WEBVTT

1
00:06:02.632 --> 00:06:04.430
<v Jamie Dunphy>Good afternoon, friends.

2
00:06:04.495 --> 00:06:07.997
<v Jamie Dunphy>We are back in this same place for a different conversation.

3
00:06:08.093 --> 00:06:14.389
<v Jamie Dunphy>I'm calling to order the afternoon work session on the spring TAO on this—.

4
00:06:14.680 --> 00:06:14.937
<v Dan Ryan>What is it—.

5
00:06:14.937 --> 00:06:16.028
<v Jamie Dunphy>Thursday, May 5th.

6
00:06:16.221 --> 00:06:16.754
<v Jamie Dunphy>March 5th.

7
00:06:16.932 --> 00:06:17.627
<v Candace Avalos>Why do I always do that?

8
00:06:19.355 --> 00:06:20.129
<v Jamie Dunphy>Gavel, we're here.

9
00:06:21.682 --> 00:06:29.829
<v Jamie Dunphy>Welcome our friends from— our CFO Biery and Budget Director, uh, Levine is your last name?

10
00:06:30.021 --> 00:06:31.814
<v Jamie Dunphy>There it is, I found it.

11
00:06:32.298 --> 00:06:33.319
<v Jamie Dunphy>Uh, turning it over to you.

12
00:06:34.791 --> 00:06:37.170
<v Jonas Biery>Uh, great, Council President and Council, thank you.

13
00:06:37.543 --> 00:06:38.255
<v Jonas Biery>Uh, good afternoon.

14
00:06:38.369 --> 00:06:40.648
<v Jonas Biery>For the record, Jonas Biery, the city's Chief Financial Officer.

15
00:06:40.730 --> 00:06:43.838
<v Jonas Biery>Everybody's fed, hydrated, happy, ready to go.

16
00:06:45.019 --> 00:06:53.435
<v Jonas Biery>So I think Ruth's gonna pull up, if you don't mind pulling up the slide deck while I get going, kind of quickly walk through the agenda for our next few hours together.

17
00:06:54.701 --> 00:07:15.588
<v Jonas Biery>As this is coming up, I'll do a brief introduction, kind of start with a recap of our prior discussions and actions describing kind of how we got to here today to this work session, share the primary goals of the work session, provide a little context on the why of the— why do we do a Spring TAO technical adjustment ordinance, and preview what that is intended to achieve.

18
00:07:15.653 --> 00:07:15.797
<v Jonas Biery>Thank you.

19
00:07:17.399 --> 00:07:25.911
<v Jonas Biery>City Budget Office Director Levine will walk through the numbers, including an update on the remaining fiscal '25-'26 deficit and some technical details.

20
00:07:25.959 --> 00:07:28.476
<v Jonas Biery>Reminder, we're here to talk about '25-'26, the current year.

21
00:07:29.149 --> 00:07:33.846
<v Jonas Biery>And then I'll jump back in and review some recommendations and potential solutions to fill that deficit.

22
00:07:34.216 --> 00:07:39.569
<v Jonas Biery>We'll close with a heads up on a few more technical things that you can expect to see in the ordinance itself.

23
00:07:40.307 --> 00:07:46.495
<v Jonas Biery>Council President, I assume we'll kind of naturally take a pause at some point around the 90-minute mark and have a little— absolutely.

24
00:07:46.543 --> 00:07:49.850
<v Jamie Dunphy>It's my intention to get us to, Have a bio break around 3:30.

25
00:07:49.850 --> 00:07:50.730
<v Jonas Biery>Great, perfect.

26
00:07:50.730 --> 00:07:57.699
<v Jonas Biery>Yeah, and I think we'll get through our prepared material in probably 30 minutes-ish, and so we'll have plenty of time to navigate that.

27
00:07:58.949 --> 00:08:08.040
<v Jonas Biery>Quick preview that while a deficit, I don't wanna bury the lead here, while a deficit is never great news, there actually is a little bit of good news, at least in context.

28
00:08:08.449 --> 00:08:17.870
<v Jonas Biery>First, that the $18 million gap that was mentioned this morning that we're gonna talk about today is on the lower end of what we previously communicated as an expectation.

29
00:08:17.870 --> 00:08:18.009
<v Olivia Clark>We previously said $15 to $25 million.

30
00:08:19.982 --> 00:08:21.151
<v Jonas Biery>Was the range we thought we were in.

31
00:08:22.466 --> 00:08:26.040
<v Jonas Biery>We are at the lower end of that range, so that's at least a mild positive.

32
00:08:26.891 --> 00:08:36.268
<v Jonas Biery>Second quick preview of good news is that we believe there are viable solutions that avoid any reductions to staff or service levels in this fiscal year.

33
00:08:36.332 --> 00:08:38.994
<v Jonas Biery>So that was another primary objective as we thought about this work.

34
00:08:39.923 --> 00:08:43.322
<v Jonas Biery>I think we'll close also then with a slide.

35
00:08:43.385 --> 00:08:57.749
<v Jonas Biery>We got kind of discuss council recommendations, sort of wanna make sure we have space to obviously receive that feedback and then talk a little bit about some of those details that we will then draft into the actual ordinance that will come back to Council in April.

36
00:08:57.797 --> 00:09:00.794
<v Jonas Biery>So really goal today is to get some of that feedback from you.

37
00:09:01.980 --> 00:09:03.150
<v Jonas Biery>Next slide, please.

38
00:09:03.807 --> 00:09:08.504
<v Jonas Biery>So want to make sure and set the context of kind of how did we get here.

39
00:09:09.514 --> 00:09:18.556
<v Jonas Biery>Council passed the '25-'26 budget, and then we previously discussed fall technical adjustment ordinance in November 2025.

40
00:09:19.277 --> 00:09:28.654
<v Jonas Biery>At that time in November, we talked about a variety of potential potential solutions to try to bridge what we foresaw as a gap for the fiscal year.

41
00:09:28.735 --> 00:09:34.168
<v Jonas Biery>We talked about things like competition set-aside, which ultimately we used a portion of.

42
00:09:34.346 --> 00:09:39.731
<v Jonas Biery>And we talked about other options including uses of fund balance and reserves, et cetera.

43
00:09:40.437 --> 00:09:56.163
<v Jonas Biery>Following that November fall TAO conversation, the city administrator, DCAs, myself, bureau leadership citywide began implementing, directing and implementing cost-saving strategies for the remainder of this fiscal year.

44
00:09:56.947 --> 00:10:05.780
<v Jonas Biery>Those things included a hiring freeze with some exceptions that were allowable, but that was really to increase vacancy savings to help fill some of that gap.

45
00:10:06.405 --> 00:10:16.328
<v Jonas Biery>A variety of spending constraints and enhanced expense monitoring to make sure that we're keeping eyes on and making sure that those cost savings are being— are materializing.

46
00:10:16.905 --> 00:10:19.534
<v Jonas Biery>And I think we'll see that we had some success here.

47
00:10:20.272 --> 00:10:31.769
<v Jonas Biery>We also reviewed various reserves to identify if there were any kind of no-risk or low-risk scenarios where we could pull a little bit of those reserves forward and use them to help bridge the gap.

48
00:10:32.235 --> 00:10:38.924
<v Jonas Biery>And then additionally began some review of contracts and works in progress that could potentially be paused or delayed.

49
00:10:40.490 --> 00:10:57.206
<v Jonas Biery>And so again, I think while particularly the hiring freeze and some of the spending limitations have presented challenges in management of workload and in kind of rethinking how folks maybe prioritize their day-to-day work, those strategies have been effective in creating meaningful current year cost savings.

50
00:10:59.289 --> 00:11:03.768
<v Jonas Biery>That have reduced and contributed significantly to keeping us on the lower end of that gap.

51
00:11:05.990 --> 00:11:07.403
<v Jonas Biery>So that was November.

52
00:11:08.288 --> 00:11:26.798
<v Jonas Biery>Subsequent to passage of the fall TAO in November, at the very end of the calendar year, the very last few days of the calendar year, we, myself, City Budget Office Ruth, identified an additional gap for this fiscal year, which was communicated in an email from City Administrator Lee to City Council on January 7th, 2026.

53
00:11:27.270 --> 00:11:31.470
<v Jonas Biery>At that early stage, we had communicated a preliminary okay.

54
00:11:31.470 --> 00:11:33.059
<v Jonas Biery>At that time, we identified a potential gap of up to $26 million.

55
00:11:33.929 --> 00:11:36.809
<v Jonas Biery>We subsequently had a work session with Council on January 22nd.

56
00:11:36.809 --> 00:11:38.539
<v Jonas Biery>Thank you for making time for that so rapidly.

57
00:11:39.269 --> 00:11:46.480
<v Jonas Biery>And at that time, that gap was updated to the range of $15 to $25 million, which I mentioned previously.

58
00:11:47.129 --> 00:11:55.950
<v Jonas Biery>That work session also, if you recall, there was sort of a series of potential solutions that were identified, many of which required additional due diligence.

59
00:11:55.950 --> 00:12:00.409
<v Jonas Biery>And so we've now completed most of that due diligence and are coming back with some suggestions.

60
00:12:00.649 --> 00:12:01.370
<v Jonas Biery>So today we'll put a little finer tip on some of those.

61
00:12:06.070 --> 00:12:07.015
<v Jonas Biery>All right, next slide, please.

62
00:12:07.625 --> 00:12:11.534
<v Jonas Biery>So again, just kind of want to reiterate the goals for this work session today.

63
00:12:11.615 --> 00:12:15.380
<v Jonas Biery>To be clear, this is not a decision-making moment.

64
00:12:15.701 --> 00:12:16.855
<v Jonas Biery>This is a conversation moment.

65
00:12:17.303 --> 00:12:33.778
<v Jonas Biery>The goals are to update you on the status, to discuss the options and recommendations or potential solutions that we've identified, and ultimately to support council's discussion to inform what will ultimately be in the actual ordinance for council adoption and consideration.

66
00:12:33.841 --> 00:12:34.418
<v Jonas Biery>Thank you, Deputy City Attorney.

67
00:12:35.332 --> 00:12:47.323
<v Jonas Biery>I also want to note that we believe— while we believe these numbers that we're going to present today are reasonably close to final, but they are really point-in-time kind of grabs as of today, yesterday technically.

68
00:12:47.500 --> 00:12:50.529
<v Jonas Biery>And so they will continue to evolve around the edges as they always do.

69
00:12:51.442 --> 00:12:57.182
<v Jonas Biery>And so just know if you see a number for a line item here, the number that's actually in the ordinance may be somewhat different.

70
00:12:57.230 --> 00:12:58.640
<v Jonas Biery>There's some rounding that we're doing here.

71
00:12:58.721 --> 00:13:01.190
<v Jonas Biery>And so just want to flag that for awareness.

72
00:13:01.767 --> 00:13:09.099
<v Jonas Biery>And additionally, some of the numbers that we're going to talk about are in fact subject to change based upon input we get from Council today or prior to the ordinance.

73
00:13:09.163 --> 00:13:19.684
<v Jonas Biery>So the goal today is to share information, to get general guidance about priorities in the context of what we want to see in the TAO, and to address questions and not so much to conduct laser surgery.

74
00:13:21.500 --> 00:13:23.921
<v Jonas Biery>All right, I think the last slide before I hand to Ruth.

75
00:13:25.399 --> 00:13:35.037
<v Jonas Biery>Don't intend to go into the weeds here, but we wanted to do kind of a quick visual sort of simulating how we're continuing to evolve the city's budget process in prior years.

76
00:13:35.162 --> 00:13:35.481
<v Jonas Biery>Oh, that's great.

77
00:13:36.520 --> 00:13:45.690
<v Jonas Biery>The spring TAO was used for some purposes like addressing carryover, allocating general fund contingency, returning general fund and underspending to bureaus.

78
00:13:46.124 --> 00:13:57.250
<v Jonas Biery>Partially, we don't have that this year to do, but also this is reflective of kind of our further aim to simplify the actions that we do under the evolving budget process.

79
00:13:58.168 --> 00:14:00.936
<v Jonas Biery>So I wanted to just wave that concept in front of folks.

80
00:14:01.466 --> 00:14:03.469
<v Jonas Biery>And I think just to keep things moving, I'll go ahead and pass to Ruth.

81
00:14:03.581 --> 00:14:05.595
<v Jonas Biery>And if there's questions, happy to come back to those once we're finished here.

82
00:14:10.125 --> 00:14:10.317
<v Elana Pirtle-Guiney>Great.

83
00:14:10.446 --> 00:14:12.275
<v Unidentified speaker>And for the record, Ruth Levine, I'm the budget director.

84
00:14:12.323 --> 00:14:18.260
<v Unidentified speaker>So just, I'm going to talk quickly about kind of where we are with the forecast information here.

85
00:14:18.326 --> 00:14:29.735
<v Unidentified speaker>So on the revenue side, the number that we discussed in January was identified in the December 2025 general fund forecast.

86
00:14:30.345 --> 00:14:36.796
<v Unidentified speaker>And again, that was primarily a forecast for '26-'27, but it included a current year deficit of $13.6 million.

87
00:14:36.845 --> 00:14:37.068
<v Angelita Morillo>Thank you.

88
00:14:37.663 --> 00:14:42.946
<v Unidentified speaker>And that was kind of the moment where we started to have the conversation and look at the situation for the current fiscal year.

89
00:14:43.508 --> 00:14:45.466
<v Unidentified speaker>But on the revenue side, it was $13.6 million.

90
00:14:45.547 --> 00:14:53.961
<v Unidentified speaker>So we've got our total revenues budgeted, we have expense budgeted against that, and we— and Peter forecasted that it was going to come in low.

91
00:14:54.827 --> 00:14:57.059
<v Unidentified speaker>A little bad news on the revenue side.

92
00:14:57.251 --> 00:15:02.326
<v Unidentified speaker>We're tracking about $3.5 million below the December forecast for the current year.

93
00:15:03.432 --> 00:15:06.903
<v Unidentified speaker>Primarily driven by lower ULF revenues.

94
00:15:08.796 --> 00:15:19.548
<v Unidentified speaker>And I think, you know, this is obviously bad news, but I want to put this in context of something we talked about, I think, last week in terms of the timing of the forecast.

95
00:15:20.130 --> 00:15:26.504
<v Unidentified speaker>We regularly— so historically, we've put out the December forecast and updated it in February.

96
00:15:26.951 --> 00:15:29.328
<v Unidentified speaker>This year we're doing one and then again in April.

97
00:15:29.523 --> 00:15:31.883
<v Unidentified speaker>This year we're doing a March update and a May update.

98
00:15:31.980 --> 00:15:32.529
<v Candace Avalos>Okay.

99
00:15:33.048 --> 00:15:40.208
<v Unidentified speaker>So this isn't entirely unusual as we get, you know, actual revenue data in throughout the fiscal year.

100
00:15:40.643 --> 00:15:44.030
<v Unidentified speaker>It informs our current year revenues.

101
00:15:44.095 --> 00:15:50.131
<v Unidentified speaker>It's just that normally we have enough cushion to be able to absorb that without having to balance to that marginal number.

102
00:15:50.629 --> 00:15:52.861
<v Unidentified speaker>So that's kind of where we are.

103
00:15:52.957 --> 00:15:54.852
<v Unidentified speaker>So it takes that, that—.

104
00:15:54.869 --> 00:15:57.326
<v Candace Avalos>Councilor Smith.

105
00:15:59.778 --> 00:16:04.801
<v Unidentified speaker>Revenue gap number a little bit higher.

106
00:16:05.350 --> 00:16:08.773
<v Unidentified speaker>Another thing to note is that these estimates are preliminary.

107
00:16:08.837 --> 00:16:17.484
<v Unidentified speaker>As I just mentioned, we'll be updating the March forecast in a few weeks, and that will set the baseline for the mayor's proposed.

108
00:16:18.621 --> 00:16:26.139
<v Unidentified speaker>One other thing to call out is that BLT is still roughly on track for the current fiscal year.

109
00:16:26.994 --> 00:16:37.581
<v Unidentified speaker>That, that was kind of the source of our shortfall in '24-'25, but we are basically on track for this fiscal year.

110
00:16:40.869 --> 00:16:42.517
<v Unidentified speaker>Okay, so that was the revenue side.

111
00:16:42.581 --> 00:16:51.158
<v Unidentified speaker>This is the expense side, and I want to put these numbers in context.

112
00:16:51.207 --> 00:16:52.240
<v Unidentified speaker>First of all, these are just projections.

113
00:16:54.224 --> 00:17:09.856
<v Unidentified speaker>We're going to talk in a couple of slides about what kind of— what we would recommend pulling into the spring TAO, but these are these are just like the actual projection numbers of revised current year revised budget to actual forecast.

114
00:17:13.631 --> 00:17:17.236
<v Unidentified speaker>And so a couple of things to note about sort of what's assumed in here.

115
00:17:17.996 --> 00:17:21.157
<v Unidentified speaker>This is based on accounting period 7 data.

116
00:17:22.142 --> 00:17:27.317
<v Unidentified speaker>So it's our best estimate at this point, but obviously every accounting period you get a little bit more information.

117
00:17:27.542 --> 00:17:27.672
<v Angelita Morillo>Okay.

118
00:17:28.896 --> 00:17:42.763
<v Unidentified speaker>It assumes no programmatic carryover, which going back to that slide Jonas just talked about in the spring, in the past we have done programmatic carryover for things where we haven't started a one-time funded project and we want to do it in the next year.

119
00:17:43.198 --> 00:17:47.415
<v Unidentified speaker>This doesn't assume that bureaus are kind of holding on to that money, right?

120
00:17:47.480 --> 00:17:52.525
<v Unidentified speaker>It assumes it's— if they're not spending it in the current fiscal year, it's in this forecast.

121
00:17:53.093 --> 00:17:53.239
<v Candace Avalos>Okay.

122
00:17:55.013 --> 00:18:07.963
<v Unidentified speaker>It's only general fund discretionary, and it includes the savings due to the hiring freeze and other spending reductions that Jonas talked about that were directed earlier in the fiscal year.

123
00:18:09.270 --> 00:18:10.280
<v Unidentified speaker>So it's sort of all in.

124
00:18:12.145 --> 00:18:22.500
<v Unidentified speaker>And of course, the other thing to note is that we did not allocate compensation set aside to bureaus' budgets in the fall.

125
00:18:23.397 --> 00:18:38.410
<v Unidentified speaker>That's standard practice is that we don't do that, which means that's a big part of the reason between if you were just looking at revised to forecast, a big part of that gap would be expected because they don't have that compensation set-aside resource in there yet.

126
00:18:39.103 --> 00:18:46.795
<v Unidentified speaker>So all of that is combined here and it's just looking at the delta of the forecast.

127
00:18:50.867 --> 00:18:52.451
<v Unidentified speaker>I know there's a few questions.

128
00:18:52.580 --> 00:18:56.719
<v Unidentified speaker>I'm gonna keep going unless there's sort of immediate clarification, I guess.

129
00:18:57.106 --> 00:19:00.434
<v Elana Pirtle-Guiney>I have 2 clarifications on this slide, Council President, if you don't mind.

