimmerman>Why do you think that continues to plague this discussion?

664
01:14:34.319 --> 01:14:41.518
<v Eric Zimmerman>Has something happened at the staff level in the way that they train the advisors, or what is it that leads to this?

665
01:14:41.614 --> 01:14:43.622
<v Eric Zimmerman>'Cause I don't get this in other areas as much.

666
01:14:44.610 --> 01:14:47.854
<v Donnie Oliveira>Councilor, I'll do my best, but I wanna acknowledge the question's highly speculative.

667
01:14:48.301 --> 01:15:07.916
<v Donnie Oliveira>I don't want to— I'll just say what our relationship with, with the fund as, as a service area, as a bureau program, is to work within the confines of the Climate Investment Plan, which was definitely community-led and involved and informed, ultimately adopted by council and continues to be amended by council.

668
01:15:08.509 --> 01:15:09.935
<v Donnie Oliveira>And that is the overarching framework.

669
01:15:10.353 --> 01:15:17.023
<v Donnie Oliveira>But every single year, this body is the ultimate decider on how those dollars are appropriated and operated.

670
01:15:17.953 --> 01:15:23.194
<v Donnie Oliveira>And of course, there's some mechanics between what you decide, if we have to go back and clean up the CIP to reflect that.

671
01:15:23.322 --> 01:15:23.787
<v Donnie Oliveira>That's a thing.

672
01:15:24.460 --> 01:15:29.557
<v Donnie Oliveira>But at the end of the day, it is absolutely true that this body is the ultimate decider for the budget.

673
01:15:30.470 --> 01:15:38.292
<v Donnie Oliveira>Whatever narrative may be in the zeitgeist about how PSUF is programmed or spent, I'd like to balance that with what the truth is.

674
01:15:38.389 --> 01:15:41.418
<v Donnie Oliveira>And the truth is we have a very complex program with a lot of initiatives.

675
01:15:41.578 --> 01:15:41.675
<v Donnie Oliveira>Thank you.

676
01:15:42.171 --> 01:15:45.664
<v Donnie Oliveira>That take a lot of staff time, not just at BPS but across the city, to deliver on.

677
01:15:46.322 --> 01:15:58.530
<v Donnie Oliveira>And I think it would do everybody— and I'm just going to riff here because the question, uh, you know, framed it this way— is for us to be disciplined enough to allow the teams and the bureaus to deliver on the SPs we've committed to.

678
01:15:59.235 --> 01:16:02.439
<v Donnie Oliveira>We have had, uh, since day one of PCF— I'm just going to riff now if you don't mind.

679
01:16:02.904 --> 01:16:17.408
<v Donnie Oliveira>Um, since PCF's inception, the scrutiny and the armchair quarterbacking that's gone on has been— and I was there from day I've never seen a program in all my professional years nitpicked at the way this one has been.

680
01:16:18.387 --> 01:16:26.564
<v Donnie Oliveira>And the hardest part is the staff working with community, working with electeds, are doing their best to deliver on what they think the intent is of direction.

681
01:16:27.543 --> 01:16:31.930
<v Donnie Oliveira>And that gets really murky when we have an investment plan and a budget process.

682
01:16:31.978 --> 01:16:37.536
<v Donnie Oliveira>But at the end of the day, they are delivering on what you all determine is appropriate in your budget process.

683
01:16:37.585 --> 01:16:37.680
<v Donnie Oliveira>Thank you.

684
01:16:38.082 --> 01:16:39.046
<v Donnie Oliveira>That really is the facts.

685
01:16:39.672 --> 01:16:46.259
<v Donnie Oliveira>And again, if we— if you decided to make a change that wasn't aligned with CIP, we would go back and update the CIP to reflect that.

686
01:16:46.515 --> 01:16:48.412
<v Donnie Oliveira>So that just shows how much agency you all have.

687
01:16:48.685 --> 01:16:52.475
<v Eric Engstrom>Well, not only the budget, but you're the final authority on the CIP itself too.

688
01:16:52.636 --> 01:17:00.652
<v Eric Engstrom>So I think from a staff perspective, our interest is to have an orderly process that's regular and happens each year and that is informed by analysis.

689
01:17:00.733 --> 01:17:05.359
<v Eric Engstrom>But we completely acknowledge that that decision is council's at the end of the day.

690
01:17:05.792 --> 01:17:07.573
<v Eric Zimmerman>Yeah, so thank you.

691
01:17:07.796 --> 01:17:23.948
<v Eric Zimmerman>I agree with you, and I find it to be at times the third rail for unnecessary reasons that it's reasonable to have a conversation about the, you know, the right place or the right program to deliver on one of those initiatives from the CIP is an okay thing to talk about.

692
01:17:25.119 --> 01:17:34.037
<v Eric Zimmerman>Going into, I just want to make sure because, right, Eric, you presented for several slides today, but I'll just say as far as I can tell, there's only one thank you.

693
01:17:34.118 --> 01:17:36.798
<v Eric Zimmerman>I'm going to go ahead and start with the program page for PSEF in the budget that I was handed.

694
01:17:37.247 --> 01:17:44.520
<v Eric Zimmerman>So there's a lot in your budget, but let's just go over some numbers so that we can be kind of clear on what we're talking about.

695
01:17:44.632 --> 01:17:52.498
<v Eric Zimmerman>So in 2024 actuals for the revenues by fund, I'm going to circle here that PSEF was at $167 million.

696
01:17:53.284 --> 01:17:57.426
<v Eric Zimmerman>In '25-'26, it jumped to $848 million.

697
01:17:57.684 --> 01:18:01.856
<v Eric Zimmerman>And in the proposed budget, it's $701 million.

698
01:18:02.050 --> 01:18:08.177
<v Eric Zimmerman>And in the program expenses, In 2024, it was about $51 million.

699
01:18:08.850 --> 01:18:12.538
<v Eric Zimmerman>In '25-'26, it's $500 million.

700
01:18:12.698 --> 01:18:16.435
<v Eric Zimmerman>And now in this proposed budget, it's $233 million.

701
01:18:17.590 --> 01:18:19.145
<v Eric Zimmerman>So there's some big changes here.

702
01:18:19.273 --> 01:18:30.752
<v Eric Zimmerman>And last year we got into a conversation about contingency versus reserve allocated for out-year programs and things that we know are like 5-year implementations.

703
01:18:30.801 --> 01:18:36.596
<v Eric Zimmerman>And so we're sitting in the position where we have some money in the bank, so to speak, because we know we need to spend outward.

704
01:18:37.159 --> 01:18:39.520
<v Eric Zimmerman>But we've got some broad jumps here.

705
01:18:39.729 --> 01:18:54.108
<v Eric Zimmerman>But am I, am I reading correctly that the, the staff that works at PSEF is essentially putting out $233 million worth of work this coming year as the proposed?

706
01:18:54.332 --> 01:18:55.136
<v Eric Zimmerman>Thank you, I'm getting a nod.

707
01:18:55.216 --> 01:18:55.618
<v Eric Engstrom>That's right.

708
01:18:56.277 --> 01:19:04.052
<v Eric Zimmerman>And in the bank account though, we'll draw against $701,000 that we're expecting to have in the bank account.

709
01:19:04.134 --> 01:19:05.403
<v Eric Zimmerman>That is the reserve.

710
01:19:05.981 --> 01:19:07.862
<v Eric Zimmerman>We've changed from contingency to a reserve.

711
01:19:07.909 --> 01:19:12.377
<v Eric Engstrom>$425,000 Is the stuff we're not allocating this year.

712
01:19:12.569 --> 01:19:14.529
<v Eric Engstrom>That is the leftover at the end of the day.

713
01:19:15.381 --> 01:19:18.885
<v Eric Engstrom>Okay, and that's what's in the bank for the future year investments.

714
01:19:19.479 --> 01:19:20.105
<v Eric Zimmerman>Yep, yep.

715
01:19:20.234 --> 01:19:21.632
<v Eric Zimmerman>So exactly.

716
01:19:21.680 --> 01:19:24.171
<v Eric Zimmerman>So drawn against the expenses, we get to that $701,000.

717
01:19:24.220 --> 01:19:26.498
<v Eric Engstrom>2 other things I want to say about yeah.

718
01:19:27.509 --> 01:19:39.484
<v Eric Engstrom>One thing, and I'll look to the CFO to acknowledge this, but I think we changed where we put that future year reserve a couple years ago, and so it wasn't in the same place in the budget.

719
01:19:39.612 --> 01:19:41.295
<v Eric Engstrom>And so that's partly why the numbers jumped.

720
01:19:41.536 --> 01:19:43.298
<v Eric Zimmerman>I'm acknowledging that.

721
01:19:43.378 --> 01:19:56.673
<v Eric Engstrom>The other thing that is going on there is this last year was the first time that we actually spent are spending more money than we took in because it took us a couple years to really ramp up the spending.

722
01:19:56.786 --> 01:20:02.756
<v Eric Engstrom>We launched a couple very large contracts this year for the multifamily and single-family energy, the e-bikes program.

723
01:20:02.885 --> 01:20:08.117
<v Eric Engstrom>So yeah, the, the program is now operating at full speed, and that represents some of the changes you're seeing there.

724
01:20:09.127 --> 01:20:10.957
<v Eric Zimmerman>That is good news, and I'm happy to hear it.

725
01:20:11.295 --> 01:20:16.173
<v Eric Engstrom>And that's what keeps me up at night, is us not spending this money appropriately.

726
01:20:16.365 --> 01:20:29.838
<v Eric Zimmerman>6 and a half okay, so I would love a proposal given the— given that the shenanigans that have gone on with the Parks Bureau and what PCF did or didn't cover with respect to tree code compliance.

727
01:20:30.386 --> 01:20:43.518
<v Eric Zimmerman>I would like the assistance and I'll offer it now to consider an amendment to this budget to use additional PCF dollars to preserve the tree code compliance officers that were moved to PP&D.

728
01:20:44.073 --> 01:20:55.953
<v Eric Zimmerman>So in an effort to use y'all's work and your numbers so that they can speak for themselves like Parks did, I will request your support in drafting that amendment to bring that forward.

729
01:20:56.484 --> 01:21:03.311
<v Eric Zimmerman>With $500 million in the bank, I do believe that we can probably squeeze out a couple of FTE to keep that program as it is.

730
01:21:03.489 --> 01:21:03.765
<v Eric Zimmerman>Thank you.

731
01:21:04.381 --> 01:21:04.689
<v Eric Zimmerman>Thank you, Mr.—.

732
01:21:05.127 --> 01:21:06.069
<v Jamie Dunphy>Thank you, Councilor Zimmerman.

733
01:21:06.750 --> 01:21:07.770
<v Jamie Dunphy>Councilor Pirtle-Guiney.

734
01:21:09.408 --> 01:21:10.511
<v Elana Pirtle-Guiney>Thank you, Council President.

735
01:21:11.231 --> 01:21:11.793
<v Elana Pirtle-Guiney>Councilor Loretta Smith.

736
01:21:11.873 --> 01:21:19.661
<v Elana Pirtle-Guiney>First of all, we have some more detail in this presentation than in others, specifically around how realignment is working, and I appreciate that.

737
01:21:19.822 --> 01:21:30.194
<v Elana Pirtle-Guiney>I also really appreciate having Prosper here so that we can talk about economic development holistically and not what are we doing within city bureaus and what are we doing as Prosper.

738
01:21:30.274 --> 01:21:36.184
<v Elana Pirtle-Guiney>So I don't know if that gratitude goes to the city administrator or the DCA or the council president.

739
01:21:36.761 --> 01:21:41.176
<v Elana Pirtle-Guiney>But whoever made those calls, I appreciate that that's how we're having the conversation today.

740
01:21:42.525 --> 01:21:48.884
<v Elana Pirtle-Guiney>I would like to understand what's going on with our workforce programs in the Prosper budget.

741
01:21:49.365 --> 01:21:51.180
<v Elana Pirtle-Guiney>There are a lot of moving pieces.

742
01:21:51.372 --> 01:22:02.467
<v Elana Pirtle-Guiney>I got some additional information from Prosper staff, and I still want to make sure I know what's happening here because it seems Thank you.

743
01:22:02.548 --> 01:22:12.086
<v Elana Pirtle-Guiney>It seems as though we are cutting pretty deeply into our workforce supports, which is a lot of what we've depended on for economic development in our city in the past.

744
01:22:12.984 --> 01:22:19.841
<v Elana Pirtle-Guiney>So as I understand it, there are 3 different things happening with our workforce programs.

745
01:22:20.981 --> 01:22:29.600
<v Elana Pirtle-Guiney>There were one-time resources added to workforce programs last year that have expired and are for the most part not being backfilled.

746
01:22:30.798 --> 01:22:34.341
<v Elana Pirtle-Guiney>There is some backfill though of those programs.

747
01:22:36.429 --> 01:22:46.119
<v Elana Pirtle-Guiney>There is an additional cut outside of those one— that loss of one-time resources of about $260,000.

748
01:22:48.096 --> 01:23:05.635
<v Elana Pirtle-Guiney>And then there is maybe some money moving around in the backfilled dollars that are going in and a different split between grant dollars going out of the door and staff at Prosper to maybe administer those grant dollars, but maybe do your own workforce programs within Prosper.

749
01:23:05.715 --> 01:23:11.543
<v Elana Pirtle-Guiney>It's not totally clear because it looks like it's more staff than you had doing that work previously.

750
01:23:12.475 --> 01:23:37.050
<v Elana Pirtle-Guiney>So can you help me understand, at the end of the day, what does this look like for So the bottom number that you—.

751
01:23:37.050 --> 01:23:40.449
<v Cornell Wesley>That is the real net is the $445,000 that's been mentioned.

752
01:23:40.569 --> 01:23:49.695
<v Cornell Wesley>Now I can back up and say, you know, the $2 million, if you want a historical, what walkthrough of the $2 million in one-time funding and how we arrive at the $445 million, or do you want to just start at the $445 million?

753
01:23:50.132 --> 01:23:56.670
<v Elana Pirtle-Guiney>Let's start at the $445 million, but what I'd like to understand in the historical net is the impact of service delivery.

754
01:23:56.814 --> 01:24:03.997
<v Elana Pirtle-Guiney>I don't need to walk through the numbers, I just need to know then compared to now, what are we doing and what are we not doing?

755
01:24:04.451 --> 01:24:11.796
<v Cornell Wesley>So in simple terms, we're adding back a million that will support adult and youth workforce, and that's money going out the door in grants.

756
01:24:12.037 --> 01:24:12.470
<v Cornell Wesley>That's correct.

757
01:24:12.519 --> 01:24:17.831
<v Cornell Wesley>And there's a portion of that to help in a limited-term capacity implement that program.

758
01:24:17.895 --> 01:24:20.912
<v Cornell Wesley>So that will present itself in the form of a person.

759
01:24:21.265 --> 01:24:31.070
<v Elana Pirtle-Guiney>Why do we need funds to implement that in a limited term if these are grants going out the door to a single service provider who we have worked with extensively in the past?

760
01:24:31.198 --> 01:24:33.029
<v Elana Pirtle-Guiney>I assume these are dollars going to Work Systems.

761
01:24:34.520 --> 01:24:45.805
<v Cornell Wesley>So how it goes to Work Systems, systems, but there's additional resources, or rather talent, that's required to administer that relationship.

762
01:24:46.046 --> 01:24:49.635
<v Cornell Wesley>So staff time still is embedded there in that partnership.

763
01:24:49.954 --> 01:24:55.884
<v Cornell Wesley>While we are not the direct provider, there's still staffing that's time dedicated to it.

764
01:24:56.284 --> 01:24:59.554
<v Cornell Wesley>And currently, with that reduction in force, we don't have that in place.

765
01:25:00.131 --> 01:25:07.979
<v Cornell Wesley>So it's really trying to continue doing the work we're already doing, And replacing it, leveraging this financial tool.

766
01:25:08.367 --> 01:25:16.087
<v Elana Pirtle-Guiney>So did we have that staff person doing this work last year, or are we adding a new staff person to do this work as we are cutting the amount of grant dollars going out the door?

767
01:25:18.010 --> 01:25:23.984
<v Cornell Wesley>We're doing more with less, and that's what we've been doing.

768
01:25:24.177 --> 01:25:49.083
<v Elana Pirtle-Guiney>Now, hopefully, under this current structure, we will be able to have some relief to the team So my concern is that we're cutting the dollars that go to actually support individuals in our community in workforce programs at the same time that we are adding a staff person to administer those programs.

769
01:25:49.131 --> 01:25:51.438
<v Elana Pirtle-Guiney>And I'm trying to understand if that's what's happening here.

770
01:25:52.890 --> 01:25:57.990
<v Cornell Wesley>Well, I think the mayor is very clear about his commitment with $1 million going back into it, with intent is.

771
01:25:58.729 --> 01:26:03.162
<v Cornell Wesley>Uh, we're just trying to do our best job to, to operate within the spirit of that intent.

772
01:26:03.403 --> 01:26:03.916
<v Elana Pirtle-Guiney>I hear that.

773
01:26:04.109 --> 01:26:04.895
<v Elana Pirtle-Guiney>I understand that.

774
01:26:04.992 --> 01:26:28.422
<v Elana Pirtle-Guiney>And I, I understand that folks might make different decisions on what we want to do, but practically, are we sending less dollars out the door in grants and therefore supporting fewer Portlanders in workforce programs while adding a new staff person who we don't currently councilor, we're sending less money out the door across the board.

775
01:26:28.841 --> 01:26:45.342
<v Cornell Wesley>And, and, and so that answer would be yes in several programmatic lanes where we can cover and, and, and try to right-size the implementation and operation of those and/or, and/or the facilitation of those relationships is what we're trying to accomplish.

776
01:26:45.632 --> 01:26:47.913
<v Cornell Wesley>But we are reducing resources across the board.

777
01:26:47.979 --> 01:26:54.354
<v Elana Pirtle-Guiney>And you're saying, and we're in a cuts budget, but are we adding a new internal position, or is this a position that exists?

778
01:26:56.105 --> 01:27:01.537
<v Cornell Wesley>It is a position that has been cut, and we're trying to bring additional support in.

779
01:27:01.810 --> 01:27:09.010
<v Elana Pirtle-Guiney>Was it cut in this budget but it existed last year, or was it cut in last year's budget and we have not had that position for the past year?

780
01:27:09.902 --> 01:27:11.930
<v Cornell Wesley>Let me get some historical context on that for you.

781
01:27:12.402 --> 01:27:13.943
<v Elana Pirtle-Guiney>Okay, that would be great to understand.

782
01:27:15.579 --> 01:27:33.113
<v Elana Pirtle-Guiney>It looks like the bulk of Prosper's cuts are in workforce and IBRN, and then there is a shift in what used to— there was $1 million in repair grants last year, and there's a shift now to reduce that to $200,000 and put some of those dollars toward the recruitment of new businesses.

783
01:27:33.259 --> 01:27:38.317
<v Elana Pirtle-Guiney>Is that a fair way to summarize the main changes in the Prosper Portland budget?

784
01:27:39.184 --> 01:27:39.664
<v Elana Pirtle-Guiney>Reductions to workforce.

785
01:27:39.729 --> 01:27:46.030
<v Elana Pirtle-Guiney>Workforce reductions to IBRN, and then that shift in the supports that are available for storefronts?

786
01:27:48.046 --> 01:27:49.332
<v Elana Pirtle-Guiney>I'd say that's mostly correct.

787
01:27:49.975 --> 01:27:50.296
<v Elana Pirtle-Guiney>Okay.

788
01:27:51.340 --> 01:27:55.550
<v Elana Pirtle-Guiney>Council President, I may get back in the queue, but I want to pause there and ruminate on those things.

789
01:27:55.631 --> 01:27:56.354
<v Dan Ryan>Thank you.

790
01:27:56.498 --> 01:28:01.278
<v Jamie Dunphy>Colleagues, I'm going to give us a— I'm going to say 13-minute break.

791
01:28:01.342 --> 01:28:03.087
<v Jamie Dunphy>I'd like everybody back here at 11:10, please.

792
01:28:04.898 --> 01:28:05.140
<v Jamie Dunphy>Thank you.

793
01:43:36.956 --> 01:43:38.512
<v Jamie Dunphy>And we are back.

794
01:43:38.899 --> 01:43:41.484
<v Jamie Dunphy>We are going to jump back into councilor questions.

795
01:43:41.532 --> 01:43:43.395
<v Jamie Dunphy>There's at least— actually, I'm going to put myself in the queue.

796
01:43:43.939 --> 01:43:44.840
<v Jamie Dunphy>Councilor Clark, kick us off.

797
01:43:44.920 --> 01:43:46.412
<v Jamie Dunphy>Vice President Clark, kick us off, please.

798
01:43:46.685 --> 01:43:48.179
<v Olivia Clark>Thank you, President Dunphy.

799
01:43:48.997 --> 01:43:50.908
<v Olivia Clark>Uh, thank you everyone.

800
01:43:51.118 --> 01:43:53.077
<v Olivia Clark>It's been a good discussion.

801
01:43:53.189 --> 01:44:04.395
<v Olivia Clark>I've really enjoyed the give and take, and, um, I want to say to, um, DCA Donnie that I really appreciated that riff It is murky.

802
01:44:04.750 --> 01:44:06.965
<v Olivia Clark>It's going to get murkier, I'll just bet you.

803
01:44:08.121 --> 01:44:09.599
<v Olivia Clark>But I really appreciated that.

804
01:44:10.032 --> 01:44:14.190
<v Olivia Clark>I just have a couple of comments and questions and observations.

805
01:44:14.287 --> 01:44:23.247
<v Olivia Clark>Just on slide 22 about the reduction of art small grants for artists and event sponsorships, this is kind of concerning to me.

806
01:44:24.001 --> 01:44:30.381
<v Olivia Clark>I'm just wondering, I'm going to overuse this phrase about pennywise.

807
01:44:30.654 --> 01:44:41.250
<v Olivia Clark>But can you talk a little bit more about the— how this is going to affect downtown activation and how it might impact P5?

808
01:44:41.751 --> 01:44:43.140
<v Olivia Clark>Is there a connection here?

809
01:44:43.203 --> 01:44:50.041
<v Olivia Clark>I'm just concerned about what you're saying is approximately 45 to 55 fewer publicly accessible performances.

810
01:44:50.641 --> 01:44:54.161
<v Olivia Clark>Is that something you can just give me a little more detail what the impact would be?

811
01:44:54.210 --> 01:44:54.274
<v Olivia Clark>Sure.

812
01:44:55.250 --> 01:44:55.798
<v Olivia Clark>It's concerning.

813
01:44:56.380 --> 01:44:58.576
<v Olivia Clark>Yeah, it's, uh, slide 22.

814
01:45:00.594 --> 01:45:06.368
<v Cherity Montez>So when we talk about our small grants program, the awards range from $1,000 to $5,000.

815
01:45:06.481 --> 01:45:07.689
<v Cherity Montez>So they're very small grants.

816
01:45:07.753 --> 01:45:19.078
<v Cherity Montez>So we're talking about awards for individual artists, arts collectives, emerging arts organizations, or organizations that are not eligible for our operating support grants.

817
01:45:19.256 --> 01:45:20.364
<v Cherity Montez>They're really like project grants.

818
01:45:21.488 --> 01:45:29.167
<v Cherity Montez>And there is oftentimes, you know, that's where some of our small grants for musicians go.

819
01:45:29.796 --> 01:45:30.796
<v Cherity Montez>And there is a nexus.

820
01:45:30.845 --> 01:45:38.432
<v Cherity Montez>They do have oftentimes a public performance or an exhibition or some publicly engaged way that that art is available.

821
01:45:38.773 --> 01:45:48.662
<v Cherity Montez>But it does not impact these— this reduction would not impact— would not likely impact any of the kinds of performances that you would see at Portland 5 Center.

822
01:45:48.760 --> 01:45:49.068
<v Cherity Montez>I follow your logic.

823
01:45:49.228 --> 01:45:51.490
<v Olivia Clark>Okay, that's really helpful, Charity.

824
01:45:51.538 --> 01:45:53.256
<v Olivia Clark>I really, I appreciate that response.

825
01:45:53.850 --> 01:45:59.547
<v Olivia Clark>Um, then on to slide 28, um, the investment program.

826
01:45:59.966 --> 01:46:03.400
<v Olivia Clark>First of all, I just want to say I really support the small business program.

827
01:46:03.640 --> 01:46:13.192
<v Olivia Clark>Um, I've had contact with it, uh, put the office in touch with some of the small business associations in my neighborhoods, and I, I really appreciate that work.

828
01:46:13.672 --> 01:46:25.453
<v Olivia Clark>I hope we can continue and, and maybe even eventually strengthen and I wanted to address that focus on the downtown because to me it's very, very important, the downtown.

829
01:46:27.082 --> 01:46:36.136
<v Olivia Clark>I think we, we tend to forget that so much of our property taxes that fund the programs that we want citywide come from the downtown.

830
01:46:36.873 --> 01:46:43.082
<v Olivia Clark>So anything we can do to activate it, to change that reputation, I think is very, very valuable.

831
01:46:43.997 --> 01:46:44.545
<v Olivia Clark>I did have a question.

832
01:46:44.652 --> 01:46:54.185
<v Olivia Clark>I do have a question though about the grants that you talked about, that the mayor has talked about, the $100,000 for grocery stores, the $50,000 for restaurants.

833
01:46:54.606 --> 01:46:59.720
<v Olivia Clark>Are you targeting those in districts, or how is that going to work?

834
01:47:00.920 --> 01:47:10.038
<v Cornell Wesley>Yes, so there is still obviously some formation taking place on how you program, and we want to honor the spirit of data and geographic priorities.

835
01:47:10.181 --> 01:47:10.550
<v Cornell Wesley>Areas.

836
01:47:11.127 --> 01:47:14.716
<v Cornell Wesley>But full stop, you know, as the mayor has indicated, we want to be first money in.

837
01:47:15.789 --> 01:47:26.574
<v Cornell Wesley>And so we will obviously market this opportunity extensively and measure those who illustrate interest based upon the impact that they propose.

838
01:47:27.167 --> 01:47:33.865
<v Cornell Wesley>It's limited resources, and so we have to go with the highest amount of impact with the limited amount of resources that we have.

839
01:47:34.378 --> 01:47:37.939
<v Cornell Wesley>But we also have obviously some logic in how we approach that work.

840
01:47:38.711 --> 01:47:44.828
<v Olivia Clark>Well, do you have any idea when that might hit the streets, so to speak?

841
01:47:46.002 --> 01:47:54.609
<v Cornell Wesley>Well, contingent upon this council's approval of the budget, we will work efficiently as fast to get that resource deployed.

842
01:47:54.706 --> 01:47:55.106
<v Olivia Clark>Gotcha.

843
01:47:55.332 --> 01:47:55.797
<v Olivia Clark>Gotcha.

844
01:47:56.216 --> 01:48:00.953
<v Olivia Clark>Well, the first thing I think about when I think about grocery stores is I think about Gateway.

845
01:48:01.177 --> 01:48:03.088
<v Olivia Clark>I think about District 1.

846
01:48:03.992 --> 01:48:11.127
<v Olivia Clark>And even though I'm— I represent District 4, I think there's a real need on the east side for some of these dollars.

847
01:48:12.630 --> 01:48:13.225
<v Olivia Clark>Okay, great.

848
01:48:13.305 --> 01:48:17.185
<v Olivia Clark>And then lastly, um, thank you for that response.

849
01:48:17.394 --> 01:48:18.118
<v Olivia Clark>Yes, ma'am.

850
01:48:18.215 --> 01:48:22.497
<v Olivia Clark>I just had a comment or question about PSF, back to the murky.

851
01:48:24.686 --> 01:48:32.490
<v Olivia Clark>Um, it just seems to me that— and I'm not an expert in the CIP, and I know we're going to have an that'll be really interesting.

852
01:48:33.980 --> 01:48:49.689
<v Olivia Clark>But it seems to me that the MOTA, if there are emissions reductions and we're looking at a LEED Platinum, that it would fall under energy efficiency, renewable energy, or even green infrastructure.

853
01:48:50.094 --> 01:48:53.322
<v Olivia Clark>It just seems like there's a— there is a nexus there for the MOTA.

854
01:48:53.568 --> 01:48:56.346
<v Olivia Clark>And I know I'm jumping ahead, but— I think that's a fair point.

855
01:48:56.439 --> 01:48:59.646
<v Olivia Clark>But it just seems that that's a logical connection.

856
01:49:00.859 --> 01:49:05.775
<v Olivia Clark>I don't know if you want to comment on that murky area or—.

857
01:49:06.096 --> 01:49:07.768
<v Donnie Oliveira>Councilor, thank you for the question.

858
01:49:08.024 --> 01:49:40.957
<v Donnie Oliveira>And I just, I want to acknowledge, because it's come up a few times around the relationship between the motor renovations and potential use of PSF dollars, while we think there's, as the mayor said before and we've said generally speaking, there's a potential for the fact remains, as we sit here today, we have not dove into anything that even looks like final blueprints or plans or engineering for us to even contemplate what eligibility would look like, if there's existing SP or strategic initiatives, or there need to be amendments to the CIP.

859
01:49:41.475 --> 01:49:42.631
<v Donnie Oliveira>That work's going to come very shortly.

860
01:49:43.710 --> 01:49:45.851
<v Donnie Oliveira>But first things first, we actually have to have something to work off of.

861
01:49:47.588 --> 01:49:55.101
<v Donnie Oliveira>But to acknowledge this, when we are looking at the Moto renovation, it's already been operating as a LEED Platinum facility.

862
01:49:55.181 --> 01:49:58.118
<v Donnie Oliveira>We think we can go above that, especially during the renovation.

863
01:49:58.471 --> 01:50:06.881
<v Donnie Oliveira>There's opportunities to look at everything from further investments in localized solar, but also battery storage, increased transportation demand strategies, et cetera.

864
01:50:06.961 --> 01:50:10.154
<v Donnie Oliveira>The point is there's a lot of opportunities of developments of this scale.

865
01:50:10.925 --> 01:50:12.722
<v Donnie Oliveira>So there is a nexus with emissions.

866
01:50:13.301 --> 01:50:13.381
<v Donnie Oliveira>Okay.

867
01:50:13.461 --> 01:50:18.275
<v Donnie Oliveira>Us landing it specifically to the So that's up to PSIF and the CIP as work to be done over the summer.

868
01:50:18.389 --> 01:50:18.469
<v Elana Pirtle-Guiney>Sure.

869
01:50:18.757 --> 01:50:19.448
<v Olivia Clark>I appreciate that.