130
00:19:00.483 --> 00:19:00.820
<v Olivia Clark>Go ahead.

131
00:19:01.191 --> 00:19:03.426
<v Elana Pirtle-Guiney>I wanna make sure that I'm reading this correctly.

132
00:19:04.182 --> 00:19:07.785
<v Elana Pirtle-Guiney>The black is underspend, the red is where we have overspend.

133
00:19:08.289 --> 00:19:13.497
<v Elana Pirtle-Guiney>Presumably that overspend is overtime that they have not yet gotten money from the compensation set aside for?

134
00:19:14.943 --> 00:19:16.965
<v Unidentified speaker>Yeah, a personnel expense, basically.

135
00:19:17.127 --> 00:19:18.954
<v Unidentified speaker>I mean, it's all, it's everything.

136
00:19:19.085 --> 00:19:23.528
<v Unidentified speaker>So this is a net number, net of like non-general fund revenue.

137
00:19:23.818 --> 00:19:26.567
<v Unidentified speaker>There's a lot that goes into this number.

138
00:19:26.646 --> 00:19:29.267
<v Unidentified speaker>So I would hesitate to say that it's just overtime.

139
00:19:29.378 --> 00:19:29.474
<v Dan Ryan>Okay.

140
00:19:29.845 --> 00:19:32.759
<v Unidentified speaker>It's a big portion of it is compensation set aside.

141
00:19:34.365 --> 00:19:47.641
<v Unidentified speaker>In public safety, there's about $11 million of compensation set aside that would have that was sort of estimated for those bureaus, but there's other stuff that goes into here as well.

142
00:19:47.705 --> 00:19:50.181
<v Elana Pirtle-Guiney>I'll have more questions about that later, but just wanted to clarify.

143
00:19:50.278 --> 00:19:59.041
<v Elana Pirtle-Guiney>And then you said that this does include things like the savings from the 20% reductions and the hiring freezes.

144
00:20:01.701 --> 00:20:19.897
<v Elana Pirtle-Guiney>Is it fair to take the net of these numbers and say that that is money that could decrease the gap that we're seeing, or are we also counting those reductions in determining how big the gap is or isn't, and that would be double counting positive dollars?

145
00:20:20.170 --> 00:20:20.940
<v Unidentified speaker>Yeah, great question.

146
00:20:20.988 --> 00:20:31.929
<v Unidentified speaker>So we're, we're gonna get there in a couple of slides, but basically what we did is took the net overspending and counted that towards our total gap.

147
00:20:32.138 --> 00:20:34.401
<v Unidentified speaker>So the— you'll see it in a couple of slides.

148
00:20:34.450 --> 00:20:44.635
<v Unidentified speaker>I think it should be clear, but the $18.1 includes a net overspending number, and we've pulled out— let me just go to this slide.

149
00:20:44.942 --> 00:20:46.917
<v Elana Pirtle-Guiney>I can wait until you get there if I know it's coming.

150
00:20:47.013 --> 00:20:51.530
<v Elana Pirtle-Guiney>I just wanted to understand if we could do the math simply or if that would be a double count.

151
00:20:51.675 --> 00:20:52.432
<v Unidentified speaker>So I'll wait.

152
00:20:52.497 --> 00:20:52.835
<v Elana Pirtle-Guiney>Thank you.

153
00:20:52.979 --> 00:20:53.382
<v Unidentified speaker>Yeah, sure.

154
00:20:55.875 --> 00:20:56.599
<v Mitch Green>Okay.

155
00:20:59.019 --> 00:21:09.163
<v Unidentified speaker>Okay, so yeah, this transitions just from like pure forecast information to like now how do we take that and balance the current year for the general fund.

156
00:21:10.440 --> 00:21:16.582
<v Unidentified speaker>And so this is kind of how we did that.

157
00:21:16.679 --> 00:21:23.873
<v Unidentified speaker>Essentially, we more or less just took out the council office and auditor's office underspending, and you'll see that on the next thank you.

158
00:21:24.096 --> 00:21:38.701
<v Unidentified speaker>And I'll talk about that in the next slides, but for now, we did it this way to show that sort of those net things like savings from vacancies are just rolled up into this number.

159
00:21:38.814 --> 00:21:46.115
<v Unidentified speaker>So they're not a separate decision point because it's basically— we already have a vacancy freeze in effect.

160
00:21:46.340 --> 00:21:54.154
<v Unidentified speaker>It's just kind of recognizing the underspending from as a result of that and rolling it into this forecasted expenditure number.

161
00:21:57.452 --> 00:22:04.332
<v Unidentified speaker>And I talked about some of those bullet points on the right-hand side, compensation set aside and the enterprise efficiencies.

162
00:22:04.380 --> 00:22:09.088
<v Unidentified speaker>Again, it's all kind of rolled into just the revised budget minus the projection.

163
00:22:09.490 --> 00:22:09.651
<v Unidentified speaker>Great.

164
00:22:09.731 --> 00:22:10.150
<v Jamie Dunphy>Councilor Green.

165
00:22:11.210 --> 00:22:11.531
<v Mitch Green>Thank you.

166
00:22:11.579 --> 00:22:20.288
<v Mitch Green>Just to clarify on the slide, how much exactly Is compensation set-aside contributing to this projected deficit?

167
00:22:22.811 --> 00:22:31.290
<v Unidentified speaker>So we drew— I'm looking at staff— we drew about $10 million from compensation set-aside in the fall to balance the fall TAO.

168
00:22:33.199 --> 00:22:49.334
<v Unidentified speaker>So you could say like this deficit would be that much lower if we hadn't done that, but it's a little hard to pull out exactly because we typically don't allocate the compensation set aside until spring for this reason, right?

169
00:22:49.413 --> 00:22:53.506
<v Unidentified speaker>For the reason that most of the bureaus wouldn't have needed it.

170
00:22:53.828 --> 00:22:54.847
<v Mitch Green>I understand that.

171
00:22:55.026 --> 00:22:57.078
<v Mitch Green>I guess, and I know that there's a historical norm here.

172
00:22:57.127 --> 00:23:04.075
<v Mitch Green>I don't want to get mired in the detail, but just in terms of what we need to distribute now in the spring, do we have a number for that?

173
00:23:06.130 --> 00:23:18.372
<v Unidentified speaker>So essentially, The way this would work, and I'll show it on the next slide, is we're in that number.

174
00:23:18.452 --> 00:23:31.157
<v Unidentified speaker>If we say, you know, we were going with the net number of $1.2 million, and there's some decisions for council to make in there, but if we were, it's— somebody described it as like you're pushing the pile of sand into the holes.

175
00:23:31.510 --> 00:23:35.409
<v Unidentified speaker>You're just moving the money around to backfill the places that need them.

176
00:23:36.396 --> 00:23:43.682
<v Unidentified speaker>And then compensation set aside becomes like a citywide offset at that point, which is kind of how it's budgeted in contingency.

177
00:23:43.730 --> 00:23:46.001
<v Unidentified speaker>It's not budgeted in the individual bureaus, right?

178
00:23:46.066 --> 00:23:51.531
<v Unidentified speaker>So it just kind of helps balance the general fund at that point.

179
00:23:51.627 --> 00:24:02.527
<v Unidentified speaker>So I think the way to think about this number is this is, you know, sort of all else equal, right?

180
00:24:02.640 --> 00:24:15.417
<v Unidentified speaker>Just like continuing business as usual, we would end and so that includes things like continuing to hold vacancies, continuing to reduce—.

181
00:24:16.011 --> 00:24:17.617
<v Mitch Green>I understand all that.

182
00:24:17.875 --> 00:24:26.336
<v Mitch Green>I think, you know, when we approved the fall TAO last year, there's just a schedule that says this much money moves from this contingency to that.

183
00:24:26.449 --> 00:24:29.066
<v Mitch Green>That's the number I'm looking for in the aggregate.

184
00:24:29.275 --> 00:24:31.009
<v Mitch Green>We don't have to have that answer right now, but— Yeah, I mean, I think that's a fair question.

185
00:24:31.833 --> 00:24:33.376
<v Mitch Green>I'm not looking for the total effect.

186
00:24:33.826 --> 00:24:36.560
<v Jonas Biery>And Councilor, it may be helpful if we get through this sort of solution slide.

187
00:24:36.657 --> 00:24:37.880
<v Jonas Biery>That may help also illuminate.

188
00:24:37.943 --> 00:24:42.085
<v Jonas Biery>I mean, Anthony can give us an answer, but I want— that may help illuminate kind of all the pieces here too.

189
00:24:43.703 --> 00:24:45.701
<v Jonas Biery>Colleagues, and we can wait till the end and we will come—.

190
00:24:45.961 --> 00:24:48.866
<v Jamie Dunphy>We will move to robust conversation.

191
00:24:50.000 --> 00:24:52.292
<v Unidentified speaker>Okay, I'm going to turn it back to Jonas.

192
00:24:52.487 --> 00:24:54.037
<v Jonas Biery>All right, so, um, great.

193
00:24:54.086 --> 00:24:56.298
<v Jonas Biery>The conversation is naturally leading us to where I think this is here.

194
00:24:56.346 --> 00:25:01.292
<v Jonas Biery>So we wanted to walk through the options that we think I think should be in the conversation to solve for that $18 million gap.

195
00:25:01.942 --> 00:25:22.388
<v Jonas Biery>As a kind of lead-in reminder, there's trade-offs to any option, but we've aimed to prioritize proposed solutions that avoid staffing or service impacts, that don't force future replenishment requirements, i.e., kind of kick-the-can solutions, and solutions that don't materially increase financial or program risks.

196
00:25:22.534 --> 00:25:26.669
<v Jonas Biery>So that's sort of the key that we've kind of tried to drive here.

197
00:25:27.981 --> 00:25:31.219
<v Jonas Biery>In the presentation today, we've divided these into 2 buckets.

198
00:25:31.267 --> 00:25:45.047
<v Jonas Biery>There are different ways we could do that, but the way we've chosen is kind of using a first bucket here that's shown that includes options that we believe can be accommodated most easily without— with zero or limited impact.

199
00:25:45.607 --> 00:25:48.667
<v Jonas Biery>And so I'll quickly walk through each of these, and then there's just a preview.

200
00:25:48.731 --> 00:25:52.065
<v Jonas Biery>There's a second slide where there's kind of some more, maybe more questions and decisions.

201
00:25:52.498 --> 00:25:54.836
<v Jonas Biery>But of course, these are all subject to council intent.

202
00:25:54.884 --> 00:25:54.997
<v Candace Avalos>Thank you.

203
00:25:55.950 --> 00:25:56.710
<v Unidentified speaker>Thank you.

204
00:25:56.710 --> 00:25:56.970
<v Jamie Dunphy>Thank you.

205
00:25:56.970 --> 00:26:04.079
<v Jonas Biery>So the first line item, we keep $3 million in unrestricted general fund contingency.

206
00:26:04.170 --> 00:26:08.450
<v Jonas Biery>Suggestion would be to go ahead and utilize $2 million of that now, keeping $1 million kind of in pocket.

207
00:26:08.450 --> 00:26:19.220
<v Jonas Biery>There's still a few months left in the fiscal year, so that would be readjusted in the OEO, but that at least gives us a little bit of cushion to continue managing through the rest of the fiscal year here, but use $2 million of that.

208
00:26:19.450 --> 00:26:30.196
<v Jonas Biery>In the prior number, I think it was a $3.3, if I remember correctly, number of that was a council our elected underspending includes council operations budget.

209
00:26:30.585 --> 00:26:40.766
<v Jonas Biery>So we went ahead and pulled that out, like we're pulling back all of the general fund underspending from citywide, grabbing that 0.8 in underspending out of council ops.

210
00:26:41.813 --> 00:26:46.959
<v Jonas Biery>There is remaining compensation set aside that will not be used, will not be necessary to balance.

211
00:26:47.345 --> 00:26:51.539
<v Jonas Biery>And so we can reallocate that at this time towards filling the gap.

212
00:26:52.462 --> 00:26:56.778
<v Jonas Biery>I think we mentioned this last time as an area we were going to do due diligence, but we did look at the technology reserve.

213
00:26:56.858 --> 00:26:56.923
<v Jonas Biery>Yes.

214
00:26:58.558 --> 00:27:02.789
<v Jonas Biery>And identified there's an amount that was kind of— amounts are contributed in by bureaus.

215
00:27:02.855 --> 00:27:10.413
<v Jonas Biery>And so there's an amount contributed in over a couple of years that we've identified was actually probably in excess of what should have been charged to those general fund bureaus.

216
00:27:11.190 --> 00:27:15.181
<v Jonas Biery>So that gets returned back in this line item.

217
00:27:16.910 --> 00:27:20.730
<v Jonas Biery>There's a fund, I think we maybe mentioned this in the past too, called the Bancroft Bond Sinking Fund.

218
00:27:21.134 --> 00:27:25.424
<v Jonas Biery>A little bit complicated the way that works, but it has a balance of around $14 million.

219
00:27:26.615 --> 00:27:36.494
<v Jonas Biery>That reserve is really important because it protects us against— we have to make debt service payments that rely on LID assessments being paid.

220
00:27:36.997 --> 00:27:43.355
<v Jonas Biery>And so that reserve ensures that if those LID assessments don't generate, we can continue to pay off the bonds.

221
00:27:43.976 --> 00:27:52.073
<v Jonas Biery>There's a unique piece in there of around $13 million that would become due in, I believe it's fiscal '29.

222
00:27:52.570 --> 00:27:55.397
<v Jonas Biery>And so this would actually drop the reserve a little bit lower than that $13 million.

223
00:27:55.448 --> 00:27:55.497
<v Jonas Biery>Okay.

224
00:27:56.732 --> 00:28:01.410
<v Jonas Biery>But we expect that it would pick up over a couple years and be back to fill that risk.

225
00:28:01.538 --> 00:28:08.307
<v Jonas Biery>So we feel like $2 million is the appropriate number to pull from that fund right now without materially increasing risk.

226
00:28:08.853 --> 00:28:18.926
<v Jonas Biery>And then we've had conversations with PPB about the asset forfeiture fund and identified that approximately $1.4 million could be pulled from that.

227
00:28:18.991 --> 00:28:22.630
<v Jonas Biery>So those were kind of the first bucket of things we felt like were—.

228
00:28:22.630 --> 00:28:22.711
<v Elana Pirtle-Guiney>Okay.

229
00:28:23.846 --> 00:28:32.767
<v Jonas Biery>You know, as I said, kind of low or no impact that are connected to the general fund, can be done without other legal, you know, considerations.

230
00:28:33.221 --> 00:28:41.457
<v Jonas Biery>And so that takes that $18 million, if we accepted that full bucket, it takes the $18 million down to $6.6 remaining.

231
00:28:42.035 --> 00:28:44.155
<v Jonas Biery>And we can talk about that on the next slide maybe if it's okay.

232
00:28:44.237 --> 00:28:46.051
<v Jonas Biery>I'll just do the next slide and then we can come back in.

233
00:28:46.132 --> 00:28:46.229
<v Unidentified speaker>Great.

234
00:28:46.935 --> 00:28:49.984
<v Jonas Biery>All right, so then the second bucket were things where there's a lot more discretion.

235
00:28:50.084 --> 00:28:50.558
<v Jonas Biery>I mean, it's all questions.

236
00:28:50.625 --> 00:28:50.805
<v Steve Novick>Questions.

237
00:28:52.251 --> 00:28:52.991
<v Jonas Biery>Mm-hmm.

238
00:28:53.056 --> 00:28:53.989
<v Jonas Biery>Malleability around.

239
00:28:55.566 --> 00:29:01.698
<v Jonas Biery>So these are also things that have potentially more impactful trade-offs relative to no or minimal.

240
00:29:01.746 --> 00:29:04.854
<v Jonas Biery>And so certainly appreciate council's input as we think through these.

241
00:29:06.157 --> 00:29:10.409
<v Jonas Biery>The first item here is, again, these are options.

242
00:29:11.746 --> 00:29:24.476
<v Jonas Biery>There have been suggestions over the past few weeks, couple months in the context of the Housing Investment Fund discussion to allocate between, I think, the $3-something million and $5-something million back to the general fund.

243
00:29:25.153 --> 00:29:27.704
<v Jonas Biery>Obviously, there was robust discussion about that at the work session this morning.

244
00:29:28.625 --> 00:29:37.617
<v Jonas Biery>Our understanding is that the 0 to 60 TLT is the most flexible bucket to return back to the general fund.

245
00:29:37.828 --> 00:29:40.201
<v Jonas Biery>And so this line item reflects that concept.

246
00:29:40.851 --> 00:29:47.510
<v Jonas Biery>We put a number of $4 million, but this number's obviously scalable to whatever we chose, whatever council might choose.

247
00:29:47.576 --> 00:29:47.723
<v Candace Avalos>Thank you.

248
00:29:50.403 --> 00:30:04.367
<v Jonas Biery>I would note that this does, I think as we've talked in other forums related to the housing fund, that this does come with the trade-off of reducing those dollars being available for future housing-related priorities.

249
00:30:04.463 --> 00:30:13.032
<v Jonas Biery>So that's certainly a trade-off here, but we know it's been discussed in prior forums and so we included that here as an option to balance that remaining $6 million.

250
00:30:14.731 --> 00:30:24.596
<v Jonas Biery>Second item, wanted to make sure we flagged, this reflects the $2.2 million here reflects the aggregate total amount among all council offices, excluding council operations.

251
00:30:24.661 --> 00:30:28.673
<v Jonas Biery>I believe the auditor as well, or including the auditor, not excluding the auditor's office.

252
00:30:29.057 --> 00:30:35.060
<v Jonas Biery>And that's sort of the number pulled as currently projected in the city's expense monitoring system.

253
00:30:36.520 --> 00:30:47.659
<v Jonas Biery>In line what we believe has been the preference of council and certainly direction of the city administrator, bureaus, general fund bureaus citywide are not having an option to keep their underspending.

254
00:30:47.722 --> 00:30:47.818
<v Dan Ryan>Thank you.

255
00:30:48.443 --> 00:30:53.374
<v Jonas Biery>And so, but we didn't feel like it was appropriate for us to make that call for you, for your offices.

256
00:30:55.160 --> 00:31:01.194
<v Jonas Biery>And so we left that on here as an option for consideration by council and feedback about how you would like us to proceed.

257
00:31:02.539 --> 00:31:06.207
<v Jonas Biery>We defer to your direction about how to direct those underspending dollars.

258
00:31:07.381 --> 00:31:09.681
<v Jonas Biery>Third item is one we talked about in the fall.

259
00:31:11.519 --> 00:31:13.297
<v Jonas Biery>This is the citywide obligation reserve.

260
00:31:13.346 --> 00:31:13.476
<v Jonas Biery>Yes.

261
00:31:13.670 --> 00:31:26.056
<v Jonas Biery>The City Reserve Fund has a portion in there, if you recall, that's related to cost— city's potential future costs related to Portland Harbor cleanup and mitigation.

262
00:31:26.717 --> 00:31:34.153
<v Jonas Biery>We can pull from this resource now, but there would be an expectation that these dollars get replenished at some point in the near future.