870
01:50:19.720 --> 01:50:20.057
<v Olivia Clark>I really do.

871
01:50:20.122 --> 01:50:23.349
<v Olivia Clark>I just thought it just made logical sense to me in the big picture.

872
01:50:23.814 --> 01:50:31.166
<v Olivia Clark>And you mentioned transportation demand management, and I see that TriMet received $55 million plus.

873
01:50:31.534 --> 01:50:34.135
<v Olivia Clark>Is that for the 82nd Street bus rapid transit?

874
01:50:34.408 --> 01:50:34.568
<v Olivia Clark>Correct.

875
01:50:34.649 --> 01:50:36.012
<v Olivia Clark>That's exclusively for that?

876
01:50:36.574 --> 01:50:36.912
<v Olivia Clark>Okay.

877
01:50:37.248 --> 01:50:37.408
<v Olivia Clark>Okay.

878
01:50:38.019 --> 01:50:38.340
<v Olivia Clark>Thank you.

879
01:50:38.421 --> 01:50:39.608
<v Olivia Clark>I think those are my questions.

880
01:50:39.704 --> 01:50:41.164
<v Olivia Clark>Thanks very much, Council President.

881
01:50:41.246 --> 01:50:42.755
<v Jamie Dunphy>Thank you, Vice President Clark.

882
01:50:43.060 --> 01:50:46.838
<v Jamie Dunphy>Okay, colleagues, I'm going to make sure I can prioritize folks who have not asked first.

883
01:50:46.967 --> 01:50:52.362
<v Jamie Dunphy>So I'm going to go— next 4 is going to be Kanal, Ryan, Novick, Zimmerman.

884
01:50:56.693 --> 01:50:58.065
<v Sameer Kanal>Thank you, Council President.

885
01:50:58.389 --> 01:50:59.585
<v Sameer Kanal>Thanks everybody for the presentations.

886
01:51:00.795 --> 01:51:01.634
<v Sameer Kanal>I got a bunch of questions.

887
01:51:01.682 --> 01:51:04.445
<v Sameer Kanal>I'll try to pick and choose and then get back into the queue.

888
01:51:05.815 --> 01:51:08.457
<v Sameer Kanal>I did— I'll close with something up there.

889
01:51:09.380 --> 01:51:20.923
<v Sameer Kanal>I do want to talk about uh, slide 7, there's a question around, um, Prosper staff in a previous work session where we heard that Prosper was losing 2 equity positions.

890
01:51:21.565 --> 01:51:26.655
<v Sameer Kanal>DC Oliveira, you said that the presentation includes Prosper staff, but slide 7 shows no reductions to equity.

891
01:51:27.154 --> 01:51:31.842
<v Sameer Kanal>So can you briefly explain if this slide is an exception to the rule, if there's more info out there?

892
01:51:32.068 --> 01:51:32.918
<v Donnie Oliveira>Yeah, thank you, Councilor.

893
01:51:33.110 --> 01:51:34.059
<v Donnie Oliveira>I appreciate that distinction.

894
01:51:34.139 --> 01:51:38.650
<v Donnie Oliveira>I was specifically referring to that slide that showed the full FTE for the service area.

895
01:51:39.051 --> 01:51:47.253
<v Donnie Oliveira>In this particular case, these are only city employee Uh, machinations because they're moving from bureaus into the business ops service area.

896
01:51:47.413 --> 01:51:50.961
<v Donnie Oliveira>So this is specific to city employees, not Prosper.

897
01:51:51.810 --> 01:51:52.436
<v Sameer Kanal>Okay, thanks.

898
01:51:52.837 --> 01:51:57.122
<v Sameer Kanal>Um, let's go to— and this is a question for the mayor.

899
01:51:57.346 --> 01:52:00.315
<v Sameer Kanal>It's about slide 18, and it's about the Arts and Culture Office.

900
01:52:00.621 --> 01:52:16.896
<v Sameer Kanal>There's $4.2 million in general fund here, and Mr. Mayor, I know that in a lot of other places in the budget where there's braided funding, you have reduced or eliminated general fund allocations to groups that have other sources of funding.

901
01:52:17.409 --> 01:52:23.175
<v Sameer Kanal>And I would just like to understand the rationale for when that was used and when it wasn't.

902
01:52:23.737 --> 01:52:33.563
<v Sameer Kanal>I think this applies to PROSPER as well, but specific to arts and culture, when sometimes general fund remains and when it was removed, like with PBOT, for example, is removed.

903
01:52:33.692 --> 01:52:34.158
<v Cherity Montez>Councilor Herbold.

904
01:52:36.033 --> 01:52:40.105
<v Keith Wilson>And I'm gonna ask Donnie, I'll let you take point in this, but let me understand.

905
01:52:40.185 --> 01:52:49.146
<v Sameer Kanal>You were talking generally about how we moved funds around or how we stopped putting general fund into bureaus that had other sources.

906
01:52:50.220 --> 01:53:06.320
<v Keith Wilson>When we looked at the global view of how we set the budget up, we looked at general fund going to restricted bureaus, restricted revenue bureaus, for instance, water, sewer, Transportation had rate-based, fee-based, or different revenue sources.

907
01:53:06.515 --> 01:53:08.463
<v Keith Wilson>And that's really what we looked at for the nexus.

908
01:53:08.869 --> 01:53:16.997
<v Keith Wilson>And then when it came to PBOT specifically, yes, we had seen a degradation of their revenue every single year except for the TUF.

909
01:53:17.092 --> 01:53:19.886
<v Keith Wilson>And I'm grateful for you that you passed the transportation utility fee.

910
01:53:21.449 --> 01:53:26.042
<v Keith Wilson>We built the budget based on the hope that that would get passed, and it did.

911
01:53:26.317 --> 01:53:31.792
<v Keith Wilson>And so we pulled all the general fund into— all the general fund out of Transportation into the general fund to distribute.

912
01:53:32.180 --> 01:53:33.717
<v Keith Wilson>Arts and entertainment is different though.

913
01:53:35.094 --> 01:53:35.287
<v Keith Wilson>Do they—.

914
01:53:35.595 --> 01:53:43.145
<v Keith Wilson>Donnie, I'm gonna turn to you as far as what revenue-generating opportunity they have, but they are a general fund bureau or program.

915
01:53:44.481 --> 01:53:46.069
<v Sameer Kanal>It was the arts tax is the question.

916
01:53:46.409 --> 01:53:47.042
<v Keith Wilson>Oh, I'm so sorry.

917
01:53:47.463 --> 01:53:50.041
<v Sameer Kanal>Well, related, the rest of it I imagine is the arts tax.

918
01:53:50.088 --> 01:53:50.381
<v Sameer Kanal>Is that—.

919
01:53:51.061 --> 01:53:56.273
<v Cherity Montez>If I could answer the question, part of it is the arts tax and part of it is the Percent for Art Fund.

920
01:53:56.600 --> 01:54:14.717
<v Cherity Montez>And both of those are very so the arts tax funds that come into our office can only be used for arts education coordination, which covers our arts education program manager and coordination work with all of the 6 school districts and oversight of our— of the Arts Access Fund Oversight Committee.

921
01:54:15.712 --> 01:54:22.863
<v Cherity Montez>And then grantmaking out cash that goes out to arts organizations per the code.

922
01:54:23.489 --> 01:54:27.118
<v Cherity Montez>And then the other piece is the other piece is just for Percent for Art projects.

923
01:54:27.167 --> 01:54:37.282
<v Cherity Montez>So those are required by the Percent for Art code and in capital improvement projects with our Infrastructure Bureau partners.

924
01:54:37.555 --> 01:54:44.694
<v Cherity Montez>And those are often over many years because they're— it's things like the North Portland Aquatic Center, which is going to take a couple of years to build.

925
01:54:44.743 --> 01:54:51.337
<v Cherity Montez>And that would have, you know, that has Percent for Art funds that are shown in those other funds, but we can't use that for anything else.

926
01:54:51.386 --> 01:54:51.435
<v Cherity Montez>Okay.

927
01:54:55.619 --> 01:54:57.460
<v Sameer Kanal>Okay, thanks.

928
01:54:57.460 --> 01:55:01.470
<v Sameer Kanal>Slide 34, there was a question about how this comms person is funded.

929
01:55:01.619 --> 01:55:03.439
<v Sameer Kanal>That didn't make sense to me.

930
01:55:03.439 --> 01:55:07.439
<v Sameer Kanal>Is it funded now out of general fund or levy dollars?

931
01:55:07.439 --> 01:55:09.039
<v Meg McElroy>It's funded currently out of levy dollars.

932
01:55:09.039 --> 01:55:11.640
<v Sameer Kanal>And that'll remain either way regardless of where it lives?

933
01:55:11.640 --> 01:55:13.739
<v Meg McElroy>My understanding is no.

934
01:55:13.840 --> 01:55:17.960
<v Meg McElroy>In the realignment, the amount that had been budgeted for that position was moved to the general fund.

935
01:55:18.421 --> 01:55:22.060
<v Meg McElroy>The amount we spent or are spending, for example, in this current fiscal year—.

936
01:55:22.347 --> 01:55:23.871
<v Sameer Kanal>I just, I just need a yes or no.

937
01:55:23.951 --> 01:55:24.944
<v Sameer Kanal>I'm sorry, I'm running out of time.

938
01:55:25.313 --> 01:55:26.610
<v Sameer Kanal>I, I just need a yes or no.

939
01:55:26.835 --> 01:55:28.854
<v Meg McElroy>The levy is not being asked to pay for it for next year.

940
01:55:29.158 --> 01:55:29.479
<v Sameer Kanal>Thank you.

941
01:55:30.184 --> 01:55:39.846
<v Sameer Kanal>Um, okay, with relation to visitor activation portion of spectator venues, um, because I don't want to get into too deep into MoDA, that's a whole— if there's time, I'll come back to it.

942
01:55:39.895 --> 01:55:44.269
<v Sameer Kanal>But, um, the lease goes till 2032 in Providence Park, is that accurate?

943
01:55:44.863 --> 01:55:46.083
<v Donnie Oliveira>I believe 36, Councilor.

944
01:55:46.229 --> 01:55:46.952
<v Sameer Kanal>36, Thanks.

945
01:55:47.578 --> 01:55:50.036
<v Sameer Kanal>What is the condition of naming rights for P5 right now?

946
01:55:50.244 --> 01:55:53.345
<v Sameer Kanal>Are we able to talk about reselling and renaming those venues?

947
01:55:54.100 --> 01:55:54.759
<v Donnie Oliveira>Thanks for the question.

948
01:55:54.806 --> 01:56:00.911
<v Donnie Oliveira>So for specifically for the Portland 5 venues, as a reminder, they're still under the operational management of Metro.

949
01:56:01.393 --> 01:56:01.552
<v Donnie Oliveira>Yeah.

950
01:56:01.793 --> 01:56:12.106
<v Donnie Oliveira>And we'll working on the process to on July 1st, 2027 to take that responsibility back over, whether directly or through a third-party management company.

951
01:56:12.636 --> 01:56:18.806
<v Donnie Oliveira>And we'll be able to contemplate those sorts of like interventions around naming rights for those venues at that time.

952
01:56:19.225 --> 01:56:19.481
<v Sameer Kanal>Thanks.

953
01:56:19.707 --> 01:56:22.582
<v Sameer Kanal>I know we've had a conversation about Providence Park breaking even or not.

954
01:56:23.417 --> 01:56:25.475
<v Sameer Kanal>Does VMC also have the same conditions?

955
01:56:25.667 --> 01:56:31.693
<v Sameer Kanal>Is Veterans Memorial Coliseum, is it also breaking even or is it subsidizing others or being subsidized by that ticket fund?

956
01:56:31.934 --> 01:56:33.346
<v Donnie Oliveira>Great question, Councilor.

957
01:56:33.539 --> 01:56:36.238
<v Donnie Oliveira>VMC is part of the RIP City management oversight of the Rose Quarter.

958
01:56:36.287 --> 01:56:38.585
<v Donnie Oliveira>So it's part of the Rose Quarter blend, including the Moda Center.

959
01:56:39.338 --> 01:56:47.229
<v Donnie Oliveira>But generally speaking, the VMC, it's part of Rose Quarter, is breaking even from an operational perspective.

960
01:56:47.666 --> 01:56:49.252
<v Sameer Kanal>Okay, but it's lumped in together in one—.

961
01:56:49.430 --> 01:56:49.737
<v Donnie Oliveira>As one.

962
01:56:50.319 --> 01:56:54.291
<v Donnie Oliveira>All the funds, excuse me, all the revenues go into one fund, spectator fund.

963
01:56:54.645 --> 01:56:58.770
<v Sameer Kanal>Okay, and then the other last question I think I have time for here, I actually have 2.

964
01:56:59.560 --> 01:57:00.572
<v Sameer Kanal>Does the program oversee PIR?

965
01:57:01.538 --> 01:57:02.439
<v Sameer Kanal>Just a yes or no on that.

966
01:57:02.488 --> 01:57:03.587
<v Sameer Kanal>Is PIR part of this too?

967
01:57:03.734 --> 01:57:03.881
<v Sameer Kanal>No.

968
01:57:06.661 --> 01:57:14.615
<v Sameer Kanal>Is there more you can give us later in terms of the program offer side for what that program does with relation to the non-spectator venue side?

969
01:57:14.680 --> 01:57:17.149
<v Sameer Kanal>Because the spectator venues and visitor activation—.

970
01:57:17.358 --> 01:57:17.470
<v Donnie Oliveira>Yes.

971
01:57:18.144 --> 01:57:20.309
<v Sameer Kanal>Okay, because that's a piece that I think has gotten lost.

972
01:57:20.565 --> 01:57:21.287
<v Sameer Kanal>I'll get back in the queue.

973
01:57:21.416 --> 01:57:21.671
<v Sameer Kanal>Thanks.

974
01:57:21.815 --> 01:57:22.586
<v Jamie Dunphy>Thank you, Councilor Kanal.

975
01:57:22.859 --> 01:57:23.900
<v Jamie Dunphy>Councilor Ryan.

976
01:57:23.981 --> 01:57:27.012
<v Dan Ryan>Thank you, President Dunphy, and good morning everyone.

977
01:57:27.269 --> 01:57:28.648
<v Dan Ryan>Thank you, esteemed panel.

978
01:57:28.729 --> 01:57:29.914
<v Dan Ryan>Thank you, Donnie Oliveira, for being here.

979
01:57:29.979 --> 01:57:31.442
<v Dan Ryan>Thank you for being so candid this morning.

980
01:57:31.490 --> 01:57:32.270
<v Dan Ryan>I really appreciate it.

981
01:57:32.676 --> 01:57:36.365
<v Dan Ryan>You've been up here a lot this week, so I wanted to acknowledge that.

982
01:57:37.551 --> 01:57:39.059
<v Dan Ryan>It's always good to see you, Charity.

983
01:57:39.805 --> 01:57:46.078
<v Dan Ryan>I have a big picture question to start off 'cause I've been on a theme about where we were 10 years ago with FTEs.

984
01:57:46.305 --> 01:57:50.280
<v Dan Ryan>And so it says we have 130.45.

985
01:57:50.752 --> 01:57:53.039
<v Dan Ryan>I don't think I've seen a 45 very often in my life.

986
01:57:54.332 --> 01:57:55.778
<v Dan Ryan>And now, where were we in 2010?

987
01:57:55.845 --> 01:57:56.282
<v Dan Ryan>130.

988
01:57:56.746 --> 01:57:59.694
<v Dan Ryan>15-16 Says 99.12.

989
01:58:00.126 --> 01:58:03.635
<v Dan Ryan>So I guess there's always some fascinating numbers after the decimal.

990
01:58:04.355 --> 01:58:10.268
<v Dan Ryan>Does that include PCEF, the current number of 130.5 acres?

991
01:58:10.380 --> 01:58:11.757
<v Dan Ryan>Is that a BPS question?

992
01:58:12.462 --> 01:58:12.703
<v Dan Ryan>Pardon me?

993
01:58:13.007 --> 01:58:14.081
<v Eric Engstrom>Are you asking about BPS?

994
01:58:14.865 --> 01:58:16.900
<v Dan Ryan>I'm asking about the entire work area.

995
01:58:17.989 --> 01:58:18.726
<v Dan Ryan>No, no, BPS.

996
01:58:18.791 --> 01:58:19.625
<v Dan Ryan>Sorry, I meant BPS.

997
01:58:19.672 --> 01:58:20.185
<v Dan Ryan>Sorry about that.

998
01:58:20.537 --> 01:58:23.261
<v Eric Engstrom>Yeah, 10 years ago that would not include PCEF.

999
01:58:23.518 --> 01:58:24.527
<v Eric Engstrom>The current number would.

1000
01:58:24.863 --> 01:58:25.087
<v Dan Ryan>It does.

1001
01:58:25.680 --> 01:58:26.096
<v Dan Ryan>Okay.

1002
01:58:26.787 --> 01:58:32.390
<v Dan Ryan>You could send me an email that just shows what it would look like without PSF in the 10-year comparison.

1003
01:58:32.743 --> 01:58:32.936
<v Eric Engstrom>Yes.

1004
01:58:33.064 --> 01:58:33.899
<v Dan Ryan>Or you could tell me right now.

1005
01:58:34.189 --> 01:58:38.300
<v Eric Engstrom>Yeah, we've actually been working on that based on yesterday's conversation, so we'll get that to you.

1006
01:58:38.444 --> 01:58:39.103
<v Dan Ryan>Okay, thank you.

1007
01:58:39.247 --> 01:58:41.286
<v Dan Ryan>I know that we've been asking those questions.

1008
01:58:41.335 --> 01:58:42.056
<v Dan Ryan>I appreciate it.

1009
01:58:43.261 --> 01:58:51.578
<v Dan Ryan>I wanna acknowledge that the P5, so that when we were talking about spectator venues, that was clear, but P5 is now in the Arts Office, correct?

1010
01:58:53.521 --> 01:58:58.145
<v Donnie Oliveira>Councilor, that's the current plan is we're still working on the machinations of it, but yes.

1011
01:58:58.819 --> 01:59:08.502
<v Dan Ryan>Okay, and I think it's important to just make sure we're all listening to that because Metro and MERC have been operating P5 even though it's a city asset.

1012
01:59:09.529 --> 01:59:23.076
<v Dan Ryan>So I think it's been a slow journey to try to get the operations to the city for P5, and it does make sense of course, I think to eliminate some of the bureaucratic clutter at the top when it's an asset of ours.

1013
01:59:23.789 --> 01:59:30.908
<v Dan Ryan>So since we're stuck with the responsibility on our general ledger, gee, maybe we should also have some more control over the operations.

1014
01:59:32.149 --> 01:59:36.154
<v Dan Ryan>Who, if that's moving to Arts Office, what's the— that journey's been going on a while.

1015
01:59:36.219 --> 01:59:37.494
<v Dan Ryan>Can you tell me the timeline now?

1016
01:59:38.341 --> 01:59:39.251
<v Dan Ryan>Anyone, please?

1017
01:59:41.346 --> 01:59:42.288
<v Cherity Montez>Thank you for the question.

1018
01:59:42.564 --> 01:59:49.167
<v Cherity Montez>We have 419 days until till Metro no longer manages the venues.

1019
01:59:49.425 --> 01:59:50.807
<v Cherity Montez>And so—.

1020
01:59:51.693 --> 01:59:53.109
<v Dan Ryan>No, that was a great answer actually.

1021
01:59:53.608 --> 01:59:54.878
<v Dan Ryan>I think I got enough information.

1022
01:59:55.631 --> 02:00:01.605
<v Dan Ryan>And which committee would be looking at, let's say City Life would like to be updated on that journey, okay?

1023
02:00:02.091 --> 02:00:02.591
<v Dan Ryan>Absolutely.

1024
02:00:02.655 --> 02:00:04.125
<v Dan Ryan>Does that make sense, Chair?

1025
02:00:04.760 --> 02:00:06.604
<v Elana Pirtle-Guiney>I'm happy to make sure we have time for that, yes.

1026
02:00:06.653 --> 02:00:06.996
<v Dan Ryan>Thank you.

1027
02:00:07.567 --> 02:00:08.171
<v Dan Ryan>It's a big deal.

1028
02:00:09.876 --> 02:00:14.899
<v Dan Ryan>Now moving along, The events conversation's fascinating to me.

1029
02:00:14.947 --> 02:00:20.666
<v Dan Ryan>I'm looking at both you, Cornell, and Charity, because I was here in 2021 when no one was downtown.

1030
02:00:20.890 --> 02:00:22.689
<v Dan Ryan>I mean, it was really sad.

1031
02:00:24.007 --> 02:00:26.466
<v Dan Ryan>And we wanted to ignite foot traffic.

1032
02:00:26.770 --> 02:00:28.569
<v Dan Ryan>So there was a push to get events.

1033
02:00:29.068 --> 02:00:31.671
<v Dan Ryan>And we had events in Mart's office.

1034
02:00:31.734 --> 02:00:33.020
<v Dan Ryan>We had events at Prosper.

1035
02:00:33.726 --> 02:00:35.398
<v Dan Ryan>You could say we had a lot of events.

1036
02:00:35.493 --> 02:00:38.208
<v Dan Ryan>Sometimes there were more staff at the events than people.

1037
02:00:39.243 --> 02:00:43.228
<v Dan Ryan>But we spent a lot of money to try to get energy back downtown, especially.

1038
02:00:43.743 --> 02:00:57.288
<v Dan Ryan>When you made the decisions to eliminate some of this, did your 2 offices work together to look at where I do think there was some overlap and how we could make sure that we're having the best impact with this decision?

1039
02:01:00.279 --> 02:01:03.927
<v Cornell Wesley>I would say the entire service area has worked collaboratively in this exercise.

1040
02:01:06.948 --> 02:01:08.536
<v Dan Ryan>I hope that you continue to do that.

1041
02:01:08.615 --> 02:01:14.725
<v Dan Ryan>I just think that we sometimes do high or somewhat high visibility with little impact with some of those events.

1042
02:01:14.886 --> 02:01:18.207
<v Dan Ryan>As in my career, I couldn't wait to not be a special events person anymore.

1043
02:01:18.880 --> 02:01:26.914
<v Dan Ryan>And I've done a lot of work to try to get development departments, if you will, to not do so many events 'cause they are a lot of work and not a lot of impact.

1044
02:01:27.380 --> 02:01:32.307
<v Dan Ryan>And so I'm hoping that we continue to look and study what that impact looks like.

1045
02:01:32.631 --> 02:01:37.448
<v Dan Ryan>Are the retail outlets around those areas getting more— are they getting more sales on those days?

1046
02:01:37.949 --> 02:01:39.701
<v Dan Ryan>With the big events, I don't question that.

1047
02:01:39.974 --> 02:01:41.146
<v Dan Ryan>I hear that from Nordstrom's.

1048
02:01:41.194 --> 02:01:46.672
<v Dan Ryan>The night we have a concert at Pioneer Square, that's one of their best days of the week for sure.

1049
02:01:47.154 --> 02:01:49.608
<v Dan Ryan>So I think we have ways to figure that out.

1050
02:01:49.947 --> 02:01:55.796
<v Dan Ryan>And I'm kind of looking then to you, Cornell, to say that I just keep wanting to hear what are the big rocks you're pushing up the hill.

1051
02:01:55.844 --> 02:01:55.925
<v Dan Ryan>Yeah.

1052
02:01:56.498 --> 02:01:59.604
<v Dan Ryan>And how the heck are you going to do that when you have all this stuff to do?

1053
02:02:00.315 --> 02:02:14.314
<v Dan Ryan>And so when I think of OMSI corridor, when I think of the OMSI district, when I think of the Broadway corridor, when I think of Montgomery, those ones that we've been working on for now up to a decade, who's working on those projects that prosper when I look at your chart?

1054
02:02:15.880 --> 02:02:15.944
<v Raymond C. Lee>Yes.

1055
02:02:15.993 --> 02:02:30.350
<v Cornell Wesley>So uniquely, you know, we have several different lanes that prosper that are led by our amazing we have an executive team, and so what you're speaking about is development investment, which is currently being led by Amy Nagy, who's our interim director.

1056
02:02:30.912 --> 02:02:38.733
<v Cornell Wesley>But then she has amazing support right underneath her as well, names like Sarah Harpole, who are, you know, everything you want to know about Broadway Corridor.

1057
02:02:39.279 --> 02:02:41.814
<v Cornell Wesley>So we're well positioned and thoroughly immersed in the work.

1058
02:02:41.975 --> 02:02:43.389
<v Cornell Wesley>Obviously, we're doing more with less.

1059
02:02:44.545 --> 02:02:47.082
<v Cornell Wesley>So yes, you're right, we have to walk and chew bubble gum at the same time.

1060
02:02:47.130 --> 02:02:47.306
<v Cornell Wesley>Thank you.

1061
02:02:47.853 --> 02:02:51.465
<v Dan Ryan>Yeah, and I think part of that exercise is knowing what we don't need to do anymore.

1062
02:02:51.706 --> 02:02:51.850
<v Dan Ryan>Yes, sir.

1063
02:02:51.947 --> 02:02:56.957
<v Dan Ryan>And because I think this is high yield and I don't think the city can move forward without that focus.

1064
02:02:58.193 --> 02:03:03.940
<v Dan Ryan>On PSF, I'll just have a question, and that is we've had some hard conversations about PSF.

1065
02:03:04.054 --> 02:03:06.172
<v Dan Ryan>I really appreciate what Director Oliveira said.

1066
02:03:06.221 --> 02:03:17.057
<v Dan Ryan>I've experienced everyone weighing in very loudly, and I've also experienced the journey from should we invest in our bureaus when they're having impact for green infrastructure?

1067
02:03:17.475 --> 02:03:19.738
<v Dan Ryan>I was really comfortable with that, supportive of that.

1068
02:03:19.801 --> 02:03:23.140
<v Dan Ryan>That was the journey from just doing nonprofits to looking at bureaus.

1069
02:03:23.573 --> 02:03:32.769
<v Dan Ryan>Then we had the conversation about, will we do investments for construction for high-energy projects, high energy efficiency for schools?

1070
02:03:32.962 --> 02:03:35.609
<v Dan Ryan>Not in our portfolio, not a part of our general assets.

1071
02:03:35.770 --> 02:03:36.829
<v Dan Ryan>But I got there.

1072
02:03:37.135 --> 02:03:40.167
<v Dan Ryan>Pretty easy for me to get there being a schools advocate my thank you.

1073
02:03:40.681 --> 02:03:52.979
<v Dan Ryan>So I do question why we're being so resistant to the honest conversation that we can have about our premier asset in the activation of sport in our region.

1074
02:03:53.172 --> 02:04:05.279
<v Dan Ryan>That would be the Moda Center, which we have an opportunity to use PSF Large S eventually to invest in that facility that would make it the premier green efficiency facility in the country.

1075
02:04:05.952 --> 02:04:07.922
<v Dan Ryan>Facility in the association.

1076
02:04:08.034 --> 02:04:15.054
<v Dan Ryan>So I think that if we're not going to consider that, then we probably have to stop considering giving investments to schools.

1077
02:04:15.903 --> 02:04:18.002
<v Dan Ryan>So let's know that that is in our asset.

1078
02:04:18.179 --> 02:04:18.868
<v Dan Ryan>That's a portfolio.

1079
02:04:18.931 --> 02:04:20.054
<v Dan Ryan>That's in our portfolio.

1080
02:04:20.597 --> 02:04:33.788
<v Dan Ryan>So I hope that when we have the conversation of how we use PSF assets, that we look at it holistically, that we look at the journey that we've already been through, and if in fact it's okay to do it, because we own it, that we own that.

1081
02:04:34.112 --> 02:04:36.731
<v Dan Ryan>The person who just bought the franchise does not own that.

1082
02:04:37.248 --> 02:04:39.140
<v Dan Ryan>The city owns the Moda Center.

1083
02:04:40.372 --> 02:04:40.550
<v Angelita Morillo>Thanks.

1084
02:04:40.775 --> 02:04:41.568
<v Jamie Dunphy>Thank you, Councilor Ryan.

1085
02:04:41.680 --> 02:04:42.310
<v Jamie Dunphy>Councilor Novick.

1086
02:04:44.331 --> 02:04:46.399
<v Steve Novick>Yes, I just wanted to go back to the issue of graffiti.

1087
02:04:48.337 --> 02:04:52.208
<v Steve Novick>Councilor Morillo was saying, are we just removing graffiti that pops back up the next week?

1088
02:04:52.289 --> 02:04:56.048
<v Steve Novick>And I'm just curious, how are decisions made about what graffiti to remove?

1089
02:04:56.096 --> 02:05:02.037
<v Steve Novick>Because what's happening is the city's going around seeing graffiti and saying to the building owner, Hey, you want us to remove that graffiti?

1090
02:05:02.135 --> 02:05:06.786
<v Steve Novick>And the building owner says, sure, it'll just come back next week, but knock yourself out.

1091
02:05:06.833 --> 02:05:07.708
<v Steve Novick>No skin off my nose.

1092
02:05:07.757 --> 02:05:08.454
<v Steve Novick>That is wasteful.

1093
02:05:08.939 --> 02:05:12.801
<v Steve Novick>But if we're being asked to remove graffiti, that's a bit different.

1094
02:05:12.850 --> 02:05:14.537
<v Steve Novick>So I'm just curious, how are those decisions made?

1095
02:05:15.680 --> 02:05:23.103
<v Eric Engstrom>We take in reports of graffiti and we reach out to those businesses.

1096
02:05:23.216 --> 02:05:35.695
<v Eric Engstrom>And again, I'll remind you that the BPS money in graffiti is primarily focused on In addition to the small amount we spend on staff, on the remediation on the small business side.

1097
02:05:35.743 --> 02:05:38.731
<v Eric Engstrom>So businesses under a certain number of employees are eligible.

1098
02:05:39.293 --> 02:05:43.889
<v Eric Engstrom>When we hear of a graffiti report, we offer that funding to eligible businesses.

1099
02:05:44.194 --> 02:05:46.506
<v Eric Engstrom>They usually take us up on it for the reasons you stated.

1100
02:05:47.405 --> 02:06:06.710
<v Eric Engstrom>And I'll just reiterate that a lot of our staff time is spent actually on the coordination of the data that we generate from all this and the coordination with So if a business did say, yeah, sure, knock yourself out, but it won't make any difference, then we probably wouldn't do it.

1101
02:06:08.569 --> 02:06:18.140
<v Eric Engstrom>Again, I think we have observed, and I can get you follow-up on this, but we have observed that there is some deterrent effect on cleaning it up.

1102
02:06:18.850 --> 02:06:20.109
<v Dan Ryan>Okay.