263
00:31:34.701 --> 00:31:40.951
<v Jonas Biery>And so we'd have to think about that now or think about in the forecast how we reflect that replenishment expectation.

264
00:31:41.000 --> 00:31:41.144
<v Olivia Clark>Thank you.

265
00:31:41.993 --> 00:31:44.115
<v Jonas Biery>So kind of a little bit of a kick-the-can solution here.

266
00:31:44.628 --> 00:32:02.586
<v Jonas Biery>And I'd also just note that using this solution today to solve the current year also takes a— pushes a button that potentially takes that off as an option for next fiscal year if we wanted to try to hold this in pocket and use it to help solve next year's deep budget challenge.

267
00:32:02.634 --> 00:32:06.778
<v Jonas Biery>So a couple of trade-offs with that one that are of relevance.

268
00:32:07.829 --> 00:32:25.997
<v Jonas Biery>And then the last line item is just kind of reflecting that in doing that work of looking at that work that we could stop doing, and again, recognizing this is just within the general fund, there were sort of some packages of things or specific things that bureaus identified as possibilities.

269
00:32:26.999 --> 00:32:34.961
<v Jonas Biery>We haven't recommended it because again, we've tried to sort of avoid recommendations that actually stop doing things, that stop delivering services.

270
00:32:35.009 --> 00:32:36.111
<v Jonas Biery>But that's certainly something we could come back to.

271
00:32:36.175 --> 00:32:36.320
<v Mitch Green>Thank you.

272
00:32:38.951 --> 00:32:43.357
<v Jonas Biery>And provide a little more detail about the specifics under there if council was interested in that.

273
00:32:44.143 --> 00:32:52.522
<v Jonas Biery>I know we have a couple more slides about a little bit what's next, but this might be a good natural pause 'cause that's a lot to digest.

274
00:32:53.211 --> 00:32:54.157
<v Jamie Dunphy>Councilor Kanal.

275
00:32:54.718 --> 00:32:55.118
<v Sameer Kanal>Thank you.

276
00:32:55.278 --> 00:32:56.305
<v Sameer Kanal>I have 3 questions.

277
00:32:56.480 --> 00:33:06.479
<v Sameer Kanal>One is the $2.2 on this slide and the $0.8 on that slide add up to $3 million even, but before it talks about $3.39 in underspending.

278
00:33:07.073 --> 00:33:09.384
<v Sameer Kanal>Is the 0.39 on the auditor side, or is it just around—.

279
00:33:09.384 --> 00:33:11.746
<v Unidentified speaker>Yeah, sorry, I, I couldn't remember if the auditor was in there or not.

280
00:33:11.809 --> 00:33:12.934
<v Unidentified speaker>It must be not there.

281
00:33:13.192 --> 00:33:13.882
<v Candace Avalos>So yeah.

282
00:33:14.299 --> 00:33:21.590
<v Sameer Kanal>Secondly, um, I would love more information about the targeted bureau reductions, the— that last line.

283
00:33:21.768 --> 00:33:25.574
<v Sameer Kanal>What are the quote-unquote public safety programs that we're talking about?

284
00:33:26.809 --> 00:33:28.849
<v Unidentified speaker>Um, yeah, and we can pull something up.

285
00:33:28.913 --> 00:33:38.669
<v Unidentified speaker>I mean, we, we asked bureaus basically to identify general fund contracts and encumbrances that they could at at least pause for the current fiscal year.

286
00:33:39.263 --> 00:33:48.714
<v Unidentified speaker>And so we are just— we kind of rolled those up, the ones that they said that they could potentially pause without, you know, having an issue with their contract or the like.

287
00:33:48.779 --> 00:33:54.704
<v Unidentified speaker>So the biggest buckets in there are $500,000 roughly for graffiti reduction.

288
00:33:55.365 --> 00:33:59.891
<v Unidentified speaker>And then do you want to speak to the ones that are in, uh, the— in PX?

289
00:34:01.699 --> 00:34:02.015
<v Candace Avalos>Sure.

290
00:34:02.164 --> 00:34:06.182
<v Unidentified speaker>Uh, Anthony City Budget Office analyst, supplemental budget coordinator.

291
00:34:06.791 --> 00:34:17.875
<v Unidentified speaker>So we did an exercise in January for bureaus highlighting encumbrances over $100,000 and asked bureaus to see like what could possibly be paused or stopped.

292
00:34:18.019 --> 00:34:43.175
<v Unidentified speaker>And so the 2 packages in PX, um, one is in— and I know Public Safety is here if they want to further comment on that— one's in the Special Programs— Special Projects Bureau, and it's for the Portland Opportunities Industrial Center Incorporated, and there's $334,000 of possible savings there.

293
00:34:43.530 --> 00:34:50.217
<v Unidentified speaker>And then there are video production services connected to PSEP that could be paused.

294
00:34:50.554 --> 00:34:57.811
<v Unidentified speaker>They weren't recommending that necessarily, but they were— they just proposed that as a possible Ginger Dameron, Public Safety Department.

295
00:34:57.907 --> 00:34:58.775
<v Unidentified speaker>I saw your eyebrows.

296
00:34:59.514 --> 00:35:09.003
<v Unidentified speaker>And so the POIC one is like in the process of an amendment, and so it sort of fell in the criteria of this could pause and move into next year.

297
00:35:09.164 --> 00:35:16.099
<v Unidentified speaker>And then PSUP had some underspend that was going to be used for video production that hasn't yet been encumbered.

298
00:35:16.228 --> 00:35:19.536
<v Unidentified speaker>And so both of them kind of fell in that criteria of they're not encumbered yet.

299
00:35:19.599 --> 00:35:19.824
<v Unidentified speaker>Thank you.

300
00:35:20.483 --> 00:35:20.804
<v Candace Avalos>Okay.

301
00:35:20.963 --> 00:35:23.882
<v Sameer Kanal>And is the— who holds the POIC contract that we're talking about?

302
00:35:23.931 --> 00:35:27.427
<v Sameer Kanal>Is it OVP or is it a different part of the public safety?

303
00:35:27.619 --> 00:35:29.143
<v Unidentified speaker>It's now under Ceasefire.

304
00:35:29.688 --> 00:35:30.025
<v Sameer Kanal>Ceasefire.

305
00:35:30.105 --> 00:35:30.217
<v Candace Avalos>Okay.

306
00:35:30.666 --> 00:35:31.099
<v Sameer Kanal>Yeah.

307
00:35:32.414 --> 00:35:38.139
<v Unidentified speaker>I mean, and I think there were also a couple of encumbrances within police that we identified that there was some underspend.

308
00:35:38.188 --> 00:35:41.668
<v Unidentified speaker>So it wasn't just community safety.

309
00:35:42.277 --> 00:35:44.427
<v Sameer Kanal>Are those included in the $1.8 million?

310
00:35:44.762 --> 00:35:45.548
<v Unidentified speaker>They are, yes.

311
00:35:45.646 --> 00:35:48.762
<v Unidentified speaker>I think one of them is the wellness program.

312
00:35:49.436 --> 00:35:59.349
<v Unidentified speaker>Yeah, police has had some one-time dollars for a wellness program that is a multi-year project, and so there's amounts that are encumbered that they don't— they're not going to spend this year.

313
00:35:59.639 --> 00:36:01.695
<v Unidentified speaker>And so those were under the category.

314
00:36:01.952 --> 00:36:12.474
<v Unidentified speaker>Um, and then there's also— we had some encumbrance carryover for the photo radar enforcement, and those bills have come in a little bit lower, so there was some underspend there that was identified.

315
00:36:13.050 --> 00:36:14.980
<v Sameer Kanal>Okay, so it's underspending.

316
00:36:14.980 --> 00:36:15.380
<v Candace Avalos>It's not—.

317
00:36:15.380 --> 00:36:20.760
<v Sameer Kanal>Okay, uh, can you just clarify what the percentage is or the dollar amount that's graffiti of the $1.8 million?

318
00:36:20.760 --> 00:36:22.090
<v Sameer Kanal>About $500,000, I think you said?

319
00:36:22.219 --> 00:36:23.079
<v Jonas Biery>$500,000, Yep.

320
00:36:23.079 --> 00:36:25.800
<v Sameer Kanal>And is that on the PBOT side, on the PMO side?

321
00:36:27.019 --> 00:36:35.400
<v Unidentified speaker>Uh, as council discussed recently, most of the graffiti abatements are now in BPS, so it would be contracts that those folks are managing.

322
00:36:35.420 --> 00:36:36.539
<v Sameer Kanal>Great, thank you.

323
00:36:43.358 --> 00:36:45.005
<v Jamie Dunphy>Any other questions, colleagues?

324
00:36:45.197 --> 00:36:55.978
<v Unidentified speaker>I will say, yeah, the, the $500,000 for graffiti abatement would potentially represent a, like, a service level impact, but it was signaled that that work could be paused if, if directed so.

325
00:36:57.527 --> 00:36:59.094
<v Jamie Dunphy>Okay, no more questions it seems right now.

326
00:37:00.030 --> 00:37:01.626
<v Unidentified speaker>All right, we'll have more time for questions.

327
00:37:02.929 --> 00:37:10.809
<v Unidentified speaker>Um, so in addition to rebalancing the general fund in the spring TAO, um, there will be these— a number of other adjustments.

328
00:37:10.907 --> 00:37:14.148
<v Unidentified speaker>So we wanted to run through some of what to expect there.

329
00:37:14.985 --> 00:37:27.713
<v Unidentified speaker>As was discussed this morning, we did ask explicitly to have bureaus true up their beginning fund balance for '25-'26 to the '24-'25 ending fund balance in the ACVFR.

330
00:37:29.952 --> 00:37:32.679
<v Unidentified speaker>That's normally standard practice.

331
00:37:32.858 --> 00:37:38.028
<v Unidentified speaker>And because the ACVFR this year came out later than the fall TAO, some of those didn't get fully incorporated.

332
00:37:38.159 --> 00:37:38.224
<v Jamie Dunphy>Okay.

333
00:37:39.054 --> 00:37:43.581
<v Unidentified speaker>Sometimes folks need to have the— need to ensure that the numbers align.

334
00:37:43.646 --> 00:37:49.619
<v Unidentified speaker>And so we're expecting that to happen in multiple funds, not just in housing.

335
00:37:52.240 --> 00:37:57.190
<v Unidentified speaker>And then we're also expecting some technical adjustments.

336
00:37:57.304 --> 00:38:07.353
<v Unidentified speaker>I would say some of that is related to the rebalancing of the general fund is how It's like literally how we will do that work.

337
00:38:09.150 --> 00:38:22.539
<v Unidentified speaker>And some of it might just be in other areas, in non-general fund bureaus and the like, where they're moving things either between kind of major object, between spending categories, or across funds.

338
00:38:22.588 --> 00:38:28.840
<v Unidentified speaker>Like the water and sewer funds often make adjustments based on their construction costs and the like in the spring.

339
00:38:29.376 --> 00:38:29.637
<v Candace Avalos>Okay.

340
00:38:32.539 --> 00:38:40.697
<v Unidentified speaker>Recognizing and adjusting revenues that have been received since the fall that haven't been budgeted, such as grants, interagencies, or intergovernmental revenue.

341
00:38:42.820 --> 00:38:51.693
<v Unidentified speaker>And then the general fund contingency bullet is really about rebalancing the general fund.

342
00:38:53.771 --> 00:38:58.572
<v Unidentified speaker>And then the other thing we wanted to highlight, we talked to you about this yes.

343
00:38:58.637 --> 00:39:02.731
<v Unidentified speaker>Back in the fall, Tao, is the health fund.

344
00:39:04.981 --> 00:39:11.168
<v Unidentified speaker>So you might recall we did briefings with every office, I think, on the status of the health fund.

345
00:39:12.860 --> 00:39:23.646
<v Unidentified speaker>The health fund is essentially where we pay out all of our claims that all of our benefit dollars go into, and then we pay out directly out of the health fund because we're self-insured.

346
00:39:24.637 --> 00:39:37.284
<v Unidentified speaker>And we've been steadily drawing down the reserve in the health fund over time, as you can see on this slide, and we have more than exhausted it at this point.

347
00:39:37.445 --> 00:39:48.221
<v Unidentified speaker>And so we already knew we would have to make an interfund loan for the current year to ensure that that fund ends in balance.

348
00:39:49.442 --> 00:39:53.882
<v Unidentified speaker>The situation is a little bit worse than we anticipated, and so we had originally said we would be looking at a $10 million interfund loan.

349
00:39:53.931 --> 00:39:54.045
<v Angelita Morillo>Yes.

350
00:39:56.192 --> 00:39:58.253
<v Unidentified speaker>We're now looking at a $15 million interfund loan.

351
00:39:58.994 --> 00:40:11.304
<v Unidentified speaker>The costs of repaying that loan are basically already included in the numbers we have been assuming since the fall for our health benefit increases for next year.

352
00:40:11.934 --> 00:40:21.978
<v Unidentified speaker>So it doesn't cause a material change, but it— I'm sorry, I'm sorry.

353
00:40:23.085 --> 00:40:27.949
<v Unidentified speaker>You know, is obviously problematic from the standpoint of rebuilding the reserves.

354
00:40:27.998 --> 00:40:37.905
<v Unidentified speaker>So that's the main thing is it would take longer than we would've anticipated to rebuild those reserves, but it doesn't necessarily make our problem worse for '26-'27.

355
00:40:39.206 --> 00:40:50.027
<v Unidentified speaker>But there will be an ordinance specifically to authorize this interfund loan that will be just traveling with the spring TAO, and then the budget will be adjusted to recognize that interfund loan revenue.

356
00:40:50.092 --> 00:40:50.221
<v Candace Avalos>Thank you.

357
00:40:50.547 --> 00:40:53.646
<v Unidentified speaker>Any questions about that?

358
00:40:55.710 --> 00:40:56.420
<v Unidentified speaker>Okay.

359
00:40:58.597 --> 00:40:58.791
<v Unidentified speaker>All right.

360
00:40:59.067 --> 00:41:04.467
<v Unidentified speaker>And then here's the calendar for the rest of this ordinance.

361
00:41:06.710 --> 00:41:16.320
<v Unidentified speaker>So, you know, hoping to get all of your feedback here today, as Jonas mentioned, so that we can take that and reflect it in an ordinance.

362
00:41:16.545 --> 00:41:16.822
<v Angelita Morillo>Thank you.

363
00:41:16.929 --> 00:41:17.284
<v Olivia Clark>Thank you.

364
00:41:17.396 --> 00:41:26.235
<v Unidentified speaker>So we have an emergency ordinance that comes to you all, and a pair of ordinances that come to you all to discuss and then vote on on April 8th and 15th.

365
00:41:26.284 --> 00:41:34.074
<v Unidentified speaker>And there was a question out about whether we would come back to a Committee of the Whole meeting at the end of March after spring break or not.

366
00:41:34.204 --> 00:41:37.030
<v Unidentified speaker>And I think it depends on where you all land today.

367
00:41:38.588 --> 00:41:42.347
<v Unidentified speaker>So I think we can pause there and turn it over for questions.

368
00:41:44.416 --> 00:41:46.117
<v Jamie Dunphy>Okay, colleagues, feel free to jump in the queue.

369
00:41:46.262 --> 00:41:46.952
<v Jamie Dunphy>Councilor Kanal.

370
00:41:47.545 --> 00:41:48.764
<v Sameer Kanal>I'll start with a comment.

371
00:41:48.829 --> 00:41:50.063
<v Sameer Kanal>I might circle back on some questions.

372
00:41:50.112 --> 00:41:57.701
<v Sameer Kanal>The comment is, just for transparency, I have at least 6 hours of requested items, maybe more, for the first Committee of the Whole meeting.

373
00:41:58.358 --> 00:42:01.824
<v Sameer Kanal>I love the enthusiasm, but I just want to point that out.

374
00:42:02.144 --> 00:42:13.771
<v Sameer Kanal>I'm not making any statements about what it's going to be at this moment, but I just want to— I want everybody to be aware of that as they discuss the as-needs for several items, and I'm looking forward to talking to everybody about them.

375
00:42:14.447 --> 00:42:15.802
<v Sameer Kanal>And I'll circle back on questions later.

376
00:42:16.710 --> 00:42:17.804
<v Jamie Dunphy>Okay, thank you, Councilor Kanal.

377
00:42:17.867 --> 00:42:18.414
<v Jamie Dunphy>Councilor Morillo.

378
00:42:20.586 --> 00:42:20.940
<v Angelita Morillo>Thank you.

379
00:42:21.809 --> 00:42:24.481
<v Angelita Morillo>Appreciate all the folks running meetings and trying to schedule things.

380
00:42:24.545 --> 00:42:25.590
<v Angelita Morillo>I know it's not an easy feat.

381
00:42:28.092 --> 00:42:32.193
<v Angelita Morillo>I had a question regarding the police asset forfeiture funds.

382
00:42:33.097 --> 00:42:45.864
<v Angelita Morillo>In the fall TAO, I recommended that PPB or I suggested that PBB could use about $165,000 of asset forfeiture funds for capital purchases in order to save some of our money from the general fund.

383
00:42:46.956 --> 00:42:51.976
<v Angelita Morillo>Certain political actors said that I was trying to attack the police bureau's budget.

384
00:42:52.795 --> 00:42:55.682
<v Angelita Morillo>But now I see that there's— not you guys, other people.

385
00:42:56.228 --> 00:43:02.885
<v Angelita Morillo>But now I see that there's a proposal to use police asset forfeiture funds to cover $1.4 million of event overtime.

386
00:43:03.510 --> 00:43:08.304
<v Angelita Morillo>So I was just curious what changed there that allows us to use that funding now.

387
00:43:08.980 --> 00:43:11.876
<v Unidentified speaker>I'm going to look to the public safety folks if they want to come up.

388
00:43:18.460 --> 00:43:19.139
<v Angelita Morillo>I have questions.

389
00:43:20.286 --> 00:43:20.722
<v Unidentified speaker>Ginger Dameron.

390
00:43:20.771 --> 00:43:25.443
<v Unidentified speaker>I'm not sure I can answer the first part, but I can explain how we came to the $1.4 million.

391
00:43:26.922 --> 00:43:32.362
<v Unidentified speaker>In looking at the overall need for resources, $1.4 million is close to what has come in this year.

392
00:43:33.027 --> 00:43:35.726
<v Unidentified speaker>That wasn't yet obligated and planned for.

393
00:43:36.882 --> 00:43:44.943
<v Unidentified speaker>And those dollars have specific things that they can't already be budgeted and specific things that are eligible.

394
00:43:45.007 --> 00:43:49.746
<v Unidentified speaker>So one thing that's eligible is overtime and overtime that's directly charged to it.

395
00:43:49.827 --> 00:43:59.028
<v Unidentified speaker>And so what the $1.4 million is, is we are anticipating $400,000 for Rose Festival, maybe a little bit less with one less parade happening this year.

396
00:43:59.686 --> 00:44:03.050
<v Unidentified speaker>And so we're just saying we're going to charge the Rose Festival directly to asset forfeiture.