1103
02:06:20.109 --> 02:06:24.949
<v Steve Novick>No, but I'm just asking if this is something we're forcing on the businesses or whether the businesses are willing they're to do it.

1104
02:06:24.949 --> 02:06:25.069
<v Donnie Oliveira>I think it's a voluntary thing.

1105
02:06:26.036 --> 02:06:26.951
<v Eric Engstrom>Generally welcoming.

1106
02:06:26.998 --> 02:06:28.059
<v Eric Engstrom>We're not forcing it on them.

1107
02:06:28.106 --> 02:06:31.350
<v Eric Engstrom>If they say no, they're still responsible to clean it up.

1108
02:06:32.362 --> 02:06:34.867
<v Eric Engstrom>It is a— there's a code requirement to clean it up.

1109
02:06:35.027 --> 02:06:37.645
<v Eric Engstrom>And so we're approaching them from that perspective.

1110
02:06:37.837 --> 02:06:38.158
<v Cherity Montez>Okay.

1111
02:06:38.801 --> 02:06:39.105
<v Steve Novick>Thank you.

1112
02:06:39.346 --> 02:06:40.421
<v Jamie Dunphy>Thank you, Councilor Novick.

1113
02:06:40.711 --> 02:06:41.337
<v Jamie Dunphy>Councilor Zimmerman.

1114
02:06:42.654 --> 02:06:44.034
<v Eric Zimmerman>Hey, I'm staying on the same topic.

1115
02:06:44.180 --> 02:06:48.563
<v Eric Zimmerman>I was actually going to be very complimentary and thank you, Mayor, for including a graffiti abatement budget.

1116
02:06:48.836 --> 02:07:07.203
<v Eric Zimmerman>You know, for those of us that have worked in it, I'll say from a world of where the city has a lot of authority to tell private property owners you must clean up your graffiti, this may be one of the most work-with-the-owner programs I've ever experienced.

1117
02:07:07.269 --> 02:07:09.774
<v Eric Zimmerman>And I think that the way that that work happens is really good.

1118
02:07:09.838 --> 02:07:17.193
<v Eric Zimmerman>So if you're unaware, this budget helps with things like the community groups who want graffiti abatement kits.

1119
02:07:17.292 --> 02:07:17.506
<v Eric Zimmerman>Yes.

1120
02:07:17.893 --> 02:07:29.543
<v Eric Zimmerman>And they exist all over the neighborhoods, by the way, particularly in your small business districts, the little micro downtowns where the community has asked and Portland has funded the abatement kits.

1121
02:07:31.319 --> 02:07:41.417
<v Eric Zimmerman>And in every situation I've ever worked in, the business owners have said, thank you for helping me get ahead of this because it is a huge cost.

1122
02:07:41.627 --> 02:07:47.788
<v Eric Zimmerman>It is a huge distraction, and I know I'm out of code compliance when I get tagged all the time.

1123
02:07:48.752 --> 02:07:55.204
<v Eric Zimmerman>And an interesting thing about the graffiti industry is that, you know, this is why we do so many murals, right?

1124
02:07:55.252 --> 02:07:58.689
<v Eric Zimmerman>There's a code within that culture, if you will.

1125
02:07:59.283 --> 02:08:10.600
<v Eric Zimmerman>But I just want to— it is easy to cut dollars like this, Mayor, and you did not because it gets straight to the livability, it gets straight to small business support, it gets straight to neighborhood enhancements.

1126
02:08:10.761 --> 02:08:13.136
<v Eric Zimmerman>And I am just very glad you kept it in your budget.

1127
02:08:13.185 --> 02:08:13.345
<v Eric Zimmerman>So thank you.

1128
02:08:13.408 --> 02:08:13.875
<v Eric Zimmerman>Thank you.

1129
02:08:14.355 --> 02:08:17.353
<v Eric Zimmerman>And Eric, for your team who administers it, also very good.

1130
02:08:17.962 --> 02:08:23.154
<v Eric Zimmerman>I did want to— our timing today is so funny, so we're all trying to get things in quickly.

1131
02:08:23.202 --> 02:08:42.528
<v Eric Zimmerman>It makes us a little bit more abrasive or abrupt, but I did want to really appreciate the work that is continuing on the design reform packages that we have and the briefing that your team gave to me on a one-on-one in my office, just in terms of the history of and what design review's intent is and how it goes forward.

1132
02:08:43.157 --> 02:08:46.546
<v Eric Zimmerman>If anybody wants to know how to brief me, that was the standard.

1133
02:08:46.609 --> 02:08:48.385
<v Eric Zimmerman>That was the gold standard, and it was very appreciated.

1134
02:08:49.279 --> 02:08:50.377
<v Eric Zimmerman>And so thank you for that.

1135
02:08:50.442 --> 02:08:58.176
<v Eric Zimmerman>I know the work is continuing forward as your bureau tackles a lot of what Portland's future will look like.

1136
02:08:59.000 --> 02:09:04.529
<v Eric Zimmerman>Again, Mayor, I want to compliment you for keeping the downtown initiative alive and well.

1137
02:09:05.127 --> 02:09:05.304
<v Eric Zimmerman>Right.

1138
02:09:05.432 --> 02:09:07.082
<v Eric Zimmerman>I think thank you.

1139
02:09:07.244 --> 02:09:30.585
<v Eric Zimmerman>I think that we can thread this needle of individual support in small business as well as the large economic impact, knowing that certain areas, the ROI affects and helps us enable programs across all neighborhoods, all districts, and downtown serves as one of those for us to pay for a lot of things across the entire city.

1140
02:09:30.649 --> 02:09:31.818
<v Eric Zimmerman>So I want to give you compliments, Mayor.

1141
02:09:32.025 --> 02:09:37.867
<v Eric Zimmerman>For keeping an eye in a tough budget on— it can't all be about belt tightening.

1142
02:09:38.283 --> 02:09:45.279
<v Eric Zimmerman>It does have to be about enabling the market, the public, the private sector, the neighborhoods, others to go forth and conquer.

1143
02:09:45.664 --> 02:09:50.430
<v Eric Zimmerman>And I think that's a lot of our job, and I see you threading that needle in this, so I want to commend you for that.

1144
02:09:51.842 --> 02:09:56.046
<v Eric Zimmerman>You know, this is, this is an area where we have a lot to be thankful for.

1145
02:09:56.110 --> 02:09:59.704
<v Eric Zimmerman>We have a lot to be thankful for in terms of what the arts program puts into our community.

1146
02:10:00.297 --> 02:10:11.541
<v Eric Zimmerman>What it keeps bolstered, what our children's program is able to enable that, as Councilor Dunphy says, and I have now completely stolen, the 3 o'clock to 8 o'clock timeframe is one that it just matters a lot.

1147
02:10:12.095 --> 02:10:15.614
<v Eric Zimmerman>And when I look at the programs out of the children's levy, I see that enhancement.

1148
02:10:16.453 --> 02:10:25.979
<v Eric Zimmerman>So not an easy budget, a lot of confusing stuff in terms of documents, but in the explaining and going through it, we're in a change year.

1149
02:10:26.029 --> 02:10:26.220
<v Eric Zimmerman>We're in a—.

1150
02:10:26.220 --> 02:10:26.703
<v Eric Zimmerman>2024.

1151
02:10:27.590 --> 02:10:28.298
<v Eric Zimmerman>Consolidation year.

1152
02:10:29.636 --> 02:10:31.649
<v Eric Zimmerman>Some of those are general funds, some are not.

1153
02:10:31.795 --> 02:10:34.115
<v Eric Zimmerman>I appreciate working through those details.

1154
02:10:35.720 --> 02:10:48.868
<v Eric Zimmerman>I think that you have successfully talked about consolidation, not just as— for whatever reason, there's a little bit of this idea that consolidation or centralization has to do only with budget cuts, and therefore if you're not a general fund bureau, you're immune to it.

1155
02:10:48.917 --> 02:10:50.305
<v Eric Zimmerman>And that's just simply not the case.

1156
02:10:50.368 --> 02:10:54.202
<v Eric Zimmerman>And I think that this service area has done a good job of kind of showing the direction.

1157
02:10:54.270 --> 02:10:54.390
<v Eric Zimmerman>Thank you.

1158
02:10:54.489 --> 02:11:01.572
<v Eric Zimmerman>You know, good, bad, or indifferent, but you have an idea where you want to go and you're requesting the funds to do that.

1159
02:11:01.733 --> 02:11:03.847
<v Eric Zimmerman>And so you'll have my support in that.

1160
02:11:03.975 --> 02:11:19.583
<v Eric Zimmerman>And then I'll reiterate that I'll work with you a little bit to see what the last couple percentage points or tenths of percentage points exist to help us make sure that the tree code movement is finalized and brought healthy forward so that that team has what they need to do our job.

1161
02:11:19.631 --> 02:11:19.889
<v Eric Zimmerman>Thanks, everybody.

1162
02:11:19.984 --> 02:11:20.225
<v Eric Zimmerman>Thank you.

1163
02:11:21.284 --> 02:11:22.055
<v Jamie Dunphy>Thank you, Councilor Zimmerman.

1164
02:11:22.956 --> 02:11:24.127
<v Jamie Dunphy>Um, put myself in the queue.

1165
02:11:24.721 --> 02:11:26.328
<v Jamie Dunphy>Um, I have 2 questions for Director Wesley.

1166
02:11:26.810 --> 02:11:30.359
<v Jamie Dunphy>Uh, the first is about, uh, the Office of Small Business grants.

1167
02:11:31.065 --> 02:11:37.426
<v Jamie Dunphy>Um, is it the— my understanding is that the grants right now are, are primarily, if not exclusively, reimbursement only.

1168
02:11:38.212 --> 02:11:40.798
<v Jamie Dunphy>Is that still intended to be the, the model going forward?

1169
02:11:41.425 --> 02:11:41.746
<v Dan Ryan>Yes, sir.

1170
02:11:42.148 --> 02:11:43.368
<v Donnie Oliveira>Got it.

1171
02:11:43.529 --> 02:11:45.230
<v Jamie Dunphy>That's my whole question for that one.

1172
02:11:45.841 --> 02:11:50.912
<v Jamie Dunphy>Uh, my second one is with regard I have a question with regard to the grocery store incentive program.

1173
02:11:51.537 --> 02:11:52.548
<v Jamie Dunphy>I'm very excited about it.

1174
02:11:52.740 --> 02:11:55.243
<v Jamie Dunphy>I mean, you and I have had a number of conversations about it.

1175
02:11:55.628 --> 02:12:00.136
<v Jamie Dunphy>I will continue to talk about Gateway and the perils of getting groceries in East Portland.

1176
02:12:00.296 --> 02:12:00.939
<v Jamie Dunphy>Yes, sir.

1177
02:12:01.099 --> 02:12:10.532
<v Jamie Dunphy>But I was made aware that in 2011, then-Mayor Sam Adams and the then-Portland Development Commission pulled together a workgroup on grocery store incentivization.

1178
02:12:10.965 --> 02:12:17.238
<v Jamie Dunphy>And the outcome of that was that there was nothing that the municipality could do in order to incentivize grocery stores to come to East Portland.

1179
02:12:18.587 --> 02:12:24.351
<v Jamie Dunphy>That was the official report, was that they could not find anything within the power of this to actually incentivize this.

1180
02:12:24.432 --> 02:12:26.456
<v Jamie Dunphy>This is a 2011 report.

1181
02:12:27.259 --> 02:12:32.060
<v Jamie Dunphy>Do we have different information at this point, 15 years later, that we think this program will work?

1182
02:12:32.157 --> 02:12:37.569
<v Jamie Dunphy>Have we talked to grocery stores directly to see if this is the kind of incentive that they actually are looking for?

1183
02:12:38.564 --> 02:12:38.789
<v Sameer Kanal>Yes.

1184
02:12:38.837 --> 02:12:44.088
<v Cornell Wesley>So from a data perspective, I'm going to lean heavy on my lived experience and having crafted incentives.

1185
02:12:44.939 --> 02:12:48.885
<v Cornell Wesley>I've worked in many different roles.

1186
02:12:49.369 --> 02:12:56.520
<v Cornell Wesley>And understanding the industry itself, the thin margins that are embedded within it, slip and falls can make a big deal.

1187
02:12:57.210 --> 02:13:07.210
<v Cornell Wesley>And so when we're thinking about the new model of a grocery store, the shrinking of the square footage, a lot of the days of 150,000 monstrosities are not as efficient.

1188
02:13:07.390 --> 02:13:09.869
<v Cornell Wesley>So you're seeing grocery stores move to 50,000 square feet.

1189
02:13:09.869 --> 02:13:09.909
<v Jamie Dunphy>Thank you.

1190
02:13:10.217 --> 02:13:17.989
<v Cornell Wesley>It takes resources to renovate those spaces to those smaller suites, and that's the role we can play.

1191
02:13:18.054 --> 02:13:25.442
<v Cornell Wesley>That's where we can incentivize that behavior and supercharge them occupying, occupying spaces in a very different way.

1192
02:13:25.506 --> 02:13:28.582
<v Cornell Wesley>So I've seen this, I've done this, it works.

1193
02:13:29.655 --> 02:13:30.826
<v Cornell Wesley>We just got to be ready to deploy.

1194
02:13:31.738 --> 02:13:32.011
<v Candace Avalos>Perfect.

1195
02:13:32.235 --> 02:13:32.940
<v Jamie Dunphy>Thank you very much.

1196
02:13:33.118 --> 02:13:34.046
<v Jamie Dunphy>That's my questions.

1197
02:13:34.640 --> 02:13:35.585
<v Jamie Dunphy>Moving to Councilor Green.

1198
02:13:37.551 --> 02:13:38.498
<v Mitch Green>Thank you, Mr. President.

1199
02:13:38.546 --> 02:13:44.685
<v Mitch Green>I'm back in the queue because I wanted to pick up on this downtown advertising line item.

1200
02:13:45.118 --> 02:13:47.192
<v Mitch Green>And I'm not sure who the correct person to ask.

1201
02:13:47.512 --> 02:13:50.757
<v Mitch Green>Maybe it can be a tag team effort between DCA and Director Wesley.

1202
02:13:50.823 --> 02:13:56.215
<v Mitch Green>But so this is another $200,000 in this budget.

1203
02:13:56.377 --> 02:13:58.364
<v Mitch Green>I don't know that it was there last time.

1204
02:13:58.917 --> 02:13:59.194
<v Mitch Green>It was?

1205
02:13:59.326 --> 02:14:00.546
<v Mitch Green>Okay, so it's a continuation.

1206
02:14:00.627 --> 02:14:01.019
<v Mitch Green>It's been there.

1207
02:14:03.217 --> 02:14:16.537
<v Mitch Green>So my question is, so the Clean and Safe contract that we have with the city that we collect rates on behalf of ratepayers for that ESD outlines that this is a core function of that, of the services they do.

1208
02:14:16.938 --> 02:14:20.725
<v Mitch Green>They describe it as Visit Portland or Visit Downtown.

1209
02:14:20.773 --> 02:14:23.083
<v Mitch Green>So there's, there's an ongoing advertising budget.

1210
02:14:23.131 --> 02:14:34.774
<v Mitch Green>Do we have any metrics on whether or not the spend on that advertising has actually resulted in an incremental uptick in business activity and space activation?

1211
02:14:34.822 --> 02:14:41.823
<v Mitch Green>And I ask that because I don't see that in the annual reports from Downtown Portland Clean and Safe, and I don't see that anywhere in our stuff.