397
00:44:03.612 --> 00:44:14.556
<v Unidentified speaker>We also have been putting $1 million sort of holding in case something large happens in kind of a contingency, and police has reduced their other types of overtime.

398
00:44:14.684 --> 00:44:22.791
<v Unidentified speaker>So we had that million in sort of their overall budget by their overtime reductions, and so that money may not actually have to get spent.

399
00:44:22.840 --> 00:44:31.588
<v Unidentified speaker>It kind of depends on what happens in the next 4 months, but it just allows us to take that piece out of okay.

400
00:44:31.733 --> 00:44:38.746
<v Angelita Morillo>And I will say for the public that's listening, asset forfeiture, I think, is kind of a gross practice, but this is a state law that allows us to access these funds.

401
00:44:38.795 --> 00:44:40.581
<v Angelita Morillo>So while we have them, we might as well use them.

402
00:44:42.085 --> 00:44:51.452
<v Angelita Morillo>Across all the police revenue subfunds and accounting for an updated beginning balancing fund, PBB is going to have roughly $10 million in special revenues.

403
00:44:52.400 --> 00:44:53.313
<v Angelita Morillo>So can we use more of that?

404
00:44:53.362 --> 00:44:53.445
<v Unidentified speaker>Yes.

405
00:44:54.150 --> 00:44:56.909
<v Angelita Morillo>More of that funding this year, just given the crisis that we're in?

406
00:44:58.490 --> 00:45:00.717
<v Angelita Morillo>Or are those allocated based on what you just said?

407
00:45:00.831 --> 00:45:03.443
<v Unidentified speaker>I was asking Nathan if he— I didn't bring the paper in.

408
00:45:03.572 --> 00:45:04.103
<v Unidentified speaker>I meant to.

409
00:45:04.780 --> 00:45:08.371
<v Unidentified speaker>They are planned for and like in different stages of procurement.

410
00:45:08.418 --> 00:45:15.789
<v Unidentified speaker>So the $1.4 million is what we went through that this is not planned for, and it can cover overtime.

411
00:45:15.918 --> 00:45:19.788
<v Unidentified speaker>So there's one bucket of money that's specifically for Regen, which is a technology.

412
00:45:20.559 --> 00:45:22.507
<v Unidentified speaker>It can only go for that bill, and that one is about $1 million.

413
00:45:22.657 --> 00:45:30.333
<v Unidentified speaker>And so there's different— There's 8 different subfunds, and each of them have restrictions on what they can and can't be used for.

414
00:45:31.396 --> 00:45:38.733
<v Unidentified speaker>And we, we went through and identified what would— what there was balance in and what could cover over time.

415
00:45:39.010 --> 00:45:48.507
<v Unidentified speaker>There's some limitations, and I think police doesn't have other expenditures that it was easily identified of like, that can cover it, because we can't supplant the dollars.

416
00:45:50.119 --> 00:45:52.019
<v Unidentified speaker>And Nathan may correct me if I—.

417
00:45:52.101 --> 00:45:58.010
<v Unidentified speaker>Uh, Nathan, I manage the team that does budget, strategic planning, and performance management for public safety.

418
00:45:58.909 --> 00:45:59.438
<v Unidentified speaker>Yes, agreed.

419
00:45:59.485 --> 00:46:06.510
<v Unidentified speaker>I think the sort of key thing there is for the asset forfeiture dollars, they can't be used to supplant existing budget.

420
00:46:06.702 --> 00:46:16.293
<v Unidentified speaker>So if there's something that the Bureau's already planned for, and, you know, at this point being 2/3 of the way through the fiscal year, there is a lot of planning the Bureau has already done.

421
00:46:16.869 --> 00:46:21.985
<v Unidentified speaker>We couldn't reduce those dollars that have been budgeted for to instead use asset forfeiture dollars.

422
00:46:22.081 --> 00:46:23.925
<v Unidentified speaker>So it has to be a bit more opportunistic yeah.

423
00:46:24.134 --> 00:46:27.277
<v Unidentified speaker>So we're not being opportunistic when it's the asset forfeiture dollars.

424
00:46:28.255 --> 00:46:38.615
<v Unidentified speaker>For region, Ginger mentioned some of the other special revenue funds the Police Bureau has are a collection of about a dozen smaller projects.

425
00:46:38.760 --> 00:46:45.318
<v Unidentified speaker>You know, some of these are dollars related to members of the public who have sent in resources for police dogs.

426
00:46:45.688 --> 00:46:49.889
<v Unidentified speaker>So we have money that can go towards expenses around the canine unit.

427
00:46:50.547 --> 00:46:51.717
<v Unidentified speaker>Those are being spent down.

428
00:46:52.326 --> 00:46:56.239
<v Unidentified speaker>It's a small bucket around, I think, $30,000.

429
00:46:56.574 --> 00:46:58.612
<v Unidentified speaker>Each of those have their own restrictions tied to them.

430
00:46:59.846 --> 00:47:08.648
<v Unidentified speaker>Those restrictions don't have the same sort of legal prohibitions around supplanting, but they do just require making sure that we're following through with the intent from whoever gave those dollars.

431
00:47:09.706 --> 00:47:10.668
<v Angelita Morillo>Thank you, that's helpful.

432
00:47:10.764 --> 00:47:16.536
<v Angelita Morillo>And I would love to see later if you could email to us a breakdown of how those dollars are planning to be allocated.

433
00:47:17.338 --> 00:47:24.465
<v Angelita Morillo>And I'm familiar with the I don't know how you pronounce this word, supplantation issue regarding these funds.

434
00:47:25.931 --> 00:47:37.737
<v Angelita Morillo>So given that we know that we can't supplant the Bureau's budget, how do you plan to proactively incorporate these dollars in order to help address the deficit that the general fund is facing?

435
00:47:37.916 --> 00:47:42.318
<v Angelita Morillo>Like, can we proactively do that so that there's— so that we can use more of that fund?

436
00:47:44.793 --> 00:47:46.126
<v Angelita Morillo>I mean, maybe that's a legal question.

437
00:47:46.222 --> 00:47:46.639
<v Angelita Morillo>I'm not sure.

438
00:47:47.106 --> 00:47:50.221
<v Unidentified speaker>Well, I think there's a couple of things.

439
00:47:50.478 --> 00:47:56.449
<v Unidentified speaker>There's the projects that are already underway that we've maybe already put in an order.

440
00:47:57.237 --> 00:48:02.117
<v Unidentified speaker>There's things that are sort of essential to operations, deferred capital projects.

441
00:48:02.358 --> 00:48:18.318
<v Unidentified speaker>And so whether or not we would want to pause those, I think if you're asking about next year, we are kind of asking that question of could we use and where does it fit in with the Police Bureau's overall budget?

442
00:48:19.489 --> 00:48:24.110
<v Unidentified speaker>And which it has been, but just really looking at that strategically on how can we incorporate it in.

443
00:48:24.110 --> 00:48:28.480
<v Unidentified speaker>One of the challenges with the funds is it's not predictable how much we're going to get in.

444
00:48:28.590 --> 00:48:37.170
<v Unidentified speaker>So some years we get $600,000, another year we get $1.5 million, and it just— and we don't fully know when it's going to come.

445
00:48:37.170 --> 00:48:40.190
<v Unidentified speaker>And so that makes it hard to, like, make it an operational part of their budget.

446
00:48:40.190 --> 00:48:44.804
<v Unidentified speaker>I think the challenge is that but we are looking at sort of using those dollars to bridge a gap.

447
00:48:45.460 --> 00:48:55.934
<v Unidentified speaker>Yeah, I will say from a sort of longer-term planning, the bureau has a fair number of capital assets around equipment or vehicles that do need to be replaced over time.

448
00:48:57.233 --> 00:49:06.518
<v Unidentified speaker>One strategy for replacing those would be setting aside dollars in an equipment replacement reserve fund and replacing those, or using general fund discretionary dollars.

449
00:49:07.567 --> 00:49:14.170
<v Unidentified speaker>And historically, it hasn't done that for a lot of that equipment because they've known they've had the Asset Forfeiture Fund as a backstop.

450
00:49:14.525 --> 00:49:29.411
<v Unidentified speaker>So it has over time been a relief on the Bureau's general fund requests, or in this case, the amount of overspend the Bureau has because they're able to use those resources instead.

451
00:49:31.480 --> 00:49:31.956
<v Angelita Morillo>Okay, thank you.

452
00:49:32.023 --> 00:49:32.873
<v Angelita Morillo>That's very helpful.

453
00:49:34.041 --> 00:49:39.188
<v Angelita Morillo>Very interested to see how that plays out, just given the reception that it had during the fall.

454
00:49:39.251 --> 00:49:45.630
<v Angelita Morillo>But perhaps seeing the new numbers for our budget is giving people a reality check this time around.

455
00:49:46.449 --> 00:49:49.766
<v Angelita Morillo>I had another question not regarding the special revenue fund.

456
00:49:49.831 --> 00:49:51.882
<v Angelita Morillo>Thank you for coming up here and answering my questions.

457
00:49:53.021 --> 00:50:25.514
<v Unidentified speaker>Regarding the technology replacement reserve for laptops, will the use of any of the BTS tech reserves put any bureaus in a position to be I don't believe so, and I'm not sure if somebody can speak to it more specifically, but I think my understanding was that this was truly excess, that they did kind of a retrospective look at the laptop replacements and determined that there was an amount that just wasn't needed for those replacements.

458
00:50:25.596 --> 00:50:27.809
<v Unidentified speaker>And so I think the non-general fund amounts have always been based on the actual need.

459
00:50:27.922 --> 00:50:33.548
<v Unidentified speaker>Already gone back to those non-general fund bureaus, and this is just kind of recognizing the general fund portion of that.

460
00:50:34.318 --> 00:50:34.655
<v Angelita Morillo>Gotcha.

461
00:50:34.880 --> 00:50:35.826
<v Angelita Morillo>Okay, thank you so much.

462
00:50:36.163 --> 00:50:38.728
<v Angelita Morillo>Um, I think that's all of my questions for now.

463
00:50:38.920 --> 00:50:40.202
<v Angelita Morillo>Appreciate you.

464
00:50:40.411 --> 00:50:41.309
<v Jamie Dunphy>Thank you, Councilor Murillo.

465
00:50:42.014 --> 00:50:42.721
<v Jamie Dunphy>Councilor Pirtle-Guiney.

466
00:50:44.034 --> 00:50:47.402
<v Elana Pirtle-Guiney>Thank you, Council President, and thank you all for the update today.

467
00:50:48.188 --> 00:51:09.498
<v Elana Pirtle-Guiney>Um, it looks to me like a lot of the funds that you are recommending, or that you have on that not recommended but other options list are funds that while we aren't allowing bureaus to carry over, we might have used as what I'll call beginning fund balance, for lack of a better term, in a different budget year.

468
00:51:10.190 --> 00:51:33.302
<v Elana Pirtle-Guiney>And so I'm concerned that what we're doing by not looking at program changes, and I understand the recommendation not to look at program changes, but by not looking at program changes, I'm concerned that what we're doing is creating an even more difficult situation for ourselves next fiscal year because the release valves that we might have had, however small they are, won't be there at all.

469
00:51:33.561 --> 00:51:36.007
<v Elana Pirtle-Guiney>Is that an accurate reading of what I'm looking at?

470
00:51:38.940 --> 00:51:40.469
<v Jonas Biery>Yeah, Councilor, it's a good question.

471
00:51:40.726 --> 00:51:42.804
<v Jonas Biery>In some cases, I think that's true, right?

472
00:51:42.853 --> 00:51:51.193
<v Jonas Biery>So like using a reserve now as opposed to holding it, finding a different solution, and keeping that reserve in pocket to use later, yes.

473
00:51:54.021 --> 00:52:01.681
<v Jonas Biery>You know, there are some of these buckets that would, you know, there's sort of decisions being made around that, right?

474
00:52:01.762 --> 00:52:16.931
<v Jonas Biery>So the other reality about service reductions is the implementation timeline to have those cost savings materialize this fiscal year are really challenging.

475
00:52:16.985 --> 00:52:25.347
<v Jonas Biery>So if we're talking about something that's like a contract that we just say, you know, we were going to execute that contract on May 15th, we're not going to do that.

476
00:52:26.230 --> 00:52:27.273
<v Jonas Biery>A little easier to grok that.

477
00:52:27.338 --> 00:52:36.907
<v Jonas Biery>I think those were the types of things that are reflected in the $1.8 million, whatever that number was, versus we now have to unwind a thing that we do.

478
00:52:37.213 --> 00:52:38.706
<v Jonas Biery>And so that takes a little bit of time.

479
00:52:39.525 --> 00:52:45.048
<v Jonas Biery>You're right fundamentally in the math, but the implementation of those kinds of reductions is much more challenging.

480
00:52:45.112 --> 00:52:45.224
<v Dan Ryan>Thank you.

481
00:52:46.123 --> 00:52:47.907
<v Jonas Biery>You know, in a late-stage fiscal year.

482
00:52:48.356 --> 00:52:54.039
<v Elana Pirtle-Guiney>Even in the targeted bureau reductions though, it sounds like those are not let's end this contract and not do it.

483
00:52:54.088 --> 00:52:58.327
<v Elana Pirtle-Guiney>It sounds like those are all let's delay this, we're still going to do it next year.

484
00:52:59.065 --> 00:53:05.311
<v Elana Pirtle-Guiney>So I'm not seeing anything before us that reduces services at all.

485
00:53:05.873 --> 00:53:10.659
<v Elana Pirtle-Guiney>And I want to be clear, I don't want to see in a perfect world a reduction in services.

486
00:53:11.530 --> 00:53:40.666
<v Elana Pirtle-Guiney>But when we know that we're going to have $169— is that the number that we're at right now?— million dollars in deficit next budget year, I am a little bit concerned that everything before me gets rid of $5, $6, $10 million in what might be beginning fund balance yeah.

487
00:53:41.148 --> 00:53:45.070
<v Elana Pirtle-Guiney>And doesn't start us having some of those hard conversations.

488
00:53:45.246 --> 00:53:53.713
<v Elana Pirtle-Guiney>I absolutely understand that recommendation, but I think we need to say out loud, we're making the problem harder, not easier, for a few months from now.

489
00:53:54.967 --> 00:53:59.289
<v Elana Pirtle-Guiney>And I am wondering if there's anything— 2 questions.

490
00:53:59.545 --> 00:54:11.393
<v Elana Pirtle-Guiney>One, just to hold, not to answer now, but I'm wondering if there's anything else we should be looking at that is that that, hey, Mr. Mayor may not be recommending this in his budget anyway.

491
00:54:11.456 --> 00:54:12.233
<v Elana Pirtle-Guiney>It's a contract.

492
00:54:12.282 --> 00:54:13.416
<v Elana Pirtle-Guiney>Should we just stop it now?

493
00:54:14.376 --> 00:54:18.027
<v Elana Pirtle-Guiney>And should we be taking a hard look at that before we take any action on the Spring Tow?

494
00:54:20.675 --> 00:54:31.414
<v Elana Pirtle-Guiney>The other thing that I am wondering about is on the compensation set-aside piece, and this would be great to get an answer now if possible.

495
00:54:31.478 --> 00:54:31.623
<v Sameer Kanal>Yes.

496
00:54:32.978 --> 00:54:40.579
<v Elana Pirtle-Guiney>It looks like there's $3.3 million in compensation set-aside that you're recommending to use to help fill the gap.

497
00:54:41.059 --> 00:54:53.742
<v Elana Pirtle-Guiney>Is that what you project to be in excess of what will be needed for compensation set-aside, or do these numbers include what bureaus need out of compensation set-aside and that's what's left?

498
00:54:53.871 --> 00:54:57.494
<v Elana Pirtle-Guiney>Help me understand how compensation set-aside is being used here.

499
00:54:57.574 --> 00:54:57.655
<v Candace Avalos>Yeah.

500
00:54:58.135 --> 00:55:03.063
<v Elana Pirtle-Guiney>And if we're going to have a later conversation about not having enough there or if this is accounting for that.

501
00:55:03.818 --> 00:55:06.532
<v Unidentified speaker>I think the short answer is this is accounting for that.

502
00:55:06.646 --> 00:55:18.664
<v Unidentified speaker>So I mean, the way to think about it is we drew, in answer to Councilor Green's earlier question, $14.4 million from the overall $17 million pot that was compensation set aside.

503
00:55:18.713 --> 00:55:21.155
<v Unidentified speaker>It's now down to $3.3 million.

504
00:55:21.813 --> 00:55:44.202
<v Unidentified speaker>But in a normal year, we would have had enough for whatever the and if, you know, this were what it looked like, we might have only given them $3.62 million out of that total pot, and the rest would have become beginning fund balance, to your other question, for the subsequent budget year.

505
00:55:45.798 --> 00:55:50.385
<v Unidentified speaker>So, but the narrow question is just essentially, this is what's left.

506
00:55:50.467 --> 00:55:52.615
<v Unidentified speaker>It's essentially we would have given it anyways.

507
00:55:52.728 --> 00:55:54.215
<v Unidentified speaker>It is the compensation set-aside need.

508
00:55:54.264 --> 00:55:54.958
<v Unidentified speaker>So it's not a new request.

509
00:55:56.795 --> 00:56:01.851
<v Unidentified speaker>It's just that it's not enough to cover the total need, which is why we're putting all these other things on the list.

510
00:56:02.077 --> 00:56:15.059
<v Elana Pirtle-Guiney>So the $3.62 million, I think you said, I'm not looking at the slide right now, is the projected compensation set-aside need through the end of the fiscal year.

511
00:56:15.123 --> 00:56:17.753
<v Elana Pirtle-Guiney>It's not a point in time where we are at right now need.

512
00:56:17.849 --> 00:56:18.306
<v Unidentified speaker>Correct.

513
00:56:18.356 --> 00:56:19.090
<v Unidentified speaker>So that's the—.

514
00:56:19.481 --> 00:56:19.545
<v Angelita Morillo>This—.

515
00:56:19.742 --> 00:56:30.161
<v Unidentified speaker>And again, that aligns with what we've been talking about roughly with like the normal practice we would do for the spring TAO is we would do projections sometimes a little bit later with like 1 or 2 more accounting periods in them.

516
00:56:30.289 --> 00:56:32.860
<v Unidentified speaker>But we would do projections through the end of the fiscal year.

517
00:56:32.942 --> 00:56:34.949
<v Unidentified speaker>Bureaus would say, this is what we project to need.

518
00:56:35.255 --> 00:56:37.585
<v Unidentified speaker>Here's our request for compensation set aside.

519
00:56:37.923 --> 00:56:43.942
<v Unidentified speaker>And yeah, I mean, we pushed them extra hard this year to give a closer accounting than they normally would have.

520
00:56:43.990 --> 00:56:47.434
<v Unidentified speaker>And so I'm fairly certain we would've had a bigger number if we hadn't done that.

521
00:56:48.170 --> 00:56:53.175
<v Unidentified speaker>Um, but, but yeah, this is the projection through the end of the fiscal year of what they will need.