1212
02:14:43.800 --> 02:14:43.880
<v Candace Avalos>So—.

1213
02:14:44.801 --> 02:14:45.981
<v Donnie Oliveira>Councilor, thank you for the question.

1214
02:14:46.742 --> 02:14:48.762
<v Donnie Oliveira>We have asked to get that data for you.

1215
02:14:49.328 --> 02:14:54.247
<v Donnie Oliveira>It was a little cleaner last year when the ESDs were in the service area as well.

1216
02:14:54.297 --> 02:14:55.496
<v Donnie Oliveira>Those have since moved to Portland Solutions.

1217
02:14:55.600 --> 02:15:05.489
<v Donnie Oliveira>It's a little bit more line of sight, but in partnership with Prosper, we can definitely get you the information, both where the money went and how it was spent, and then the outcomes of those investments.

1218
02:15:06.114 --> 02:15:06.724
<v Mitch Green>That would be helpful.

1219
02:15:06.771 --> 02:15:13.585
<v Mitch Green>And I'll just note that there's not a '24-'25 annual report posted to Downtown Clean and Safe's website.

1220
02:15:13.809 --> 02:15:18.234
<v Mitch Green>If that doesn't exist, or if it does exist, they should put it up on the website.

1221
02:15:19.034 --> 02:15:21.855
<v Mitch Green>The other piece is that we did raise rates for that ESD.

1222
02:15:22.722 --> 02:15:24.538
<v Mitch Green>In 2024, I believe it was.

1223
02:15:25.134 --> 02:15:27.078
<v Mitch Green>And that was about 11% increase on the rates.

1224
02:15:27.143 --> 02:15:35.395
<v Mitch Green>And so that had a forecasted increase in revenue of roughly $300,000 for this next fiscal year.

1225
02:15:35.444 --> 02:15:43.644
<v Mitch Green>And so I'm just wondering, why not just pay for this out of the rates that are already collected, that are growing and have expanded?

1226
02:15:45.103 --> 02:15:51.493
<v Mitch Green>And I know it's awkward for you, DC Oliveira, because this is a Portland Solutions thing now, but But, you know, this is— you're presenting it today, so.

1227
02:15:51.702 --> 02:15:53.113
<v Donnie Oliveira>Yeah, no, I appreciate the question.

1228
02:15:53.161 --> 02:15:55.582
<v Donnie Oliveira>Happy to, uh, it's one team working on here.

1229
02:15:55.646 --> 02:16:03.408
<v Donnie Oliveira>So, uh, the, the $200,000, just, just to offer this for just general awareness, it goes a little bit beyond just Downtown Clean and Safe's work.

1230
02:16:03.890 --> 02:16:08.895
<v Donnie Oliveira>Um, there's a lot of investments in some of like the bigger, you know, initiatives and activities in downtown.

1231
02:16:08.958 --> 02:16:14.619
<v Donnie Oliveira>So I think Winter Light Festival or the, the Portland Staycation events that we've been hosting, that was resourced by this.

1232
02:16:14.667 --> 02:16:21.740
<v Donnie Oliveira>So the money is often activating more campaign work, like how do we get, you know, feet on the ground downtown.

1233
02:16:22.582 --> 02:16:31.574
<v Donnie Oliveira>But absolutely got your questions and we'll make sure we get back to you on how those additional revenues are working and how they're distinct from this $200,000 amount.

1234
02:16:32.028 --> 02:16:35.199
<v Mitch Green>I'd appreciate that and the ratepayers of the ESD will appreciate that as well.

1235
02:16:35.409 --> 02:16:35.650
<v Mitch Green>Thanks.

1236
02:16:38.165 --> 02:16:38.875
<v Jamie Dunphy>Thank you, Councilor Green.

1237
02:16:38.970 --> 02:16:41.066
<v Jamie Dunphy>Councilor Kanal.

1238
02:16:41.629 --> 02:16:43.129
<v Sameer Kanal>Thank you, Council President.

1239
02:16:43.273 --> 02:16:43.418
<v Sameer Kanal>Okay.

1240
02:16:45.476 --> 02:16:47.129
<v Sameer Kanal>Just wanted to quickly touch on a few things.

1241
02:16:47.227 --> 02:16:48.847
<v Sameer Kanal>I appreciate Councilor Green's questions too.

1242
02:16:49.394 --> 02:17:07.394
<v Sameer Kanal>As it relates to Councilor Novick, I did want to say that I think councilors having to go through— this is all primarily PCF-related except for the second one— that the hoops that we need to go through to get something even into the CIP conversation are frustrating, but they're fine as long as it applies equally to all electeds, and it hasn't felt that way.

1243
02:17:08.341 --> 02:17:25.614
<v Sameer Kanal>I also think I agree with Councilor Councilor Novick, that if we're asked to commit on any number of dollars for anything outside of what has traditionally been funded after a CIP has been approved, that we have very clear numbers on what is currently funding so that we know what we'd be moving money from and to.

1244
02:17:26.720 --> 02:17:34.515
<v Sameer Kanal>As it relates to Councilor Avalos's question on the realignments, realignment to the service area is something that my experience on the other side of the street thinks is a really good idea.

1245
02:17:34.772 --> 02:17:35.189
<v Sameer Kanal>Thank you.

1246
02:17:35.685 --> 02:17:42.132
<v Sameer Kanal>I don't support realigning all those positions to the central operations side, but to the DCA's office and the service area makes sense.

1247
02:17:42.197 --> 02:17:48.644
<v Sameer Kanal>But having said that, Councilor Avalos's point about not feeling like we're getting the information is accurate to my experience as well.

1248
02:17:49.237 --> 02:17:51.835
<v Sameer Kanal>I think many councilors are not feeling informed and not feeling access.

1249
02:17:51.915 --> 02:17:53.215
<v Sameer Kanal>Let me ask you this to follow.

1250
02:17:53.343 --> 02:17:56.004
<v Sameer Kanal>And by the way, this is not specific in any way to DCA Oliveira.

1251
02:17:56.052 --> 02:17:57.433
<v Sameer Kanal>You just happen to be here today.

1252
02:17:58.074 --> 02:17:59.147
<v Sameer Kanal>Let me ask you this, CA Lee.

1253
02:17:59.597 --> 02:18:04.594
<v Sameer Kanal>There's a news article that shows that a DCA Specifically said in email that communication with council wasn't allowed.

1254
02:18:05.064 --> 02:18:18.976
<v Sameer Kanal>Given what you said to Councilor Avalos, and excluding any potential discipline or personnel issues, focusing on practices or management philosophy, what are you currently doing with relation to the phenomenon of denial of information to council?

1255
02:18:24.504 --> 02:18:33.360
<v Raymond C. Lee>I think in any situation, as we work towards communicating to council, we want to have an open and transparent line of communication as it relates to that information.

1256
02:18:34.418 --> 02:18:48.766
<v Raymond C. Lee>I believe the article, and I haven't read this article that you're referring to completely, is referring to as it relates to budget during the budget timeframe of requesting meetings with directors at that point in time.

1257
02:18:49.504 --> 02:18:59.295
<v Raymond C. Lee>At that point in time, we were still gathering information as it relates to the budget information and what would be potential proposals that would be moving forward in that process.

1258
02:18:59.936 --> 02:19:15.262
<v Raymond C. Lee>And we wanted to hold off on that meeting before we had a full comprehension of what those proposals might be, because bureau heads didn't even know at that point in time what those proposals that may potentially be moving forward in the mayor's proposed budget.

1259
02:19:15.774 --> 02:19:24.778
<v Raymond C. Lee>Now, anytime we have any type of communication of a councilor reaching out, trying to get information, I want to make sure we're getting that information to them.

1260
02:19:25.210 --> 02:19:26.527
<v Raymond C. Lee>And that's the stance that we'll continue to have.

1261
02:19:26.575 --> 02:19:26.686
<v Candace Avalos>Thank you.

1262
02:19:27.615 --> 02:19:27.952
<v Sameer Kanal>Thanks.

1263
02:19:28.016 --> 02:19:30.630
<v Sameer Kanal>So does that mean that that email is no longer in effect right now?

1264
02:19:31.145 --> 02:19:31.240
<v Raymond C. Lee>No.

1265
02:19:32.202 --> 02:19:33.759
<v Sameer Kanal>No, it does not mean that, or it's no longer in effect?

1266
02:19:33.807 --> 02:19:34.609
<v Raymond C. Lee>It's not in effect.

1267
02:19:34.769 --> 02:19:35.090
<v Sameer Kanal>Thank you.

1268
02:19:35.715 --> 02:19:39.114
<v Sameer Kanal>All right, I want to speak to PCF, um, on the interest question.

1269
02:19:39.163 --> 02:19:42.033
<v Sameer Kanal>There's $26.89 million that is being moved.

1270
02:19:42.129 --> 02:19:44.423
<v Sameer Kanal>That's about 10% of the total spend this year.

1271
02:19:44.470 --> 02:19:47.278
<v Sameer Kanal>That's interest that's in the proposed budget going to the general fund.

1272
02:19:47.373 --> 02:19:48.480
<v Sameer Kanal>It's a pretty big chunk.

1273
02:19:49.185 --> 02:19:57.192
<v Sameer Kanal>Um, that's accruing largely because of the The way the CIP is structured and the level of expenditure you have now.

1274
02:19:57.403 --> 02:20:06.778
<v Sameer Kanal>There have been some proposals to change how PCF has what it's able to fund, including putting fairly large, more than 10%, new expenditures on its ledger.

1275
02:20:06.939 --> 02:20:17.879
<v Sameer Kanal>If those happened, is it safe to say— and this is a series of questions, so keep them brief, please— is it safe to say that we wouldn't have money left over to accrue interest if we had a giant new line item put on the PCF budget?

1276
02:20:18.967 --> 02:20:22.319
<v Eric Engstrom>The interest is a function right now of 2 things.

1277
02:20:22.368 --> 02:20:30.933
<v Eric Engstrom>The interest rate is, I think, higher than what we originally forecast when we estimated the total 5-year amount, just because of interest rates being high.

1278
02:20:31.174 --> 02:20:40.862
<v Eric Engstrom>And then our spending rate has a direct impact on interest rates too, in the sense that if we— if our fund balance is higher than we thought it would be, it's generating more interest.

1279
02:20:40.942 --> 02:20:42.724
<v Eric Engstrom>So our interest—.

1280
02:20:42.724 --> 02:20:44.343
<v Eric Engstrom>Spending went up very significantly.

1281
02:20:44.407 --> 02:20:45.370
<v Eric Engstrom>Spending has gone up.

1282
02:20:45.467 --> 02:20:49.399
<v Eric Engstrom>So already has gone up.

1283
02:20:49.609 --> 02:20:57.155
<v Eric Engstrom>And so yes, if you add a big line item in spending, of course that reduces the interest that we might get next year or the year after.

1284
02:20:57.653 --> 02:21:06.692
<v Sameer Kanal>From an accounting perspective, is it safe to say that when a dollar goes to the general fund, we can consider it as being split proportionally among all the things the general fund spends on?

1285
02:21:07.287 --> 02:21:10.948
<v Sameer Kanal>This is probably a Ruth series of questions now that I think about it, or Jonas, sorry.

1286
02:21:18.239 --> 02:21:19.497
<v Eric Engstrom>Yeah, hi, Councilor.

1287
02:21:19.561 --> 02:21:21.722
<v Eric Engstrom>For the record, Jonas Biery, Chief Financial Officer.

1288
02:21:21.885 --> 02:21:29.531
<v Donnie Oliveira>Um, yeah, so when a dollar goes into the general fund, it goes to that general fund, um, and it's not directly allocated necessarily to a specific thing.

1289
02:21:29.967 --> 02:21:35.454
<v Donnie Oliveira>Um, it goes into the bucket, and then the bucket is sort of distributed among all of the things that the general fund pays for.

1290
02:21:35.793 --> 02:21:48.890
<v Sameer Kanal>So from an accounting perspective, If a bureau's getting 1% of the general fund and a dollar is added to the general fund, we can safely say, or a dollar is part of the general fund, can safely assume 1 cent of that went to that bureau?

1291
02:21:49.388 --> 02:21:50.817
<v Dan Ryan>I guess that's a way of looking at it.

1292
02:21:50.865 --> 02:21:54.879
<v Dan Ryan>I don't know if that's the way it's tracked in the accounting of it, but yeah.

1293
02:21:55.024 --> 02:22:02.490
<v Sameer Kanal>And when doing that, is it fair to divide among the whole general fund of $917 million or just the $798 million?

1294
02:22:05.775 --> 02:22:07.996
<v Eric Engstrom>In this case, if we're putting these—.

1295
02:22:08.029 --> 02:22:11.666
<v Donnie Oliveira>If you're talking about the PSF interest that comes in, then it would be applicable to the discretionary.

1296
02:22:11.780 --> 02:22:12.552
<v Sameer Kanal>Discretionary only.

1297
02:22:12.617 --> 02:22:12.778
<v Sameer Kanal>Okay.

1298
02:22:13.503 --> 02:22:18.447
<v Sameer Kanal>So I'm going to just look at these big chunks: parks, police, fire, and shelter.

1299
02:22:19.622 --> 02:22:24.983
<v Sameer Kanal>You know, and of the general fund money, $267 million goes to police, just as an example.

1300
02:22:25.031 --> 02:22:27.691
<v Sameer Kanal>That's 33.5% of the general fund discretionary.

1301
02:22:27.738 --> 02:22:32.308
<v Sameer Kanal>So right now, Given what we just heard, about $9 million of that interest goes to police.

1302
02:22:34.239 --> 02:22:42.354
<v Sameer Kanal>And maybe a better example is fire, which gets about 21% of the general fund discretionary, which means about $6.64 million goes to fire.

1303
02:22:43.308 --> 02:22:53.171
<v Sameer Kanal>And I'm bringing that up to state that in the hypothetical where we added a large new expenditure to PCF's budget, that would not create that interest going forward.

1304
02:22:53.332 --> 02:23:00.467
<v Sameer Kanal>I wanted to just highlight that that's actually taking $7.8 million away or $6.64 million away.

1305
02:23:00.595 --> 02:23:03.012
<v Sameer Kanal>And I wanted to just walk through the logic of that.

1306
02:23:05.424 --> 02:23:21.574
<v Sameer Kanal>To Councilor Zimmerman's questions earlier, I wanted to just follow up on the PCF conversation and say, I know Councilor Novick expressed this too, I don't think the question around PCF, the budgetary authority is about the members of the committee or about the staff.

1307
02:23:22.326 --> 02:23:32.341
<v Sameer Kanal>I think you're often put in the middle of the sort of frustration there, and I want to just acknowledge that when it relates to people trying to make a change and the question of when you should be involved or not.

1308
02:23:33.335 --> 02:23:48.516
<v Sameer Kanal>I think there's a very, very small fraction— I want to stress a fraction— of the people who are receiving PSF funds that are actually pushing the narrative that council has no role in it and the mayor might not have a role in it because they perhaps think that the committee is more favorable to their work than council or mayor.

1309
02:23:48.565 --> 02:23:48.676
<v Sameer Kanal>Thank you.

1310
02:23:48.902 --> 02:23:52.065
<v Sameer Kanal>Might be, and have come to us and said you have no right to make changes.