522
00:56:53.485 --> 00:56:54.753
<v Elana Pirtle-Guiney>Okay, thank you for clarifying.

523
00:56:56.349 --> 00:56:57.317
<v Jamie Dunphy>Thank you, Councilor Pirtle-Guiney.

524
00:56:58.398 --> 00:56:59.221
<v Jamie Dunphy>Councilor Green.

525
00:57:02.027 --> 00:57:02.851
<v Mitch Green>Thank you, Mr. President.

526
00:57:02.898 --> 00:57:03.898
<v Mitch Green>Thanks for getting that exact number.

527
00:57:03.947 --> 00:57:04.771
<v Mitch Green>Appreciate that.

528
00:57:05.400 --> 00:57:13.117
<v Mitch Green>Um, on the slide, let's see, where is it?

529
00:57:13.190 --> 00:57:22.411
<v Mitch Green>Slide oh geez, there's no number, but it's the, um, it's the last table before other spring tow actions.

530
00:57:24.364 --> 00:57:24.702
<v Mitch Green>Thank you.

531
00:57:25.025 --> 00:57:25.476
<v Mitch Green>That one.

532
00:57:26.300 --> 00:57:53.686
<v Mitch Green>Um, so in the narrative it says service areas identified roughly $2 million of EMS reductions that could be implemented, um, but it would carry forward service impacts and I think, I guess my question is, are those reductions to areas that were previously approved in the fall too as encumbrance carryovers?

533
00:57:57.202 --> 00:57:57.755
<v Loretta Smith>Some of them.

534
00:57:58.730 --> 00:58:00.387
<v Unidentified speaker>We haven't done the analysis.

535
00:58:01.983 --> 00:58:10.934
<v Unidentified speaker>There was some carryover for graffiti in the fall, I couldn't tell you right now if these are expenses that were carried over, but we can get that to you.

536
00:58:11.271 --> 00:58:11.947
<v Mitch Green>That would be helpful.

537
00:58:12.139 --> 00:58:36.438
<v Mitch Green>And I guess what I would ask for before we're asked to take a vote on this ordinance is that spreadsheet that shows the current state of play of those EMS contracts, because it was very helpful for me last time in the fall, Tao, to know that even though we appropriated but did not execute EMS contracts in a prior fiscal year.

538
00:58:36.646 --> 00:58:50.958
<v Mitch Green>They were— we were being presented with the case that if we don't approve this, it's going to have service impacts to the current year budget, which for me is really problematic because we approved a budget for '25-'26 to do certain things.

539
00:58:51.710 --> 00:59:01.722
<v Mitch Green>And I didn't think when I was approving that budget I was approving a budget to do those things, but only if I've— I'm going to later approve encumbrance carryovers from previous budgets.

540
00:59:01.771 --> 00:59:10.039
<v Mitch Green>And so some of us tried to call that out in the fall TAO and offered— I mean, Councilor Murillo offered an amendment.

541
00:59:10.376 --> 00:59:22.288
<v Mitch Green>I co-sponsored that amendment that reduced that amount of policy carryover, or I'm sorry, encumbrance carryover, which would've left more money here, which we said would happen.

542
00:59:22.498 --> 00:59:23.309
<v Mitch Green>Councilor Dan Ryan.

543
00:59:26.036 --> 00:59:29.012
<v Mitch Green>And so I just really think that needs to be the focus.

544
00:59:29.496 --> 00:59:35.333
<v Mitch Green>And I'm going to need to see that, like, what are the actuals versus what we said we would need?

545
00:59:36.461 --> 00:59:37.798
<v Mitch Green>If they've been executed, fine.

546
00:59:38.072 --> 00:59:49.518
<v Mitch Green>Like, you know, I'm not a denier of the facts, but I look at $1.8 million here and then previously $2 million, and I just know that there was a lot more there.

547
00:59:50.840 --> 01:00:03.532
<v Mitch Green>And so if there's only $3.8 million of unexecuted contract slack, then that's what it is.

548
01:00:03.646 --> 01:00:06.288
<v Mitch Green>But just, you know, just a little frustrating.

549
01:00:15.027 --> 01:00:26.822
<v Mitch Green>And I'll just leave it with this, and I hate to I try not to take this tone, but when we were pushing that amendment last fall, there, there was some stuff in there that had policy implications that people didn't like, and reasonable people can disagree over that.

550
01:00:28.094 --> 01:00:54.606
<v Mitch Green>But there was one half of it which was very much about fiscal stewardship, which was we really should not spend our kitty down right now and hope that we get the savings through, uh, through the materialization of these, because what we've seen is that didn't and now we have a spring TAO that is being driven in large part by the fact that we don't have as much encumbrance carry— I'm sorry, compensation set aside there to allocate to these bureaus.

551
01:00:54.719 --> 01:01:02.556
<v Mitch Green>I think on average historically we've had about $14 million or so, $12 to $14 million that we need to do to make those bureaus whole.

552
01:01:02.893 --> 01:01:05.045
<v Mitch Green>We're squarely in that zone.

553
01:01:06.121 --> 01:01:08.579
<v Mitch Green>And I'll just leave it at that.

554
01:01:09.376 --> 01:01:11.853
<v Jamie Dunphy>Thank you, Councilor Green.

555
01:01:12.306 --> 01:01:12.971
<v Jamie Dunphy>Councilor Knoll.

556
01:01:14.476 --> 01:01:15.965
<v Sameer Kanal>Thank you, Council President.

557
01:01:16.014 --> 01:01:17.260
<v Sameer Kanal>Thanks everybody for being here.

558
01:01:18.076 --> 01:01:53.925
<v Sameer Kanal>Um, again, I have a ton of different questions here, but I wanted to, um, kind of just stick to one clarifying question, um, which is, I guess, is the, is the, the public safety overspending, is that the amount, is that comparable to what what we've— the numbers we've seen for previous years, not the amount of it, but are we comparing apples to apples if we compare that $3.62 million to the $7 to $10 million we've seen taken out of compensation set aside in the spring town preceding years?

559
01:01:54.358 --> 01:01:58.472
<v Unidentified speaker>Yeah, I would say it's not exactly apples to apples.

560
01:01:58.519 --> 01:02:04.496
<v Unidentified speaker>I'm happy to have them come up and speak to it, but I think part of this overlaps a bit with Councilor Green's comment.

561
01:02:04.789 --> 01:02:04.789
<v Unidentified speaker>Yes.

562
01:02:04.789 --> 01:02:14.889
<v Unidentified speaker>I think it's important to note, and I think this ties into Councilor Smith's comments a moment ago, which is that we've really had a practice of, to some extent, assuming carryover in our year-end projections.

563
01:02:14.889 --> 01:02:25.889
<v Unidentified speaker>And that's both a combination of kind of policy carryover programs that haven't started or are only partway through, and also the encumbrance carryover pieces.

564
01:02:25.889 --> 01:02:31.409
<v Unidentified speaker>And so rather— so what we're— what we did here is we said don't assume that.

565
01:02:31.782 --> 01:02:44.434
<v Unidentified speaker>We're essentially taking it back, and any amount that would have been carried over in a prior year needs to appear as funded in the adopted, essentially, in the proposed and approved and adopted.

566
01:02:44.481 --> 01:02:57.599
<v Unidentified speaker>So it is not apples to apples in that I would say they have probably drawn more in prior years, in part because they weren't kind of returning amounts that they expected to carry over.

567
01:02:58.032 --> 01:03:15.367
<v Unidentified speaker>And so that's to some extent a change that we're making this year in response to some of the frustration that Councilor Green was just speaking to in the fall and the feeling that we sort of kept, assumed too much carryover in our previous practice.

568
01:03:15.431 --> 01:03:32.242
<v Unidentified speaker>And so the combination of that with the fact that we don't have any money to carry over anyways means that we essentially would be taking back more from those bureaus, which equates to giving them less in compensation set-aside.

569
01:03:32.809 --> 01:03:33.947
<v Unidentified speaker>Does that make some sense?

570
01:03:36.896 --> 01:03:47.467
<v Sameer Kanal>So you're assuming that the money we take— we would be taking back in other parts of the budget is effectively given to cover, and then we separately are covering the rest with the compensation set-aside?

571
01:03:47.565 --> 01:03:47.728
<v Unidentified speaker>Correct.

572
01:03:47.777 --> 01:03:53.449
<v Unidentified speaker>Not necessarily that overtime that may also be true, and I can speak to that.

573
01:03:53.530 --> 01:03:56.409
<v Sameer Kanal>It looks like that overtime is reduced at the moment.

574
01:03:56.458 --> 01:03:58.382
<v Sameer Kanal>I'm trying to— that's my underlying question here.

575
01:04:00.134 --> 01:04:00.922
<v Unidentified speaker>It is in police.

576
01:04:01.822 --> 01:04:03.878
<v Unidentified speaker>It is not this year in fire.

577
01:04:04.168 --> 01:04:07.269
<v Unidentified speaker>And I'll— there's a combination of things.

578
01:04:07.318 --> 01:04:13.398
<v Unidentified speaker>So the $3.6 million has a lot of things rolled up into it, and I'm just going to kind of go through specifically.

579
01:04:13.657 --> 01:04:14.688
<v Unidentified speaker>Fire delayed a boat purchase.

580
01:04:15.132 --> 01:04:19.255
<v Unidentified speaker>Because we knew that there was going to be— this was a tighter year.

581
01:04:19.385 --> 01:04:23.925
<v Unidentified speaker>And so they had some underspend in that area that then helps with their overall budget.

582
01:04:24.824 --> 01:04:30.168
<v Unidentified speaker>Their overtime is up, but that is because staffing targets haven't quite met.

583
01:04:30.295 --> 01:04:38.688
<v Unidentified speaker>And so their salary and benefits portion that's not overtime is a little bit— the overspend is not as much as you would anticipate without comp set aside.

584
01:04:39.057 --> 01:04:41.000
<v Unidentified speaker>So that's kind of looking at fire.

585
01:04:41.432 --> 01:04:41.672
<v Loretta Smith>Okay.

586
01:04:41.914 --> 01:04:47.516
<v Unidentified speaker>In police, Police, their overtime is down, and they have implemented some reductions in overtime.

587
01:04:48.175 --> 01:05:01.130
<v Unidentified speaker>And then they've also had some reductions in external materials and services to help with their overall— and just like for it, I think police's compensation set-aside was $6.7 million, but we only have them overspent by $3 million.

588
01:05:01.179 --> 01:05:04.663
<v Unidentified speaker>So they've already done some things, and it's all of public safety.

589
01:05:04.726 --> 01:05:14.971
<v Unidentified speaker>So while we had a hiring freeze in other areas of public safety, there's some underspent in vacancy savings and other external materials and services underspend throughout public safety.

590
01:05:15.099 --> 01:05:15.628
<v Unidentified speaker>So I think—.

591
01:05:15.628 --> 01:05:16.641
<v Sameer Kanal>Fraying that number.

592
01:05:16.849 --> 01:05:17.748
<v Unidentified speaker>Yeah, yeah.

593
01:05:17.813 --> 01:05:22.164
<v Unidentified speaker>So things have been done to kind of make it not as big as it, it could have been at this point.

594
01:05:22.789 --> 01:05:26.097
<v Sameer Kanal>Okay, that's— sorry, Nathan, I want to let you jump in if you want.

595
01:05:26.226 --> 01:05:27.172
<v Unidentified speaker>We talked about fire and police.

596
01:05:27.222 --> 01:05:30.128
<v Unidentified speaker>In addition, BOEC has been substantially down in their overtime.

597
01:05:30.416 --> 01:05:34.574
<v Unidentified speaker>We had forecast for them to be down, but they're down even further than we had forecast.

598
01:05:35.222 --> 01:05:43.954
<v Sameer Kanal>Yeah, and I know, I know BOEC is a little bit significantly further along the curve in terms of the way staffing up will diminish overtime usage relative to fire.

599
01:05:44.003 --> 01:05:51.195
<v Sameer Kanal>So I think the answer on both fire and actually all 3, each one fits the correct answer in my opinion of what I'm looking for.

600
01:05:51.244 --> 01:05:52.115
<v Sameer Kanal>So thank you for that.

601
01:05:52.438 --> 01:05:55.349
<v Sameer Kanal>And thanks to the mayor, because I know that's a high priority for you as well.

602
01:05:59.820 --> 01:06:04.416
<v Sameer Kanal>I wanted to just kind I agree with Councilor Pirtle-Guiney's comments about contracts.

603
01:06:04.465 --> 01:06:10.581
<v Sameer Kanal>This is why I've been asking in the administrator's reports for the list of big contracts going forward across the fiscal year.

604
01:06:10.887 --> 01:06:19.380
<v Sameer Kanal>I think this list is what the bureau has offered up in the EMS reductions, but I know that there are some contracts that are bigger than this entire line item.

605
01:06:20.521 --> 01:06:26.188
<v Sameer Kanal>And I'll also just note that we've been told that every city contract effectively has an opt-out if we don't budget for it the following year.

606
01:06:27.088 --> 01:06:32.340
<v Sameer Kanal>Which means we're not obligated to keep existing contracts on the books if we're willing to give up the service.

607
01:06:32.485 --> 01:06:39.152
<v Sameer Kanal>There will be a service impact, you know, obviously in those cases, but just it offers a decision point for council in the future.

608
01:06:39.858 --> 01:06:49.206
<v Sameer Kanal>On Councilor Green's point, I wanted to say I agree on the assessment that our budgets should not be based on carryover assumptions, particularly programmatic carryovers.

609
01:06:49.271 --> 01:06:59.914
<v Sameer Kanal>But I'll note that some of the encumbrance carryovers serve a similar— last year served, and I think I think this is true in the past as well, served a similar purpose to programmatic carryovers.

610
01:07:01.052 --> 01:07:05.208
<v Sameer Kanal>And so I think there are times where an encumbrance carryover is meaningful and good.

611
01:07:06.106 --> 01:07:20.710
<v Sameer Kanal>But this is— I disagreed about the best way to deal with that at the time of the fall TAO, but I do want to just note I agree that at this stage of the cycle, it makes sense to get to that point, at minimum to say we're going to assess the impact Councilor Smith.

612
01:07:20.710 --> 01:07:20.710
<v Sameer Kanal>Thank you, Mr. Mayor.

613
01:07:20.710 --> 01:07:31.969
<v Sameer Kanal>I just want to say that I think it's important that we talk about the impacts of a budget request based off of the budget request, not based off of the budget request and an assumption that hasn't yet been voted on and won't be voted on until November in the fall TAO.

614
01:07:31.969 --> 01:07:43.610
<v Sameer Kanal>And I agree, I wrote this before Councilor Green said it, but Councilors Green and Murillo were right about the problem we're facing with compensation set-aside being diminished.

615
01:07:43.610 --> 01:07:47.608
<v Sameer Kanal>They predicted it back then, and that's worth noting thank you, Mayor.

616
01:07:47.688 --> 01:07:47.963
<v Candace Avalos>Thank you.

617
01:07:48.061 --> 01:07:54.181
<v Sameer Kanal>I did want to ask a clarifier and comment on it with relation to the 0.8 slide.

618
01:07:54.326 --> 01:07:54.664
<v Candace Avalos>It's—.

619
01:07:55.795 --> 01:07:58.402
<v Sameer Kanal>I want to say 9, but I may be completely off.

620
01:08:02.003 --> 01:08:02.050
<v Unidentified speaker>10.

621
01:08:02.726 --> 01:08:04.447
<v Sameer Kanal>It's about the council ops underspending.

622
01:08:05.380 --> 01:08:11.824
<v Sameer Kanal>I wanted to understand, does that presume that we are filling the vacant positions we have?

623
01:08:12.007 --> 01:08:17.373
<v Sameer Kanal>Like, does the idea that there is $0.8 million to potentially use in this way.

624
01:08:17.775 --> 01:08:25.432
<v Sameer Kanal>Does that presume that we're leaving the vacant positions vacant for the rest of the year, or does it presume that we are filling them going forward?

625
01:08:27.846 --> 01:08:28.154
<v Unidentified speaker>I don't know.

626
01:08:28.332 --> 01:08:33.980
<v Unidentified speaker>Well, I don't— I will have to get an answer back to you about what the assumptions are on that one in particular.

627
01:08:34.029 --> 01:08:34.143
<v Jamie Dunphy>Okay.

628
01:08:34.466 --> 01:08:39.046
<v Unidentified speaker>Just know underspending here does not preclude EMS or underspending in other places.

629
01:08:39.355 --> 01:08:40.588
<v Unidentified speaker>It's not exclusively personnel.

630
01:08:41.293 --> 01:08:48.231
<v Sameer Kanal>Sure, but there are vacant positions in Council Ops right now, and I know you're extrapolating from the 7th accounting period, right?

631
01:08:48.744 --> 01:09:01.610
<v Sameer Kanal>And I wanted to know if that extrapolation presumed status quo where one position was partially filled for the year and one has not been filled the whole year so far, or if it presumed that we are keeping the status quo but filling the 2 positions.

632
01:09:02.186 --> 01:09:10.488
<v Jonas Biery>Councilor, we can follow up with you because it would essentially assume, in conjunction with working with the Council Ops manager, their expectations around that hiring.

633
01:09:10.537 --> 01:09:15.926
<v Jonas Biery>And so we don't know at this table what that is, but we can follow up with you on what the expectation is.

634
01:09:15.990 --> 01:09:25.454
<v Sameer Kanal>Yeah, I mean, I think my broader point is that if council approved a budget for particular roles in council operations, we should be assuming that those are going to be filled because that's something we already voted on.

635
01:09:25.936 --> 01:09:26.994
<v Sameer Kanal>And I agree with Councilor Green.

636
01:09:27.060 --> 01:09:28.904
<v Sameer Kanal>I know Councilor Smith has brought this up in the past.

637
01:09:30.011 --> 01:09:35.144
<v Sameer Kanal>We don't want to vote on something that's— and then say that's contingent upon voting on the same thing again later.

638
01:09:35.706 --> 01:09:38.430
<v Sameer Kanal>And then potentially a portion of it is on a third part later.

639
01:09:39.872 --> 01:09:47.868
<v Sameer Kanal>So, uh, with the exception of that caveat, your— this slide seems like a good place to start, um, and I, I appreciate you bringing that forward.

640
01:09:48.525 --> 01:10:06.715
<v Sameer Kanal>Um, I, I did want to note, uh, you— given that I'm about to talk about the Harbor Reserve, that there was a little bit of a red flag there on Fire not getting a boat, because I imagine that's all in my district, uh, the, the most of the boats, I think, are— there's some in D4 as well and D1, but most of the fire boats relate to D2.

641
01:10:06.764 --> 01:10:08.788
<v Sameer Kanal>So a little bit of an alarm there.

642
01:10:09.141 --> 01:10:12.948
<v Sameer Kanal>I want to get that boat repaired up in Hayden Island, so, or replaced.

643
01:10:13.029 --> 01:10:16.176
<v Sameer Kanal>But that's my pivot, my segue.

644
01:10:16.320 --> 01:10:17.838
<v Sameer Kanal>Can you tell us more about the Harbor Reserve Fund?

645
01:10:23.405 --> 01:10:27.452
<v Jonas Biery>Yeah, so we talked a little bit about this in the fall as well.

646
01:10:29.184 --> 01:10:39.511
<v Jonas Biery>And I'll, as I think I said then, every time this conversation comes up, attorneys start like banging the hammers in the back of my head to be mindful of what I say.

647
01:10:39.609 --> 01:10:43.765
<v Jonas Biery>But because that is still a legal negotiation that's underway.

648
01:10:44.604 --> 01:10:52.478
<v Jonas Biery>But essentially, you know, this city anticipates some type of obligation related to harbor cleanup activities, cleanup and mitigation activities.

649
01:10:54.408 --> 01:10:54.532
<v Olivia Clark>Okay.

650
01:10:55.327 --> 01:10:58.042
<v Jonas Biery>That may be borne by different areas within the city, right?

651
01:10:58.270 --> 01:11:00.528
<v Jonas Biery>To the extent it's stormwater-related or has other connectivity.

652
01:11:01.449 --> 01:11:17.787
<v Jonas Biery>A number of years ago, I don't remember exactly what year it was, but the city started putting some dollars kind of in that reserve to anticipate a nest egg to help pay for some of those ultimate liability when those costs payouts, whatever form that takes, do start to materialize.

653
01:11:18.242 --> 01:11:21.686
<v Jonas Biery>And so that's what's sitting in that fund is some of those general fund contributions that have been put in.

654
01:11:21.800 --> 01:11:21.864
<v Dan Ryan>Okay.

655
01:11:25.529 --> 01:11:37.261
<v Sameer Kanal>So I wouldn't be— I don't say this in a negative way, but effectively draining this would require the future year replenishment and we'd be, without saying it in a negative way, we would be kicking the can over the road.

656
01:11:37.310 --> 01:11:38.484
<v Jonas Biery>Yeah, Councilor, that's correct.

657
01:11:38.532 --> 01:11:50.385
<v Jonas Biery>I mean, it's a little, you know, we've sort of put it on as a possibility because it's not the type of thing where we anticipate we will have to replenish it next year when we know we have a problem.

658
01:11:50.992 --> 01:11:54.292
<v Jonas Biery>We might have some different flexibility about when that replenishes.

659
01:11:54.358 --> 01:11:55.335
<v Jonas Biery>But yeah, you're absolutely right.

660
01:11:55.399 --> 01:12:01.072
<v Jonas Biery>It definitely just kicks that expectation that at some point that bill is going to become due, so to speak.

661
01:12:01.552 --> 01:12:06.328
<v Jonas Biery>And we either have money sitting in reserve to cover that or we don't and we have to find it.

662
01:12:06.376 --> 01:12:10.189
<v Jonas Biery>And frankly, that's true of most reserves have that sort of same dynamic in it.

663
01:12:10.944 --> 01:12:19.659
<v Jonas Biery>But because this is one where we don't anticipate that use potentially for another couple years, couple, 3 years, And we have probably some ability to build it back up.

664
01:12:21.170 --> 01:12:24.279
<v Jonas Biery>It's more feasible than other options.

665
01:12:24.279 --> 01:12:26.399
<v Jonas Biery>Does that answer your question?

666
01:12:26.399 --> 01:12:26.840
<v Sameer Kanal>That does.

667
01:12:26.840 --> 01:12:28.229
<v Sameer Kanal>It looks like Ruth wants to say something.

668
01:12:28.260 --> 01:12:33.579
<v Unidentified speaker>Just one other quick thing to add to that is there still is an ongoing contribution going into the reserve.

669
01:12:33.579 --> 01:12:39.300
<v Unidentified speaker>So this would be like a one-time drawdown, but it would still, it would maintain that ongoing general fund contribution.

670
01:12:39.300 --> 01:12:39.460
<v Olivia Clark>So that's helpful.

671
01:12:39.460 --> 01:12:40.880
<v Sameer Kanal>It's super helpful to know.

672
01:12:40.880 --> 01:12:42.939
<v Sameer Kanal>Yeah, I appreciate that a lot.

673
01:12:42.939 --> 01:13:00.079
<v Sameer Kanal>And I think that's the first place I wanna look, although I will take the chance again and to note that the, um, the general fund conversation we were having in the morning work session is basically the $4 million up here at the top of, of slide, uh, 11, and I think highlights the importance of what has been said here.

674
01:13:00.627 --> 01:13:07.984
<v Sameer Kanal>Um, the only thing that I think is maybe not on here that I'm aware of— there may be more that I'm not aware of as places to look— is really those other contracts.

675
01:13:08.050 --> 01:13:13.658
<v Sameer Kanal>And I still would like to have that conversation, but I really appreciate the, the starting point that you've given us here.

676
01:13:14.027 --> 01:13:26.958
<v Sameer Kanal>Um, I will just note that there are some lines on here that are by design backloaded, and so I think the projections presume a higher level of potential savings than actually exist.

677
01:13:27.327 --> 01:13:34.601
<v Sameer Kanal>I know, for example, in my office, um, we know that our workload is significantly higher at the end of the fiscal year because of the budget.

678
01:13:35.099 --> 01:13:41.710
<v Sameer Kanal>And so I think taking past projections, like, there, there will need to be conversations about how much of that is actually real, how much is not.

679
01:13:41.710 --> 01:13:47.350
<v Sameer Kanal>I imagine that's the case for at least 4 other lines on here, as 3 other lines on here, uh, as well.

680
01:13:47.350 --> 01:13:48.529
<v Sameer Kanal>So I just wanted to flag that.

681
01:13:48.630 --> 01:13:49.590
<v Sameer Kanal>But thank you, Council President.

682
01:13:49.590 --> 01:13:50.510
<v Jonas Biery>Yeah, and thank you, Councilor.

683
01:13:50.510 --> 01:13:51.079
<v Jonas Biery>That's a great note.

684
01:13:51.130 --> 01:13:53.489
<v Jonas Biery>Uh, no, you know, recognized, noted.

685
01:13:53.489 --> 01:13:56.710
<v Jonas Biery>I mean, that's often the— that's the case for many, um, bureaus.

686
01:13:56.710 --> 01:14:03.189
<v Jonas Biery>I mean, that's another reason why we didn't want to make the decision, put it as a sort of formal recognition, because we need Council's input on that specifically.

687
01:14:03.529 --> 01:14:04.729
<v Jonas Biery>Um, that is reality.

688
01:14:04.729 --> 01:14:10.918
<v Jonas Biery>Um, otherwise places too where there's that nuanced spending throughout the fiscal year and sometimes escalation at the end of the year.

689
01:14:10.966 --> 01:14:15.250
<v Jonas Biery>So I wanna make sure we make space for that conversation with regards to this line item as well.

690
01:14:16.100 --> 01:14:18.057
<v Unidentified speaker>And just one other thing to note on that.

691
01:14:18.202 --> 01:14:31.469
<v Unidentified speaker>I think these numbers that we got from the finance leads have been vetted and we attempted to ensure that they accounted for those end-of-year costs.

692
01:14:31.533 --> 01:14:33.297
<v Unidentified speaker>So it's not just like a straight-line projection.

693
01:14:33.426 --> 01:14:34.582
<v Unidentified speaker>We have a straight-line projection.

694
01:14:34.630 --> 01:14:39.953
<v Unidentified speaker>You'd get a very and so we worked— this isn't like just CBO doing this by ourselves.

695
01:14:40.067 --> 01:14:51.774
<v Unidentified speaker>We worked directly with the finance managers and they provided all of the projections through the end of the year on all of these, and in many cases doing that kind of position-level analysis.

696
01:14:52.255 --> 01:15:06.688
<v Unidentified speaker>I, you know, obviously the, you know, we pulled out the council one because that's obviously a slightly different conversation, but for other bureaus outside of council, I don't want you to think that we were just like, oh, okay, all the vacant positions done, like, here's your number.

697
01:15:06.768 --> 01:15:14.529
<v Unidentified speaker>We did actually, like, do a pretty thorough job working with all of them to try to do those projections as best we can, given that it's AP-7.

698
01:15:14.707 --> 01:15:14.867
<v Angelita Morillo>Yeah.

699
01:15:15.203 --> 01:15:16.439
<v Sameer Kanal>This is going to sound like a negative.

700
01:15:16.487 --> 01:15:17.738
<v Sameer Kanal>I actually mean it as a positive.

701
01:15:18.314 --> 01:15:27.118
<v Sameer Kanal>It's never that— I know it's never that simple with the city budget, but also I know that you do a lot to take that modeling, and I appreciate the clarity because obviously ours is different.

702
01:15:27.872 --> 01:15:30.231
<v Sameer Kanal>In terms of, we haven't weighed in on that yet.

703
01:15:30.826 --> 01:15:31.628
<v Sameer Kanal>Thank you, Council President.

704
01:15:31.708 --> 01:15:31.900
<v Jamie Dunphy>Thank you.

705
01:15:31.949 --> 01:15:43.167
<v Unidentified speaker>Just real quick, as an example of that, we got information about the council ops underspending, and that does include— that number includes projected hiring of 2 positions starting in mid-April.

706
01:15:43.230 --> 01:15:48.221
<v Unidentified speaker>So like, that's an example of we're assuming that 2 positions are going to start in April.

707
01:15:48.286 --> 01:15:49.024
<v Sameer Kanal>We'll have 0.8.

708
01:15:49.841 --> 01:15:50.452
<v Unidentified speaker>And still have 0.8.

709
01:15:50.500 --> 01:15:50.917
<v Unidentified speaker>Exactly.

710
01:15:50.981 --> 01:15:53.003
<v Unidentified speaker>So like, so that's the same for the council numbers.

711
01:15:53.051 --> 01:15:59.440
<v Unidentified speaker>The council numbers is based off of what your offices have communicated with, um, staff about projected spending through the end of the year.

712
01:15:59.780 --> 01:16:04.353
<v Sameer Kanal>Okay, I, I know we haven't given that information, so I, I think that's separate.

713
01:16:04.402 --> 01:16:08.127
<v Sameer Kanal>But for Council Ops, council has voted on the, the list, so I think that's fair.

714
01:16:08.207 --> 01:16:18.219
<v Sameer Kanal>And I'm— that's very good news because that means that theoretically this entire $11.4 million on slide 10 is available, and I think a good place to start the conversation.

715
01:16:20.143 --> 01:16:24.173
<v Jamie Dunphy>Thank you, Councilor thank you, Mr.

716
01:16:24.253 --> 01:16:24.720
<v Steve Novick>President.

717
01:16:24.800 --> 01:16:37.547
<v Steve Novick>This frankly might be just my bad memory, but this morning I thought that when the pot of housing money that was easier to shift to the general fund was the, quote, short-term rental 2%, $8.6 million.

718
01:16:38.207 --> 01:16:40.487
<v Steve Novick>And I forgot my notes on my desk.

719
01:16:40.551 --> 01:16:41.240
<v Steve Novick>I might just be wrong.

720
01:16:41.354 --> 01:16:50.070
<v Steve Novick>But because I thought that, I was surprised to see the short-term rental 0 to 6% 0 to 60 pot as being the pot referred to for this $4 million.

721
01:16:50.680 --> 01:16:56.009
<v Unidentified speaker>I'm— I will triple check, but I'm pretty sure it's the 0 to 60 subfund.

722
01:16:56.136 --> 01:17:01.930
<v Unidentified speaker>I have a hard time because the names are the same, but, uh, we will triple check and confirm with you, but I'm pretty sure that's the one.

723
01:17:02.203 --> 01:17:08.029
<v Jonas Biery>Yeah, and I'll acknowledge, Councilor, I heard the same thing this morning and had a question about it because that was not the way I understood it.

724
01:17:08.078 --> 01:17:11.158
<v Jonas Biery>The way I understood it is it's the 0 to 60 as described here.

725
01:17:11.689 --> 01:17:18.996
<v Steve Novick>Okay, so and again, does that mean that theoretically we could take $11 million and put it into the general fund, the whole zero to 60 thing?

726
01:17:20.895 --> 01:17:33.621
<v Jonas Biery>I think technically I'd wanna be— and then my caution, Councilor, is I wanna make sure that as the Housing Bureau's looking at those spending plans, that there aren't pieces of that that might have some firmer expectations around it.

727
01:17:33.685 --> 01:17:46.787
<v Jonas Biery>I think legally that's probably true, but I wanna make sure before I say that definitively that there's not bits of that that might have some other intended commitments that would have real trade-offs outside future thank you.

728
01:17:48.635 --> 01:17:49.614
<v Jamie Dunphy>Thank you, Councilor Novick.

729
01:17:50.064 --> 01:17:51.688
<v Jamie Dunphy>Councilor Clark, Vice President Clark.

730
01:17:51.847 --> 01:17:53.422
<v Olivia Clark>Thank you, President Dunphy.

731
01:17:54.644 --> 01:18:06.850
<v Olivia Clark>Just to follow up on that same vein, on page 11, the housing investment shortfall, how did you come to $4 million as opposed to the full $6.6 million?

732
01:18:07.235 --> 01:18:08.331
<v Jonas Biery>Yeah, Councilor, great question.

733
01:18:08.846 --> 01:18:13.644
<v Jonas Biery>I knew that there was a 3-point-something number that had been spoken and a 5-point-something number that had been spoken.

734
01:18:15.007 --> 01:18:16.677
<v Jonas Biery>And 4 was right in the middle.

735
01:18:16.903 --> 01:18:19.247
<v Angelita Morillo>Okay, it's very scientific.

736
01:18:19.328 --> 01:18:30.618
<v Jonas Biery>Okay, and, and to be clear, um, I mean, I'm joking a little bit, but, um, that's why we picked that number, but recognizing it is somewhat, somewhat scalable, um, you know, to, to fill however we choose.

737
01:18:30.890 --> 01:18:35.387
<v Olivia Clark>Okay, it just seemed like it'd be a lot easier here as an exercise to just do the full 6.6.

738
01:18:35.533 --> 01:18:43.176
<v Olivia Clark>But in any event, and I, um, also, um, echo, uh, Councilor Kanal's comment about council underspending.

739
01:18:43.275 --> 01:18:48.002
<v Olivia Clark>I don't remember being asked about this, but I think this is an overestimation, definitely.

740
01:18:49.097 --> 01:18:52.431
<v Olivia Clark>Let's see, I think I have one other question.

741
01:18:52.689 --> 01:18:56.699
<v Olivia Clark>Oh, on the Harbor Reserve, does that completely empty it?

742
01:18:58.675 --> 01:19:03.386
<v Unidentified speaker>No, we can get the total number, but there's more than that in there.

743
01:19:03.515 --> 01:19:15.293
<v Unidentified speaker>That was just the estimated amount of general fund excess but the Harbor Reserve combines multiple different sort of colors of money into the reserve pot.

744
01:19:15.390 --> 01:19:17.332
<v Unidentified speaker>So there's significantly more than that.

745
01:19:17.927 --> 01:19:21.621
<v Jonas Biery>And yeah, and it's a good observation that, yeah, this is just the general fund portion.

746
01:19:21.716 --> 01:19:34.240
<v Jonas Biery>And there's, you know, a couple ways to think about this too, because on this slide, the $15.2 is more than needed to fill the gap that, you know, a couple of these, whether it's the Housing Investment Fund or CORF, could be used as sort of balancers.

747
01:19:34.916 --> 01:19:46.274
<v Jonas Biery>Right, to say, well, we're just going to take whatever amount, we're going to set these other amounts, and then use one of these line items, for example, to say, well, whatever is needed to continue getting to zero balance, net zero balance.

748
01:19:46.820 --> 01:19:55.747
<v Jonas Biery>And so I know there was an iteration where we did this where we thought of the CORF in that way, but we could certainly, you know, there's some of these are scalable in different ways.

749
01:19:55.845 --> 01:19:56.814
<v Olivia Clark>Just curious about it.

750
01:19:56.975 --> 01:20:02.489
<v Olivia Clark>And, but I appreciate that you gave us options or you didn't just do one 6.6.

751
01:20:03.838 --> 01:20:06.873
<v Olivia Clark>And I had actually a question for Councilor Kanal, if you don't mind.

752
01:20:07.292 --> 01:20:12.221
<v Olivia Clark>When you're talking about the other contracts, which contracts are you talking about?

753
01:20:13.170 --> 01:20:17.265
<v Sameer Kanal>I think I'm going to hold off on naming specific ones until the list comes out.

754
01:20:17.408 --> 01:20:17.681
<v Loretta Smith>Oh, okay.

755
01:20:17.747 --> 01:20:21.023
<v Sameer Kanal>But I know that there are— I've referred to it.

756
01:20:21.103 --> 01:20:34.801
<v Sameer Kanal>I'll give you the sort of descriptive term, which is there's contracts we have for people who think us, uh, who write reports that frankly historically have not been read by anybody in this chamber, but only by operational staff in the bureaus.

757
01:20:35.377 --> 01:20:42.077
<v Sameer Kanal>Um, that kind of contracting I think is, is worth looking at unless we're committing to actually read the reports and act on them.

758
01:20:42.284 --> 01:20:45.170
<v Sameer Kanal>I don't think that we should necessarily go pay somebody to write it for us.

759
01:20:45.954 --> 01:20:50.185
<v Sameer Kanal>Um, I think that's the first place I'd talk about, and we talk about this in budget savings quite a bit.

760
01:20:50.618 --> 01:20:50.779
<v Loretta Smith>Okay.

761
01:20:51.019 --> 01:20:55.668
<v Sameer Kanal>My D2 colleagues heard me talk about this okay, great.

762
01:20:55.780 --> 01:20:56.457
<v Olivia Clark>I was just curious.

763
01:20:56.520 --> 01:20:56.890
<v Olivia Clark>Thank you.

764
01:20:57.083 --> 01:20:59.224
<v Olivia Clark>Thank you for today's presentation.

765
01:20:59.353 --> 01:21:00.381
<v Olivia Clark>Appreciate it.

766
01:21:01.025 --> 01:21:02.055
<v Jamie Dunphy>Thank you, Vice President Clark.

767
01:21:02.750 --> 01:21:03.234
<v Jamie Dunphy>Councilor Morillo.

768
01:21:04.787 --> 01:21:06.146
<v Angelita Morillo>Thank you, Council President.

769
01:21:07.052 --> 01:21:21.444
<v Angelita Morillo>I appreciate this presentation and the work that's been put into it, but I do want to express some frustration, and I just regarding the feasibility and the service reductions that we're going to have.

770
01:21:21.529 --> 01:21:21.729
<v Dan Ryan>Thank you.

771
01:21:21.729 --> 01:21:21.729
<v Angelita Morillo>Councilor Smith.

772
01:21:21.729 --> 01:21:30.140
<v Angelita Morillo>I'm very disappointed in the budget that we have before us because I think choices that were made before are going to make it a lot harder for the FY 2026-27 budget.

773
01:21:30.829 --> 01:21:38.810
<v Angelita Morillo>In the fall, I offered an amendment that would've required a real look at service reductions and given us time to actually enact them.

774
01:21:38.810 --> 01:21:41.909
<v Angelita Morillo>And the amendment would've put us in a very different position today.