1311
02:23:52.112 --> 02:24:00.510
<v Sameer Kanal>And I wanted to appreciate you all for clarifying that this is incorrect and that we have the right and frankly the responsibility to exercise budgetary authority.

1312
02:24:01.007 --> 02:24:05.245
<v Sameer Kanal>Having said that, I also think we have the responsibility to work with community, in particular those community members.

1313
02:24:06.001 --> 02:24:15.328
<v Sameer Kanal>And so the only thing that relates to this conversation on the staffing side is a request to please help us— and I think you've talked about this, DCA Oliveira— please help us be involved at the Mm-hmm.

1314
02:24:15.795 --> 02:24:27.915
<v Sameer Kanal>Because getting a— and this is true for, I think, your entire service area— amendments to a large technical document at the time it comes to us on council is not the best way to go about it.

1315
02:24:28.316 --> 02:24:31.254
<v Sameer Kanal>And this past year, it was the only way we were given to go about it.

1316
02:24:31.384 --> 02:24:31.689
<v Sameer Kanal>Mm-hmm.

1317
02:24:31.914 --> 02:24:58.219
<v Sameer Kanal>And so I think the way to get around the sort of metaphorical timeline posing a gun to everyone's head and the desire to be involved is if— and so my request is if you can help us be involved at the right time for this year, because I think Councilor Novick's point about talking about whether or not transportation should be a greater part, for example, is a worthwhile conversation to have that we're not able to have effectively at the time it comes to us at the end.

1318
02:24:58.332 --> 02:24:58.765
<v Sameer Kanal>Yeah.

1319
02:24:58.814 --> 02:25:04.606
<v Sameer Kanal>And so I, I think similarly, the mayor's request on, um, office-to-residential conversion is another example.

1320
02:25:04.655 --> 02:25:07.929
<v Sameer Kanal>We did not really have time to have a full conversation around that.

1321
02:25:07.977 --> 02:25:14.323
<v Sameer Kanal>And so So the degree to which we have time for that is, I think, the helpful piece of this.

1322
02:25:14.824 --> 02:25:15.388
<v Sameer Kanal>I can go further.

1323
02:25:15.486 --> 02:25:15.873
<v Steve Novick>I'll stop.

1324
02:25:16.115 --> 02:25:16.309
<v Steve Novick>Thanks.

1325
02:25:16.729 --> 02:25:17.829
<v Jamie Dunphy>Thank you, Councilor Kanal.

1326
02:25:18.121 --> 02:25:18.915
<v Jamie Dunphy>Councilor Koyama Lane.

1327
02:25:20.549 --> 02:25:20.906
<v Tiffany Koyama Lane>Thank you.

1328
02:25:22.103 --> 02:25:24.336
<v Tiffany Koyama Lane>A question about the downtown marketing.

1329
02:25:24.854 --> 02:25:31.040
<v Tiffany Koyama Lane>Director Wesley responded that right now there is heavy reliance on downtown for tax dollars, which is true.

1330
02:25:31.137 --> 02:25:33.278
<v Tiffany Koyama Lane>I hear colleagues bring that up often.

1331
02:25:34.002 --> 02:25:38.976
<v Tiffany Koyama Lane>But what I'm not hearing as much about is how we can be moving away from that.

1332
02:25:39.377 --> 02:25:50.929
<v Tiffany Koyama Lane>And I know there's been some work done on planning to redevelop areas like Gateway into an uptown that might reduce our reliance on downtown, and I'm wondering if someone can speak to that.

1333
02:25:51.954 --> 02:25:52.902
<v Cornell Wesley>Absolutely.

1334
02:25:53.431 --> 02:25:57.940
<v Cornell Wesley>You bring up a great example, the efforts that are taking place currently in Gateway.

1335
02:25:58.629 --> 02:26:13.299
<v Cornell Wesley>Currently we have We have, without giving too much away via nondisclosure agreements, but we have some pretty robust interest and a pretty robust pipeline that quite candidly will result in some short-term transactions here, hopefully within the next 12 months.

1336
02:26:13.766 --> 02:26:24.134
<v Cornell Wesley>We're also, as you've heard the mayor talk about the grocery store initiative, we are prepared to unveil with our board support a community health initiative.

1337
02:26:24.947 --> 02:26:32.888
<v Cornell Wesley>Of which will include an additional incentive for grocery store activations, namely identifying the Fred Meyer end gateway.

1338
02:26:33.356 --> 02:26:34.905
<v Cornell Wesley>There's a lot to that.

1339
02:26:34.985 --> 02:26:38.005
<v Cornell Wesley>There's a lot of interest happening currently on the east side.

1340
02:26:38.118 --> 02:26:47.963
<v Cornell Wesley>And so as we are still doing the work that we have to do around the Central Business District, we are leveraging our TIF resources and even our CIP resources to other areas of the city.

1341
02:26:50.469 --> 02:26:51.462
<v Jamie Dunphy>Thank you, Councilor Camille.

1342
02:26:52.167 --> 02:26:53.721
<v Jamie Dunphy>Councilor Murillo.

1343
02:26:54.652 --> 02:26:55.981
<v Angelita Morillo>Thank you, everyone.

1344
02:26:56.254 --> 02:27:02.086
<v Angelita Morillo>Um, I just wanted to quickly go back on the Moda PCF discussion and put this on the table.

1345
02:27:02.840 --> 02:27:09.041
<v Angelita Morillo>The reality is that the decision for the city to purchase the Moda Center for a dollar was done in 2024.

1346
02:27:09.635 --> 02:27:20.518
<v Angelita Morillo>There was only one member of that council, uh, that is here today, and that was a deal that, that was, you know, designed to be a gift to community, that we were going to get to do something.

1347
02:27:21.095 --> 02:27:42.648
<v Angelita Morillo>And it is not lost on me that immediately after that purchase, and now with the new council, after we have been forced to inherit what I think is a very bad deal to maintain an asset that we don't have the money to maintain, now we are getting blackmailed by a billionaire who is threatened— threatening to remove the Blazers if we don't do everything that he asks with regards to that building.

1348
02:27:43.483 --> 02:27:52.808
<v Angelita Morillo>So when we talk about whether or not PSF dollars should be used on an asset that we own, we have to also talk about the history of that deal and why that came to be.

1349
02:27:53.337 --> 02:27:57.311
<v Angelita Morillo>Because this city council body has frankly inherited a lot of bad deals.

1350
02:27:57.745 --> 02:28:03.449
<v Angelita Morillo>We also inherited the 10-year Clean and Safe contract that we cannot change now.

1351
02:28:04.138 --> 02:28:08.945
<v Angelita Morillo>And this history of saying this is going to be a community asset that we are Thank you.

1352
02:28:09.025 --> 02:28:10.533
<v Angelita Morillo>Councilmember Herbold, I think that's a great point.

1353
02:28:10.582 --> 02:28:19.947
<v Angelita Morillo>If we are going to be purchasing for a dollar, that means that we as a council body have a duty then to get as many community benefits out of it as humanly possible if that deal is going to be made.

1354
02:28:20.813 --> 02:28:31.043
<v Angelita Morillo>And the tangential ties to PCF dollars, just because they might use LED lighting or change random upgrades, that could apply to literally any building.

1355
02:28:31.574 --> 02:28:40.568
<v Angelita Morillo>With any building upgrade, any new building that is being constructed now you could argue that technically it is a more clean energy building because it will be more energy efficient.

1356
02:28:41.113 --> 02:28:52.385
<v Angelita Morillo>That is not enough of a metric for us to say that we should be using these dollars for that renovation while we are not funding transit, we're not able to fully fund clean energy housing.

1357
02:28:52.817 --> 02:29:04.088
<v Angelita Morillo>We are making incredibly difficult decisions here at the city about which employees we're laying off, which core services we are cutting, and PSAB already backfills a lot of those bureau projects as well.

1358
02:29:04.345 --> 02:29:05.611
<v Angelita Morillo>Are tied to those programs.

1359
02:29:06.141 --> 02:29:20.045
<v Angelita Morillo>So I just want to be very clear that we are in a very bad deal, and it is not the fault of most people on this council because we did not agree to purchase the Moda Center for a dollar, uh, to now be blackmailed by the billionaire owner of the Blazers.

1360
02:29:20.221 --> 02:29:20.558
<v Angelita Morillo>Thanks.

1361
02:29:21.922 --> 02:29:22.868
<v Jamie Dunphy>Thank you, Councilor Morillo.

1362
02:29:23.429 --> 02:29:24.055
<v Jamie Dunphy>Councilor Ryan.

1363
02:29:24.888 --> 02:29:26.252
<v Dan Ryan>Thank you, President Dunphy.

1364
02:29:27.037 --> 02:29:30.468
<v Dan Ryan>I wanted to loop back because I didn't get to say a few things.

1365
02:29:31.222 --> 02:29:31.863
<v Dan Ryan>Children's Levy.

1366
02:29:32.007 --> 02:29:34.620
<v Dan Ryan>Meg, thank you so much for you and your team's service.

1367
02:29:34.747 --> 02:29:41.942
<v Dan Ryan>You are mandated at 5% admin, which is a discipline that other offices and bureaus don't experience.

1368
02:29:42.039 --> 02:29:44.506
<v Dan Ryan>And so you do so much with, with not much money.

1369
02:29:44.746 --> 02:29:54.763
<v Dan Ryan>So, and also we lost our long esteemed leader Lisa Pellegrino, and I just want to acknowledge and thank you for your extra hours that you put in as the interim.

1370
02:29:55.404 --> 02:29:57.135
<v Dan Ryan>Um, I also think it's great Great.

1371
02:29:57.808 --> 02:29:59.460
<v Dan Ryan>Well, of course, I'm personally attached to this.

1372
02:29:59.590 --> 02:30:02.909
<v Dan Ryan>I advocated hard for the— to go up to age 24.

1373
02:30:03.199 --> 02:30:10.467
<v Dan Ryan>I've been an advocate for that most of my life because it's a fake cutoff at age 18.

1374
02:30:11.140 --> 02:30:12.681
<v Dan Ryan>And we know this from the foster system.

1375
02:30:12.745 --> 02:30:15.360
<v Dan Ryan>We know this from any family that doesn't have resources.

1376
02:30:15.712 --> 02:30:22.257
<v Dan Ryan>And because families with resources definitely are engaged with their children's investments, at least till age 24 is what I've always heard.

1377
02:30:22.514 --> 02:30:32.292
<v Dan Ryan>And when I do think there's opportunity with Cannabis Fund and the workforce funds that are going, like, say, to Portland Youth Builders.

1378
02:30:32.388 --> 02:30:41.765
<v Dan Ryan>There's a way for Children's Levy and Prosper to work together a little bit more on that, especially through the investments that come through cannabis.

1379
02:30:43.066 --> 02:30:48.156
<v Dan Ryan>And a little bit more on that, in my career, I've spent a lot of time in trying to get kids to go into the trades.

1380
02:30:48.220 --> 02:30:48.364
<v Dan Ryan>Thank you.

1381
02:30:48.461 --> 02:30:53.615
<v Dan Ryan>Because our school system, quite frankly, the cultures of schools just forgot about that for a couple decades.

1382
02:30:54.001 --> 02:30:55.510
<v Dan Ryan>And so we're trying to bring that back.

1383
02:30:55.992 --> 02:31:01.323
<v Dan Ryan>And the biggest hurdles— this is from people in the industry— were math and weed.

1384
02:31:01.884 --> 02:31:10.314
<v Dan Ryan>So poor math scores and the fact that they were showing that they were using cannabis were the 2 reasons why many were eliminated from that.

1385
02:31:10.394 --> 02:31:12.209
<v Dan Ryan>So there's also an organic connection there.

1386
02:31:12.400 --> 02:31:13.878
<v Dan Ryan>So I hope the 2 offices can work together.

1387
02:31:13.926 --> 02:31:14.086
<v Dan Ryan>Thank you.

1388
02:31:17.911 --> 02:31:19.372
<v Dan Ryan>So thank you, Portland Children's Library.

1389
02:31:19.438 --> 02:31:32.372
<v Dan Ryan>Prosper Portland, when it comes to the investments for storefronts, I do want to say that the $200K— what did we spend last year in repair grants expand, or the year that we're currently in?

1390
02:31:32.452 --> 02:31:33.641
<v Dan Ryan>Does anyone know that figure?

1391
02:31:35.056 --> 02:31:36.807
<v Cornell Wesley>I'll get you that exact number shortly.

1392
02:31:37.209 --> 02:31:47.507
<v Dan Ryan>It seems like this might not be enough, but I'll tell you what, I think what is also frustrating from every storefront owner I've met is they don't see this as a grant because they're so cash poor.

1393
02:31:48.438 --> 02:31:52.685
<v Dan Ryan>They leave their windows boarded up because they can't do the down payment.

1394
02:31:53.022 --> 02:31:53.119
<v Dan Ryan>I see.

1395
02:31:53.166 --> 02:31:58.617
<v Dan Ryan>And so I think it should— I hope that your customer service can lean into being more of a grant and less of a reimbursement.

1396
02:31:59.018 --> 02:32:05.926
<v Dan Ryan>I'd like to have you please consider that as soon as possible, especially as you take in partnership that you're working with us on storefronts.

1397
02:32:10.020 --> 02:32:19.469
<v Cornell Wesley>Well, it— while it is a reimbursable model, I put an asterisk with there because we will allow direct payment to those vendors if they supply.

1398
02:32:19.549 --> 02:32:28.534
<v Cornell Wesley>So a qualified contractor can submit that invoice and we'll pay them directly so that that owner does not have to even be involved in the transaction.

1399
02:32:29.079 --> 02:32:31.277
<v Cornell Wesley>We have about $220,000 remaining.

1400
02:32:32.104 --> 02:32:35.115
<v Cornell Wesley>That we can, and again, we can pay a contractor directly.

1401
02:32:35.164 --> 02:32:38.802
<v Dan Ryan>Listen, how much last year were we— did you get designated for that?

1402
02:32:39.013 --> 02:32:40.316
<v Dan Ryan>I know it started at one number.

1403
02:32:40.622 --> 02:32:46.567
<v Cornell Wesley>The full year budget was about $1 million allocated, which about, and again, we have about $220,000 of that remaining.

1404
02:32:48.104 --> 02:32:48.426
<v Dan Ryan>Okay.

1405
02:32:48.587 --> 02:32:49.988
<v Dan Ryan>I know, I thank you for listening.

1406
02:32:50.038 --> 02:32:55.110
<v Dan Ryan>I believe you, but I don't think the storefront folks understand that, what you just said to me.

1407
02:32:55.576 --> 02:32:57.396
<v Dan Ryan>They see it as a reimbursement and it's cumbersome.

1408
02:32:59.545 --> 02:33:08.613
<v Cornell Wesley>Well, I want to reiterate to all those who are listening that we will work directly with the contractors and we will execute payment directly on their behalf.

1409
02:33:08.774 --> 02:33:09.435
<v Dan Ryan>Okay, thank you.

1410
02:33:09.484 --> 02:33:11.386
<v Dan Ryan>I'll share that when I listen to them as well.

1411
02:33:11.820 --> 02:33:24.613
<v Dan Ryan>I hope also, Mr. Mayor, and Prosper Portland, as we develop the storefront program— well, first and foremost, if we have cuts to police and fire, this is going to be pretty frustrating for all of them because they've been at the front of the line saying we can't do this.

1412
02:33:24.700 --> 02:33:30.240
<v Dan Ryan>We can't experience more cuts from police and fire and continue to think it's a good idea to re-sign our leases.