775
01:21:42.289 --> 01:21:46.439
<v Angelita Morillo>Instead of an $18 million shortfall, we would have a $7 million shortfall.

776
01:21:46.770 --> 01:21:55.390
<v Angelita Morillo>And make no mistake, We would've still had that $7 million to find, but it would've positioned us a lot better to meet the needs that we have next year.

777
01:21:56.000 --> 01:21:58.841
<v Angelita Morillo>And so I don't look forward to service reductions.

778
01:21:58.889 --> 01:22:01.265
<v Angelita Morillo>I don't think any of us up here or out there do.

779
01:22:02.661 --> 01:22:05.918
<v Angelita Morillo>And we have structural deficits that need to be addressed ongoing.

780
01:22:06.192 --> 01:22:10.317
<v Angelita Morillo>And I worry that we could find ourselves in a similar situation next fall.

781
01:22:10.396 --> 01:22:12.563
<v Angelita Morillo>So I guess this is just my—.

782
01:22:12.659 --> 01:22:13.189
<v Elana Pirtle-Guiney>Thank you.

783
01:22:13.895 --> 01:22:25.890
<v Angelita Morillo>At this point, firm ask that we really have a more proactive approach and that we work on it together as the legislative and administrative arm so that we can be less reactive moving forward.

784
01:22:25.953 --> 01:22:34.817
<v Angelita Morillo>Because I think these cuts are going to be very painful, and had my amendment passed, it would have been less painful than it is right now.

785
01:22:35.251 --> 01:22:36.823
<v Angelita Morillo>And I just had to state my piece on that.

786
01:22:36.889 --> 01:22:37.675
<v Angelita Morillo>So thank you.

787
01:22:38.559 --> 01:22:39.345
<v Jamie Dunphy>Thank you, Councilor Morillo.

788
01:22:41.140 --> 01:22:41.868
<v Jamie Dunphy>Councilor Green.

789
01:22:44.408 --> 01:22:46.043
<v Mitch Green>Thank you, Mr. President.

790
01:22:46.270 --> 01:22:48.925
<v Mitch Green>So I have a question about— I'm just trying to think ahead to the next step.

791
01:22:49.310 --> 01:22:54.296
<v Mitch Green>Like, we're going to be in the budget, we're going to get through this, we're going to adopt something, it'll be fine.

792
01:22:54.587 --> 01:22:58.917
<v Mitch Green>Well, maybe it won't be fine, but we will solve this very specific legislative action.

793
01:23:00.085 --> 01:23:12.386
<v Mitch Green>And then we're going to go into this budget and we will have to consider an over-expenditure probably very near to the end of the fiscal year, if I recall correctly.

794
01:23:14.921 --> 01:23:23.649
<v Mitch Green>If a bureau wants to carry something forward, is that OEO the place to do it if we want to be very explicit about what it is we're going to adopt in the '26-'27?

795
01:23:25.467 --> 01:23:50.149
<v Unidentified speaker>So, yeah, I mean, I'm sort of generally cautioning against carrying over as a practice because basically what we do when we carry something over is we deappropriate the funding in the current fiscal year, we add it to the adopted budget, and we recognize the revenue as beginning fund balance to back that expense in the adopted budget.

796
01:23:50.889 --> 01:24:04.048
<v Unidentified speaker>I would say, you know, it's probably more prudent to just allow those funds to fall to balance rather than deappropriating them in the given— in the current fiscal year and recognizing them as beginning fund balance.

797
01:24:04.627 --> 01:24:05.798
<v Unidentified speaker>Given how tight we are.

798
01:24:06.248 --> 01:24:15.720
<v Unidentified speaker>Normally there's enough sort of things coming out in the wash that it's not a concern to deappropriate the money and put it in as beginning fund balance.

799
01:24:15.784 --> 01:24:17.728
<v Unidentified speaker>We're fairly confident that it's going to show up.

800
01:24:18.289 --> 01:24:26.381
<v Unidentified speaker>But I just, I worry even in June, you know, there's still, there's actually 16 accounting periods, right?

801
01:24:26.476 --> 01:24:33.765
<v Unidentified speaker>That like, I worry in given this fiscal year about about having that practice available at all.

802
01:24:34.006 --> 01:24:34.150
<v Sameer Kanal>Yeah.

803
01:24:34.198 --> 01:24:37.201
<v Unidentified speaker>So that's my kind of advice.

804
01:24:37.394 --> 01:24:45.997
<v Unidentified speaker>Obviously, council can choose to do it if there are discrete things where there's like truly underspending, we're confident it's there.

805
01:24:46.623 --> 01:24:57.748
<v Unidentified speaker>And then yeah, all we're doing in the OEO at that point is sort of cleaning up the current fiscal year and deappropriating it just to show this is where, this is kind of what happened to clean up the record.

806
01:24:58.327 --> 01:24:58.488
<v Mitch Green>Yeah.

807
01:24:58.568 --> 01:25:08.412
<v Unidentified speaker>But, you know, from a balancing standpoint, it makes me a little uncomfortable this fiscal year given the situation that we're in.

808
01:25:08.701 --> 01:25:09.904
<v Mitch Green>I appreciate that answer.

809
01:25:09.984 --> 01:25:28.259
<v Mitch Green>And colleagues, Mr. Mayor, the City Manager, the reason I'm asking that is because I would like this budget to be the one where we never again assume that we are going to do these encumbrance carryovers that we will sort of just pay for with beginning fund balance in the next fall 2024.

810
01:25:28.372 --> 01:25:30.877
<v Mitch Green>I think at some point you got to rip the Band-Aid off.

811
01:25:30.943 --> 01:25:31.457
<v Mitch Green>This is the year.

812
01:25:32.389 --> 01:25:46.998
<v Mitch Green>I recognize, however, we had some conversations, Councilor Kanal, specifically related to public safety, that there were really crucial reasons why that contract maybe had been paid for in '24-'25.

813
01:25:47.860 --> 01:25:49.277
<v Mitch Green>It's still in the phase of being executed.

814
01:25:49.471 --> 01:25:49.912
<v Mitch Green>I get that.

815
01:25:52.015 --> 01:25:53.449
<v Mitch Green>But it seems that should be the exception.

816
01:25:53.498 --> 01:25:53.873
<v Mitch Green>I think that's a good point.

817
01:25:54.692 --> 01:25:55.649
<v Mitch Green>Rather than the rule.

818
01:25:55.908 --> 01:25:58.731
<v Mitch Green>And I think if we— if we met— it's March 5th.

819
01:25:59.347 --> 01:26:09.333
<v Mitch Green>If we start thinking that way on March 5th, I think we can enable our bureaus to say, give me the very short list of things that absolutely are critical.

820
01:26:09.462 --> 01:26:11.786
<v Mitch Green>They're going to set us up for this 5-year get-well plan.

821
01:26:12.448 --> 01:26:17.622
<v Mitch Green>Let's think about appropriating them in the OEO ahead of it.

822
01:26:17.768 --> 01:26:24.840
<v Mitch Green>And then that way, when we adopt the budget, council knows what we're that's just a suggestion.

823
01:26:26.251 --> 01:26:33.692
<v Mitch Green>I know of no other way other than saying everything falls to balance to control for that, and I think that might be too much of a blunt instrument.

824
01:26:33.916 --> 01:26:44.243
<v Mitch Green>So I'm just offering in the spirit of, as we got into this cycle, I said I would try to lay as much on the table as possible so we're not reacting to the mayor's budget on a very short timeline.

825
01:26:44.436 --> 01:26:46.007
<v Mitch Green>I'm messaging now colleagues to see if they have any questions.

826
01:26:46.073 --> 01:26:46.377
<v Candace Avalos>Thank you.

827
01:26:46.489 --> 01:26:50.920
<v Mitch Green>That's the direction I think I'd like to go, and I would like your thought partnership in getting, in getting there.

828
01:26:51.390 --> 01:26:52.529
<v Unidentified speaker>Thanks.

829
01:26:52.529 --> 01:26:55.250
<v Jamie Dunphy>Thank you, Councilor Green.

830
01:26:55.250 --> 01:26:58.560
<v Jamie Dunphy>Looking to the queue, seeing no one else.

831
01:26:59.189 --> 01:27:01.329
<v Jonas Biery>Council President, uh, appreciate that.

832
01:27:01.329 --> 01:27:09.270
<v Jonas Biery>I just wanted to correct one thing real quick, that I did look back, uh, and have some dialogue that it is Councilor Novick, the 2%, uh, is the flexible bucket.

833
01:27:09.270 --> 01:27:12.390
<v Jonas Biery>So that's the $8.6 million, I think, is the, uh, is the amount there.

834
01:27:12.390 --> 01:27:15.996
<v Jonas Biery>So just wanted to correct that while I had a quick minute, that it's It's not the 0 to 60 shown here.

835
01:27:16.060 --> 01:27:16.966
<v Jonas Biery>It is in fact a 2%.

836
01:27:17.596 --> 01:27:17.887
<v Unidentified speaker>Sorry.

837
01:27:18.713 --> 01:27:20.493
<v Steve Novick>Damn, you just cost the general fund $3.5 million.

838
01:27:22.131 --> 01:27:22.485
<v Olivia Clark>My bad.

839
01:27:23.359 --> 01:27:23.974
<v Jamie Dunphy>Councilor Kanal.

840
01:27:25.283 --> 01:27:25.654
<v Sameer Kanal>Thanks.

841
01:27:26.011 --> 01:27:29.454
<v Sameer Kanal>I agree with the broad thrust of everything Councilor Green said.

842
01:27:29.502 --> 01:27:36.993
<v Sameer Kanal>I'm not sure about the OEO specifically, but I do understand that that is the thing you do before the fiscal year starts.

843
01:27:37.447 --> 01:27:39.618
<v Sameer Kanal>I agree also that we should retain some flexibility.

844
01:27:39.715 --> 01:27:40.444
<v Sameer Kanal>I think there are good carryovers.

845
01:27:40.568 --> 01:27:44.899
<v Sameer Kanal>There's not maybe as many, um, as have historically been used.

846
01:27:44.963 --> 01:27:59.002
<v Sameer Kanal>But I think the broader— the, the broader idea is that when people are assessing a budget, that we are looking at the dollar amount in the eventual adopted budget as the thing that will guide your service provision.

847
01:27:59.067 --> 01:27:59.148
<v Olivia Clark>Right.

848
01:27:59.708 --> 01:28:01.282
<v Sameer Kanal>And without adding in an assumption.

849
01:28:01.345 --> 01:28:07.523
<v Sameer Kanal>And if there is an assumption, um, then that's a separate service that comes with a separate pot of money through a carryover.

850
01:28:07.587 --> 01:28:15.309
<v Sameer Kanal>I think as long as that communication The mechanism is whatever it needs to be, but I think that's meeting the underlying need there.

851
01:28:15.520 --> 01:28:31.207
<v Sameer Kanal>I did have one question that is not on here, but I need to bring up as someone who was— we talked a lot about the 9.5% reduction, the first year of the 20% reduction, those 7 streams of businesses.

852
01:28:31.724 --> 01:28:41.309
<v Sameer Kanal>And we heard a little while ago, a few months now, 2 months now, Now, that the projected savings associated with that had not fully manifested.

853
01:28:42.350 --> 01:28:58.690
<v Sameer Kanal>And my questions relate to, A, if that's already built in here, how much we're talking about, and B, how that's going to affect what happens next in terms of— is this part of the 1.2?

854
01:28:59.800 --> 01:29:00.731
<v Sameer Kanal>Is that what you're talking about?

855
01:29:00.845 --> 01:29:00.988
<v Jamie Dunphy>Yes.

856
01:29:01.100 --> 01:29:02.511
<v Sameer Kanal>Yeah, I'll let you finish.

857
01:29:02.640 --> 01:29:03.073
<v Candace Avalos>It's okay.

858
01:29:03.137 --> 01:29:03.506
<v Olivia Clark>No, it's fine.

859
01:29:03.603 --> 01:29:03.876
<v Unidentified speaker>Finish.

860
01:29:04.100 --> 01:29:04.550
<v Candace Avalos>You can finish.

861
01:29:04.630 --> 01:29:08.881
<v Sameer Kanal>So yeah, I think the— it's disappointing.

862
01:29:08.930 --> 01:29:16.905
<v Sameer Kanal>As someone who did not support the reduction in this way, I nonetheless believe that if council voted to do it, we should have seen it.

863
01:29:17.885 --> 01:29:21.190
<v Sameer Kanal>And I'm a little bit disappointed to not see that conversation.

864
01:29:21.350 --> 01:29:25.764
<v Sameer Kanal>I think it was a bit of a blunt instrument, but I think that was part of its intent.

865
01:29:26.806 --> 01:29:28.154
<v Sameer Kanal>And so I'm trying to just understand that.

866
01:29:28.652 --> 01:29:30.591
<v Sameer Kanal>I know it's not in your hands.

867
01:29:30.896 --> 01:29:38.173
<v Sameer Kanal>You're not the bureau directors, you're not the DCA, so I don't mean to imply that, but if you could just get a little more, give us a little more information on that.

868
01:29:38.511 --> 01:29:38.975
<v Unidentified speaker>Sure.

869
01:29:39.136 --> 01:29:39.649
<v Unidentified speaker>Yeah.

870
01:29:39.970 --> 01:29:52.761
<v Unidentified speaker>So the placeholder reduction that was implemented in the budget of the 10% was about, I think, $3.7 million of general fund in fiscal year '25-'26.

871
01:29:53.162 --> 01:29:54.509
<v Unidentified speaker>That reduction is there, right?

872
01:29:54.862 --> 01:29:55.037
<v Olivia Clark>Right.

873
01:29:55.262 --> 01:29:57.782
<v Unidentified speaker>It's out of the budget side of the equation.

874
01:29:59.097 --> 01:30:10.412
<v Unidentified speaker>And so to the extent that those positions are still filled and they're generating costs, it is in the forecast already.

875
01:30:10.909 --> 01:30:27.407
<v Unidentified speaker>I don't have a breakout of exactly which of those positions that are potentially in those buckets are still filled versus vacant right now, but it is already I assumed any kind of overspending compared to what the plan was is already in the 1.2.

876
01:30:28.581 --> 01:30:38.176
<v Unidentified speaker>The ones, it is still the case that the only function that's really been effectively fully implemented is communications.

877
01:30:38.851 --> 01:30:40.319
<v Unidentified speaker>And so the rest of them are not there.

878
01:30:40.479 --> 01:30:42.980
<v Unidentified speaker>Now, has there been attrition related to it?

879
01:30:43.046 --> 01:30:43.448
<v Unidentified speaker>Probably.

880
01:30:43.529 --> 01:30:55.167
<v Unidentified speaker>But the like actual realignment and decisions have only been, and implemented, have only been done for communications so far.

881
01:30:55.653 --> 01:30:58.671
<v Sameer Kanal>So if that's, I don't know if this is one-to-one.

882
01:30:58.881 --> 01:31:06.225
<v Sameer Kanal>So if we're looking at it was supposed to generate $3.7 million of savings, we're seeing a $1.2 overspend.

883
01:31:06.274 --> 01:31:14.667
<v Sameer Kanal>That means that it resulted in a $2.5 million roughly reduction in spending when it was projected to do $3.7 million.

884
01:31:15.199 --> 01:31:15.588
<v Sameer Kanal>Is that—.

885
01:31:16.009 --> 01:31:17.756
<v Unidentified speaker>I would not draw that conclusion.

886
01:31:17.886 --> 01:31:28.989
<v Unidentified speaker>Again, there's— the hard thing is that there's just a lot going on in these numbers because they're just a net overspend or underspend number.

887
01:31:29.184 --> 01:31:38.385
<v Unidentified speaker>And so it's the 10%, it's the not having compensation set aside, it's police and fire overtime and revenues coming in high or low.

888
01:31:38.515 --> 01:31:40.545
<v Unidentified speaker>So we can get you certainly more details on that.

889
01:31:40.658 --> 01:31:40.917
<v Elana Pirtle-Guiney>Thank you.

890
01:31:41.029 --> 01:31:44.722
<v Unidentified speaker>That specifically, we'd have to do a little bit of analysis to try to get at it.

891
01:31:45.140 --> 01:31:49.814
<v Unidentified speaker>But I wouldn't— I don't think we can draw that conclusion from the numbers we have here.

892
01:31:50.135 --> 01:31:50.617
<v Sameer Kanal>That's fair.

893
01:31:51.564 --> 01:31:54.536
<v Sameer Kanal>And I don't need it right now, so I appreciate that.

894
01:31:54.631 --> 01:32:05.858
<v Sameer Kanal>But it is helpful to understand because I— and I'll be honest, I put up an amendment that had a similar— it didn't pass, but it had a similar approach to it of achieve a reduction in this way.

895
01:32:05.938 --> 01:32:14.786
<v Sameer Kanal>And I think there may be something to learn In terms of being more granular instead of a blunter instrument, to use a colleague's words on a different item.

896
01:32:15.829 --> 01:32:17.532
<v Sameer Kanal>And that's for us up here.

897
01:32:17.595 --> 01:32:32.818
<v Sameer Kanal>But I think also as part of the decision-making process, it might be helpful to have for this year's budget an understanding of what last— the current fiscal year's budget that we adopted last June, how successful that could have been versus what ended up happening.

898
01:32:33.331 --> 01:32:35.114
<v Sameer Kanal>So so thank you, Council President.

899
01:32:35.179 --> 01:32:36.110
<v Jamie Dunphy>Thank you, Councilor Kanal.

900
01:32:36.304 --> 01:32:36.994
<v Jamie Dunphy>Councilor Ryan.

901
01:32:38.552 --> 01:32:40.545
<v Unidentified speaker>Thank you.

902
01:32:40.802 --> 01:32:41.863
<v Dan Ryan>Thank you, Council President.

903
01:32:41.992 --> 01:32:46.125
<v Dan Ryan>I came in 15 minutes late and I— it felt like I came in an hour late.

904
01:32:46.594 --> 01:32:49.536
<v Dan Ryan>Um, so I hope that you were able to finish your presentation.

905
01:32:50.460 --> 01:32:56.722
<v Dan Ryan>Um, I think from listening to this, which has been a little bit challenging to track, um, 2 things I want to ask.

906
01:32:56.868 --> 01:33:04.337
<v Dan Ryan>One is I suddenly have a lot of concerns about our bond that's something that I try to pay attention to in such conversations.

907
01:33:06.079 --> 01:33:09.726
<v Dan Ryan>Do you have any concerns about it at this point with these numbers?

908
01:33:13.194 --> 01:33:14.567
<v Jonas Biery>Thank you, Councilor.

909
01:33:17.373 --> 01:33:25.559
<v Jonas Biery>From the seat I sit in, I always have concern about our bond rating, but I think I'm comfortable with this approach.

910
01:33:25.608 --> 01:33:33.404
<v Jonas Biery>I mean, we've communicated to the rating agencies at the the last conversation we had with them in 2025, the end of 2025, the reality.

911
01:33:33.470 --> 01:33:35.216
<v Jonas Biery>And so that was recognized in that rating.