1413
02:33:30.497 --> 02:33:36.488
<v Dan Ryan>So that's what I hear from every corner of my district and also when I'm around Portland prior to this.

1414
02:33:37.565 --> 02:33:54.147
<v Dan Ryan>But I do know that it's going to be real important for us not to just do new money just to get people to sign leases, but we've got to have some support for those that have been hanging in there who don't even have money to get to To reimburse their window or to put the down payment on the window.

1415
02:33:54.789 --> 02:33:58.468
<v Dan Ryan>They're barely paying themselves enough to live on and it's hard for them to pay.

1416
02:33:58.565 --> 02:34:02.388
<v Dan Ryan>They're paying their employees, but they're not paying themselves through much of the last few years.

1417
02:34:02.501 --> 02:34:08.253
<v Dan Ryan>So I hope that we lean into those that have been signed up on their lease for 5 to 10 years.

1418
02:34:09.087 --> 02:34:11.180
<v Dan Ryan>And I just wanna make sure I keep reiterating that point.

1419
02:34:11.663 --> 02:34:15.399
<v Dan Ryan>And are you working with Bricks Need Mortar as an organization?

1420
02:34:15.529 --> 02:34:15.626
<v Cherity Montez>Yes.

1421
02:34:16.826 --> 02:34:19.329
<v Cornell Wesley>I'm unfamiliar with that organization.

1422
02:34:19.474 --> 02:34:21.110
<v Dan Ryan>Their name says a lot.

1423
02:34:21.158 --> 02:34:25.057
<v Dan Ryan>So Brick, Steel, Mortar is a connection with small businesses and storefronts specifically.

1424
02:34:25.104 --> 02:34:27.671
<v Cornell Wesley>Yes, I have recently been in contact with them.

1425
02:34:27.799 --> 02:34:28.745
<v Dan Ryan>Yes, I have.

1426
02:34:29.420 --> 02:34:39.942
<v Dan Ryan>Utilizing that partnership is going to be very important for this to be supported for the longer term and for the grassroots to feel like they're connecting with this program.

1427
02:34:40.888 --> 02:34:42.269
<v Cornell Wesley>Councilor Heron, you're absolutely correct.

1428
02:34:42.333 --> 02:34:47.020
<v Cornell Wesley>I just want to leave you with protecting what we have is extremely important to us as well.

1429
02:34:47.020 --> 02:34:47.418
<v Olivia Clark>Thank you.

1430
02:34:47.418 --> 02:34:48.399
<v Dan Ryan>Thank you for hearing that.

1431
02:34:49.219 --> 02:34:50.639
<v Jamie Dunphy>Thank you, Councilor Ryan.

1432
02:34:50.639 --> 02:34:51.860
<v Jamie Dunphy>Councilor Knoll.

1433
02:34:51.860 --> 02:34:53.780
<v Sameer Kanal>Thank you for that question, Councilor Ryan.

1434
02:34:53.780 --> 02:34:54.659
<v Sameer Kanal>I appreciate it.

1435
02:34:54.659 --> 02:35:05.540
<v Sameer Kanal>Sounds like we might need to help with— looks like we'd need about $600,000 more than the $200,000 currently penciled in to maintain the current service level for that program, the grant program.

1436
02:35:06.139 --> 02:35:07.610
<v Sameer Kanal>Unless people stop breaking windows.

1437
02:35:07.819 --> 02:35:09.559
<v Sameer Kanal>Well, yes, uh, of course.

1438
02:35:09.559 --> 02:35:12.798
<v Sameer Kanal>And, uh, Please, Portland, stop breaking windows.

1439
02:35:13.376 --> 02:35:18.192
<v Sameer Kanal>The other thing I just wanted to mention, there was a comment earlier that we can't revisit.

1440
02:35:18.754 --> 02:35:23.442
<v Sameer Kanal>I think the example was used for Clean and Safe, but I think this is a conversation that's broader than that.

1441
02:35:23.490 --> 02:35:27.729
<v Sameer Kanal>We can reevaluate contracts in the context of them crossing a fiscal year.

1442
02:35:27.778 --> 02:35:28.790
<v Sameer Kanal>We've been told that on the dais.

1443
02:35:29.127 --> 02:35:31.905
<v Sameer Kanal>This is not about Clean and Safe at this moment.

1444
02:35:32.081 --> 02:35:38.522
<v Sameer Kanal>I want to talk about, we just got the first big look in our Thank you.

1445
02:35:39.710 --> 02:35:41.189
<v Sameer Kanal>I appreciate that again.

1446
02:35:41.253 --> 02:35:42.425
<v Sameer Kanal>And one of them was Urban Alchemy.

1447
02:35:43.084 --> 02:35:56.469
<v Sameer Kanal>And I think there's a conversation to be had about when are we going to start looking at the $8.1 billion contracts collectively, of which $3+ billion remain yet to go in contracts that cross the fiscal year.

1448
02:35:57.306 --> 02:36:05.961
<v Sameer Kanal>And so I just wanted to get that on the record that there's a conversation that needs to happen Not all of those have anything to do with the service area or this portion of it.

1449
02:36:06.155 --> 02:36:07.454
<v Sameer Kanal>But, you know, we're hearing about that.

1450
02:36:07.503 --> 02:36:15.302
<v Sameer Kanal>There's a new contract I just saw a news article about to do design work on the waterfront from Parks.

1451
02:36:15.769 --> 02:36:17.759
<v Sameer Kanal>These are big contracts, some of them.

1452
02:36:18.111 --> 02:36:18.850
<v Sameer Kanal>Some of them are smaller.

1453
02:36:18.931 --> 02:36:20.295
<v Sameer Kanal>Some of them don't cross a fiscal year.

1454
02:36:20.343 --> 02:36:20.744
<v Sameer Kanal>Some do.

1455
02:36:21.337 --> 02:36:21.932
<v Sameer Kanal>Some of them are good.

1456
02:36:22.430 --> 02:36:23.762
<v Sameer Kanal>And I want to be clear about that.

1457
02:36:23.873 --> 02:36:31.066
<v Sameer Kanal>But I do think that there's a function that council has Not yet exercised that we're aware— we've become aware that we can.

1458
02:36:31.514 --> 02:36:37.183
<v Sameer Kanal>So, um, I, I look forward to having those conversations when people do bring up contracts.

1459
02:36:37.280 --> 02:36:48.310
<v Sameer Kanal>I think I, I will say I'm interested in looking at Urban Alchemy, uh, specifically, but for the rest, I'm, I'm currently just wanting to note that that option exists, um, and, and get that on the record.

1460
02:36:48.760 --> 02:36:49.467
<v Sameer Kanal>Uh, one last thing.

1461
02:36:49.578 --> 02:36:54.319
<v Sameer Kanal>Councilor Ryan is correct, it was one, and, and so is Director Wesley, was one million last year.

1462
02:36:54.319 --> 02:36:58.090
<v Sameer Kanal>It was Ryan 1, uh, and I appreciate again getting to work with you on that.

1463
02:36:59.260 --> 02:37:06.979
<v Sameer Kanal>Um, so if we use $780,000 this year and there's $200,000 penciled in, that's where I'm getting the— that's $580,000 as a gap.

1464
02:37:06.979 --> 02:37:11.180
<v Sameer Kanal>That's where I'm getting the $600,000 figure, just for, for transparency.

1465
02:37:11.180 --> 02:37:12.780
<v Cornell Wesley>Thanks.

1466
02:37:12.780 --> 02:37:18.579
<v Jamie Dunphy>And Councilor Knell, I think you'll enjoy our work session tomorrow because it includes conversations around contracts.

1467
02:37:20.182 --> 02:37:20.807
<v Jamie Dunphy>Councilor Novick.

1468
02:37:22.251 --> 02:37:27.610
<v Steve Novick>Mr. President, I just wanted to follow up on Councilor Ryan's comment about the departure of Lisa Pellegrino.

1469
02:37:28.106 --> 02:37:33.320
<v Steve Novick>When I was here 10 years ago, we had 2 incredibly talented and valuable Pellegrinos, Martha and Lisa.

1470
02:37:33.801 --> 02:37:41.343
<v Steve Novick>And I think it's— it does not escape my notice that the city seems to have gone downhill a fair bit since we lost our first Pellegrino.

1471
02:37:41.519 --> 02:37:46.673
<v Steve Novick>And I am concerned that if we have no Pellegrinos at all, we'll be entering a Pellegrino deficiency doom loop.

1472
02:37:47.108 --> 02:37:55.681
<v Steve Novick>So I would suggest to the city administrator and all of the bureau directors, if you have an opportunity to hire a Pellegrino, please take it.

1473
02:37:56.957 --> 02:37:58.233
<v Jamie Dunphy>Thank you, Councilor Novick.

1474
02:38:02.515 --> 02:38:03.032
<v Jamie Dunphy>Councilor Kanal.

1475
02:38:04.131 --> 02:38:12.350
<v Sameer Kanal>I just wanted to, in the context of the, uh, conversation around reputation and downtown marketing, I did want to point everybody to the Thank you.

1476
02:38:12.414 --> 02:38:12.574
<v Sameer Kanal>Thank you.

1477
02:38:12.622 --> 02:38:17.176
<v Sameer Kanal>So I want to talk about a Conde Nast Traveler story that I think— I see nods, so you're already aware of it.

1478
02:38:17.593 --> 02:38:22.067
<v Sameer Kanal>But Rose City is Better Than Ever is the headline.

1479
02:38:22.228 --> 02:38:32.637
<v Sameer Kanal>And one of the great things about this article and so many of the others that talk about Portland, descriptive of what the experience is like of visiting Portland, is it highlights the neighborhoods.

1480
02:38:33.373 --> 02:38:36.356
<v Sameer Kanal>And I want to— we talked about this earlier.

1481
02:38:36.533 --> 02:38:38.104
<v Sameer Kanal>It talked about the Alberta Arts District.

1482
02:38:38.700 --> 02:38:40.209
<v Sameer Kanal>It talked about the Central East Side.

1483
02:38:40.611 --> 02:38:41.944
<v Sameer Kanal>It talked about St. Johns.

1484
02:38:42.138 --> 02:38:43.390
<v Sameer Kanal>It talked about Boise.

1485
02:38:43.520 --> 02:38:45.512
<v Sameer Kanal>It talked about Sunnyside, right?

1486
02:38:45.816 --> 02:38:54.798
<v Sameer Kanal>Um, you can come here to Portland, and I hope you do come downtown if you do, but one can have a good week in Portland without ever visiting downtown.

1487
02:38:55.457 --> 02:38:58.621
<v Sameer Kanal>Um, again, please do come downtown, but there's plenty to do.

1488
02:38:58.750 --> 02:39:07.052
<v Sameer Kanal>Obviously, uh, St. Johns and Boise and Alberta Arts District are in my district, so I gotta plug them, and I spend a lot I'm not going to spend a lot of time in all of them, in particular Alberta.

1489
02:39:07.117 --> 02:39:23.030
<v Sameer Kanal>But I did want to mention that we need to get into a place of talking about what we are and not what trailing indicators— like, you know, when the president sees a 5-year-old video to say Portland's on fire, we're doing the equivalent of that if we're saying that there's still this major reputational narrative.

1490
02:39:23.237 --> 02:39:36.038
<v Sameer Kanal>When people come here once, they tend to be able to communicate back to their networks in other cities about what they've experienced, and that disabuses them of the notion that are fed to them by conservative media around the country.

1491
02:39:36.614 --> 02:39:37.914
<v Sameer Kanal>And I wanted to highlight that.

1492
02:39:37.994 --> 02:39:38.234
<v Sameer Kanal>Thanks.

1493
02:39:39.036 --> 02:39:40.046
<v Jamie Dunphy>Thank you, Councilor Kanal.

1494
02:39:40.622 --> 02:39:41.200
<v Jamie Dunphy>Councilor Ryan.

1495
02:39:41.602 --> 02:39:44.424
<v Dan Ryan>Yeah, I just want to acknowledge I love that article as well.

1496
02:39:44.711 --> 02:39:51.382
<v Dan Ryan>And it did make me think, where's Travel Portland on that, on the downtown contract?

1497
02:39:51.447 --> 02:39:52.906
<v Dan Ryan>Are they part— are they one of the partners?

1498
02:39:52.986 --> 02:39:53.915
<v Dan Ryan>I didn't see them listed.

1499
02:39:54.173 --> 02:39:55.310
<v Donnie Oliveira>We can follow up.

1500
02:39:55.711 --> 02:39:56.417
<v Donnie Oliveira>We can follow up.

1501
02:39:56.674 --> 02:40:04.490
<v Donnie Oliveira>I'm not sure that they are, but we can ask about their nexus 'Cause they kind of help feed these articles to national magazines.

1502
02:40:04.540 --> 02:40:06.483
<v Dan Ryan>So I thought, oh yeah, where are they on that?

1503
02:40:06.564 --> 02:40:07.623
<v Dan Ryan>So I appreciate that.

1504
02:40:08.315 --> 02:40:08.652
<v Dan Ryan>That's all.

1505
02:40:08.700 --> 02:40:11.672
<v Dan Ryan>I just wanted to make sure that Travel Portland got into that conversation.

1506
02:40:11.768 --> 02:40:11.993
<v Dan Ryan>Thanks.

1507
02:40:12.234 --> 02:40:16.234
<v Dan Ryan>And I'm supportive of the investment for downtown.

1508
02:40:16.506 --> 02:40:27.558
<v Dan Ryan>I still think the funding formula of the downtown used to be known as, and all great cities have a robust downtown, and it's like a turnstile of currency.

1509
02:40:28.218 --> 02:40:31.093
<v Dan Ryan>And then we pump that money out to the rest of the city.

1510
02:40:31.992 --> 02:40:36.424
<v Dan Ryan>And I haven't seen an operational model for a city not include that.

1511
02:40:37.211 --> 02:40:39.733
<v Dan Ryan>And so I really do hope that we can continue to do that.

1512
02:40:39.798 --> 02:40:48.711
<v Dan Ryan>And I want to also acknowledge the investments in impact reduction and graffiti abatement all have been a big part of the renaissance of Portland.

1513
02:40:49.032 --> 02:40:52.613
<v Dan Ryan>And if we cut those programs, I think we'll see some backpedaling.

1514
02:40:52.727 --> 02:40:53.706
<v Dan Ryan>So thank you, Mayor, for including that.

1515
02:40:53.754 --> 02:40:53.915
<v Dan Ryan>Thank you.

1516
02:40:54.397 --> 02:40:59.278
<v Dan Ryan>Those very important investments that allow us to have articles that Councilor Kanal mentions.

1517
02:40:59.614 --> 02:40:59.871
<v Dan Ryan>Thanks.

1518
02:41:01.236 --> 02:41:02.120
<v Jamie Dunphy>Thank you, Councilor Ryan.

1519
02:41:02.505 --> 02:41:04.239
<v Jamie Dunphy>Colleagues, no one else in the queue.

1520
02:41:04.352 --> 02:41:06.504
<v Jamie Dunphy>We have concluded our work session.

1521
02:41:07.162 --> 02:41:11.239
<v Jamie Dunphy>Don't worry, we have an executive session this afternoon and we also have a work session tomorrow morning.

1522
02:41:11.289 --> 02:41:14.370
<v Jamie Dunphy>So with that, we are adjourned.

1523
02:41:14.564 --> 02:41:16.811
<v Jamie Dunphy>Thank you all for being here today.