912
01:33:35.313 --> 01:33:45.891
<v Jonas Biery>We're currently having a new 2026 iteration of that conversation, and we'll have those rating results here actually hopefully tomorrow or beginning of next week.

913
01:33:46.904 --> 01:33:59.541
<v Jonas Biery>And so I can't speak to that, but I think among the things they care deeply about are strong financial management and fund balances.

914
01:34:00.219 --> 01:34:02.252
<v Jonas Biery>And we score pretty well on the former.

915
01:34:03.170 --> 01:34:05.154
<v Jonas Biery>We're putting some of the latter at risk.

916
01:34:05.363 --> 01:34:08.798
<v Jonas Biery>I think that's a natural circumstance of where we are.

917
01:34:09.090 --> 01:34:11.137
<v Jonas Biery>And so we have to be really, really mindful of that.

918
01:34:12.750 --> 01:34:16.735
<v Jonas Biery>You know, they've certainly flagged that as a risk in their rating reports that they've provided us.

919
01:34:18.194 --> 01:34:21.595
<v Jonas Biery>So I think it's a long answer to your question.

920
01:34:21.644 --> 01:34:23.054
<v Jonas Biery>Short answer is yes.

921
01:34:23.572 --> 01:34:24.413
<v Jonas Biery>You know, it is something we have to be mindful of.

922
01:34:24.462 --> 01:34:24.576
<v Dan Ryan>Thank you.

923
01:34:25.560 --> 01:34:40.890
<v Jonas Biery>I think their understanding of the— the rating agencies are understanding of the financial environment and appreciative of the actions that we're taking to correct that without, you know, really doing ill-advised strategies.

924
01:34:42.037 --> 01:34:42.716
<v Dan Ryan>That's fair.

925
01:34:42.863 --> 01:34:43.476
<v Dan Ryan>Thank you, Jonas.

926
01:34:43.768 --> 01:34:46.332
<v Dan Ryan>I also know that we—.

927
01:34:46.574 --> 01:35:03.381
<v Unidentified speaker>Do we vote on this before we get the last revenue forecast so we'll know what the business tax We'll have an updated revenue forecast in a few weeks before you vote on this, and then the last revenue forecast this year will be the first week of May.

928
01:35:04.800 --> 01:35:13.407
<v Unidentified speaker>And so that will reflect any additional data that comes in during the kind of last 2 weeks of April when we get a lot of their return data.

929
01:35:14.292 --> 01:35:25.838
<v Unidentified speaker>So we can expect that we will have Yes, uh, the, the numbers on this slide are more or less what, what we would expect.

930
01:35:25.903 --> 01:35:28.349
<v Unidentified speaker>I don't know if you have specific questions, Peter can come up.

931
01:35:28.912 --> 01:35:31.779
<v Jonas Biery>Yeah, and maybe, Councilor, just flag, I think we'll have an updated forecast.

932
01:35:31.828 --> 01:35:38.350
<v Jonas Biery>Our indications are it won't probably be on net materially different than what we're seeing today.

933
01:35:38.418 --> 01:35:38.810
<v Jonas Biery>Is that fair?

934
01:35:41.051 --> 01:35:54.510
<v Unidentified speaker>Yeah, the— yeah, for, for the general fund for the current fiscal year, Okay, that's all, that's all I need at the moment.

935
01:35:55.069 --> 01:35:57.710
<v Dan Ryan>I, I couldn't track all of the amendments we should have passed.

936
01:35:57.710 --> 01:35:59.369
<v Dan Ryan>If that would have happened, then everything would have been better.

937
01:35:59.810 --> 01:36:02.270
<v Dan Ryan>Because that didn't happen, this is where we are.

938
01:36:02.369 --> 01:36:06.300
<v Dan Ryan>I just need to say it was difficult to track that as the conversation was going on.

939
01:36:06.789 --> 01:36:10.350
<v Dan Ryan>Um, and so I look forward to more dialogue with a couple of my colleagues.

940
01:36:10.350 --> 01:36:10.390
<v Dan Ryan>Thank you.

941
01:36:13.976 --> 01:36:14.282
<v Jonas Biery>Thanks.

942
01:36:14.451 --> 01:36:15.466
<v Jamie Dunphy>Thank you, Councilor Ryan.

943
01:36:17.567 --> 01:36:19.814
<v Jamie Dunphy>Seeing no one else in the queue, I'll ask my question.

944
01:36:20.719 --> 01:36:22.157
<v Jamie Dunphy>What more do you need from us at this stage?

945
01:36:23.908 --> 01:36:25.069
<v Jonas Biery>Yeah, great question.

946
01:36:25.118 --> 01:36:27.573
<v Jonas Biery>I was, uh, um, thank you, Council President.

947
01:36:28.185 --> 01:36:29.962
<v Jonas Biery>Um, this is a great conversation.

948
01:36:30.042 --> 01:36:31.689
<v Jonas Biery>I think we're, you know, we're mostly there.

949
01:36:32.060 --> 01:36:49.819
<v Jonas Biery>I guess the way I might frame the bodies of questions that would be helpful to identify One is, I think, at least kind of a nod of the head that the options that are up on the screen are generally acceptable and things that we can think about implementing into the actual ordinance document.

950
01:36:50.396 --> 01:36:57.368
<v Jonas Biery>I think we need— it'd be helpful to have a little bit of clarity, whatever that looks like, on the next body.

951
01:36:57.465 --> 01:36:59.569
<v Jonas Biery>How do we fill the remaining 6.6?

952
01:37:00.677 --> 01:37:05.175
<v Jonas Biery>And we don't have to have that necessarily today, but we'll need to know that certainly before we prepare the document.

953
01:37:06.538 --> 01:37:10.019
<v Jonas Biery>And then the third question I have is just around that timing, right?

954
01:37:10.083 --> 01:37:17.622
<v Jonas Biery>I mean, I hear Councilor Kanal, Chair of the Committee of the Whole, feedback about the challenge on that agenda.

955
01:37:18.264 --> 01:37:28.305
<v Jonas Biery>We do have some, I think, collective shared motivation to keep the technical adjustment ordinance on this schedule so it can be completed prior to the mayor's proposed.

956
01:37:28.835 --> 01:37:33.117
<v Jonas Biery>And there's only one meeting of the Committee of the Whole that fits that schedule.

957
01:37:33.567 --> 01:37:35.975
<v Jonas Biery>So that's the third piece I'd love feedback about.

958
01:37:36.216 --> 01:37:44.922
<v Jonas Biery>Is that something, a date we should be targeting, in which case we need to get documents really completed here in the next couple of weeks, or are we moving to that first council date?

959
01:37:45.020 --> 01:37:53.501
<v Jonas Biery>So I don't know if you want to take a pause, but those are the kind of 3, I think, pieces of feedback that would be really helpful to get from you all today.

960
01:37:53.837 --> 01:37:54.384
<v Jamie Dunphy>Okay, great.

961
01:37:54.545 --> 01:37:58.625
<v Jamie Dunphy>Colleagues, we have some additional things to weigh in on, so folks want to jump into the queue?

962
01:38:00.953 --> 01:38:02.125
<v Loretta Smith>Thank you, Council President.

963
01:38:02.960 --> 01:38:04.292
<v Loretta Smith>Thank you for the presentation.

964
01:38:05.304 --> 01:38:11.405
<v Loretta Smith>I think I sent you and Ruth, City Administrator, an email.

965
01:38:11.806 --> 01:38:24.171
<v Loretta Smith>I do not support your suggested cuts specifically for the council, for the council, and specifically I can say for me, um, we're going to spend our budget.

966
01:38:25.841 --> 01:38:29.115
<v Loretta Smith>And I appreciate if you take mine out of your calculation.

967
01:38:30.432 --> 01:38:32.150
<v Jonas Biery>Yeah, thank you, Councilor.

968
01:38:32.198 --> 01:38:32.985
<v Jonas Biery>We'll look at that email.

969
01:38:33.082 --> 01:38:37.802
<v Jonas Biery>And I would just say, I think to Ruth's point earlier, I know that there's work done to look at each individual budget.

970
01:38:37.899 --> 01:38:42.458
<v Jonas Biery>And so if that's the expectation, then that should be what you expected in that proposal.

971
01:38:42.619 --> 01:38:49.572
<v Loretta Smith>We should expect that we're gonna spend our entire budget.

972
01:38:49.604 --> 01:38:49.974
<v Olivia Clark>I also gave you a suggestion.

973
01:38:50.345 --> 01:38:56.979
<v Loretta Smith>To look into the materials and services budget in the city administrator's budget.

974
01:38:57.787 --> 01:39:01.479
<v Loretta Smith>I think you all had a $55 million, uh, beginning balance.

975
01:39:07.346 --> 01:39:08.744
<v Unidentified speaker>Uh, we'll look into it.

976
01:39:08.809 --> 01:39:15.942
<v Unidentified speaker>The beg— the, um, I'm not, I'm not sure what the beginning fund balance is that you're talking about.

977
01:39:16.038 --> 01:39:23.867
<v Unidentified speaker>And reminder that we're just looking at the general fund right now and anything that would be, you know, it was due I think they had a—.

978
01:39:24.828 --> 01:39:27.601
<v Loretta Smith>At July 1st, they had a carryover of $55 million.

979
01:39:28.498 --> 01:39:29.829
<v Unidentified speaker>I'll look into that.

980
01:39:30.838 --> 01:39:34.462
<v Unidentified speaker>Yeah, I don't know it off the top of my head, but yeah, we can certainly put that on the list.

981
01:39:34.525 --> 01:39:40.600
<v Unidentified speaker>And I'm hearing a lot of interest in looking generally at the encumbrance carryovers from the fall.

982
01:39:40.697 --> 01:39:45.922
<v Unidentified speaker>So we will certainly pull up that detailed list and get information from folks on where those stand.

983
01:39:47.092 --> 01:39:48.582
<v Unidentified speaker>And we will check on that.

984
01:39:48.792 --> 01:39:50.412
<v Unidentified speaker>Specifically on City Administrator with that.

985
01:39:50.460 --> 01:39:50.572
<v Unidentified speaker>Thank you.

986
01:39:50.636 --> 01:39:50.893
<v Candace Avalos>Thank you.

987
01:39:50.957 --> 01:39:54.438
<v Loretta Smith>Because I noticed you didn't take anything out of the mayor's budget either, but you took council's out.

988
01:39:54.582 --> 01:39:56.444
<v Loretta Smith>So you need to be really fair.

989
01:39:57.132 --> 01:40:01.079
<v Loretta Smith>But the other issue is I think you just need to do a constraint across the board.

990
01:40:01.304 --> 01:40:06.132
<v Loretta Smith>Just do a 1% constraint and then you'll get your money.

991
01:40:06.597 --> 01:40:06.822
<v Olivia Clark>This—.

992
01:40:06.822 --> 01:40:18.378
<v Loretta Smith>I've never seen this nitpicking of a way to get money and picking individual offices and departments to take money from in the, in the current fiscal year.

993
01:40:18.427 --> 01:40:21.761
<v Loretta Smith>Not for next year, but for the current fiscal year.

994
01:40:22.698 --> 01:40:39.862
<v Loretta Smith>We have either been getting bad advice from you, and we should not be getting it anymore, because for you to ask us to take budget money out of this year, and we're in March already, I would say we've been given bad advice.

995
01:40:40.139 --> 01:40:51.889
<v Loretta Smith>Councilor and generally people do just the constraint, period, to, to figure out the whole.

996
01:40:52.502 --> 01:40:56.917
<v Loretta Smith>This— you're making this so much harder than you really need to, in my opinion.

997
01:40:58.179 --> 01:41:00.411
<v Loretta Smith>I don't know what kind of direction you've been getting.

998
01:41:00.604 --> 01:41:05.585
<v Loretta Smith>I don't know where this direction came from, but it is not the direction that I would have given you.

999
01:41:07.460 --> 01:41:09.641
<v Unidentified speaker>Sorry, just one point of clarification.

1000
01:41:09.930 --> 01:41:14.007
<v Unidentified speaker>The mayor's projected underspending is counted in here.

1001
01:41:14.087 --> 01:41:15.307
<v Unidentified speaker>I just didn't pull it out.

1002
01:41:15.387 --> 01:41:21.775
<v Unidentified speaker>So we, we pulled out, uh, council offices and the auditor's office, but we didn't pull out the mayor's office.

1003
01:41:21.872 --> 01:41:23.573
<v Unidentified speaker>We're just assuming it gets returned.

1004
01:41:23.894 --> 01:41:25.851
<v Loretta Smith>So put it down like you do everybody else's.

1005
01:41:25.900 --> 01:41:27.970
<v Loretta Smith>Don't make any disc— don't do this.

1006
01:41:28.067 --> 01:41:31.918
<v Loretta Smith>Don't malign us while you protect the mayor's office and his budget.

1007
01:41:32.400 --> 01:41:33.637
<v Loretta Smith>Don't do that.

1008
01:41:33.980 --> 01:41:35.926
<v Loretta Smith>That is not fair at all.

1009
01:41:36.189 --> 01:41:37.137
<v Loretta Smith>Just do a constraint.

1010
01:41:38.250 --> 01:41:39.824
<v Loretta Smith>Could you go back for, for me?

1011
01:41:39.889 --> 01:41:51.051
<v Loretta Smith>I don't know if you work for me or you work for the mayor, but if you could go back and just do a 1% constraint or a 0.05% constraint and see what that looks like across the board.

1012
01:41:52.641 --> 01:41:58.354
<v Unidentified speaker>So, I mean, I think that's a question for you all, is, you know, is it sound—.

1013
01:41:58.354 --> 01:41:59.387
<v Loretta Smith>I can't ask you anything.

1014
01:41:59.988 --> 01:42:00.666
<v Loretta Smith>You say you are.

1015
01:42:00.956 --> 01:42:03.422
<v Loretta Smith>I'm, I'm asking you, can you please do that for me?

1016
01:42:03.793 --> 01:42:04.744
<v Unidentified speaker>And tell you the amount?

1017
01:42:05.341 --> 01:42:06.448
<v Loretta Smith>Yes, certainly.

1018
01:42:06.497 --> 01:42:07.149
<v Unidentified speaker>Please do that.

1019
01:42:07.262 --> 01:42:07.817
<v Unidentified speaker>Yes, please.

1020
01:42:07.930 --> 01:42:08.190
<v Loretta Smith>Thank you.

1021
01:42:08.256 --> 01:42:09.608
<v Loretta Smith>Put that up as the option.

1022
01:42:12.556 --> 01:42:13.331
<v Jamie Dunphy>Thank you, Councilor Smith.

1023
01:42:14.315 --> 01:42:14.864
<v Jamie Dunphy>Councilor Green.

1024
01:42:17.318 --> 01:42:26.958
<v Mitch Green>I, I got in the queue because I was just going to ask my colleagues if they would tolerate considering a $2.2 million cut to council offices because I don't want to waste any time.

1025
01:42:27.104 --> 01:42:27.895
<v Mitch Green>I think I know the answer.

1026
01:42:28.621 --> 01:42:33.123
<v Mitch Green>I know personally I don't really got the bandwidth, so just trying to be helpful here.

1027
01:42:35.569 --> 01:42:37.951
<v Mitch Green>I guess I don't need to— yeah, I'm done.

1028
01:42:38.228 --> 01:42:39.940
<v Mitch Green>I just wanted to know what you guys thought.

1029
01:42:40.023 --> 01:42:41.148
<v Mitch Green>I think I've got my answer.

1030
01:42:42.640 --> 01:42:46.070
<v Jamie Dunphy>Okay, colleagues, I did promise we were going to take a bio break.

1031
01:42:46.698 --> 01:42:52.734
<v Jamie Dunphy>It being 3:40, I'm actually 10 minutes past, but I also note it kind of feels like we are starting to see the end.

1032
01:42:52.846 --> 01:42:55.079
<v Jamie Dunphy>Would folks rather we barrel through and maybe end early?

1033
01:42:55.372 --> 01:42:56.083
<v Jamie Dunphy>Okay, great.

1034
01:42:56.229 --> 01:42:57.831
<v Jamie Dunphy>Councilor Pirtle-Guiney.

1035
01:42:59.222 --> 01:43:00.259
<v Elana Pirtle-Guiney>Thank you, Council President.

1036
01:43:00.868 --> 01:43:09.521
<v Elana Pirtle-Guiney>In answer to the questions that you asked, I am prepared to need to support everything on your first slide.

1037
01:43:11.166 --> 01:43:18.060
<v Elana Pirtle-Guiney>There are things there where I, I think there might be other options that I would like more, but I am prepared Councilor Smith.

1038
01:43:18.125 --> 01:43:18.979
<v Elana Pirtle-Guiney>I am not prepared to support all of these.

1039
01:43:19.817 --> 01:43:30.761
<v Elana Pirtle-Guiney>I am not prepared to support a loan from our funds for the— out of the CORF, given what I see as our fiscal realities for the next few years.

1040
01:43:31.426 --> 01:43:47.257
<v Elana Pirtle-Guiney>If we were looking at a one-time need and then a flush year 2 years from now where I had assurances that— I guess not assurances, but belief that there was a good chance that we could repay it quickly, I may have a different answer there.

1041
01:43:47.631 --> 01:43:51.167
<v Elana Pirtle-Guiney>But in our current fiscal situation, that is not something that I am comfortable doing.

1042
01:43:55.704 --> 01:44:00.894
<v Elana Pirtle-Guiney>If we get really stuck and we're talking about $500,000, something like that, I'm willing to reconsider that.

1043
01:44:01.006 --> 01:44:06.118
<v Elana Pirtle-Guiney>But I'm certainly not willing to vote for that at the $7 million level or anything close to it.

1044
01:44:06.939 --> 01:44:15.248
<v Elana Pirtle-Guiney>I would be interested in seeing if there are things that the mayor will be cutting next year anyway that we could cut now, even if it's not significant savings.

1045
01:44:15.921 --> 01:44:24.033
<v Elana Pirtle-Guiney>2 Months starts and helps to replace some of the funds that you're hearing from us on that second slide we're not interested in.

1046
01:44:24.802 --> 01:44:27.239
<v Elana Pirtle-Guiney>And I think it would be good for us to look at that.

1047
01:44:27.703 --> 01:44:45.310
<v Elana Pirtle-Guiney>I believe that my team has updated our numbers recently with our, with our support staff who are looking at our budget, and my I don't know how much you've pulled from each office in that $2.2 million.

1048
01:44:45.310 --> 01:44:52.039
<v Elana Pirtle-Guiney>I am happy to work with the internal teams to make sure that the numbers from my office are accurate though, so that you have an accurate read there.

1049
01:44:52.470 --> 01:44:53.710
<v Elana Pirtle-Guiney>Thank you.

1050
01:44:53.710 --> 01:44:55.550
<v Jamie Dunphy>Thank you, Councilor Pirtle-Guiney.

1051
01:44:55.550 --> 01:44:57.010
<v Jamie Dunphy>Councilor Kanal.

1052
01:44:57.010 --> 01:44:58.789
<v Sameer Kanal>Thanks, I appreciate that.

1053
01:44:58.789 --> 01:45:01.310
<v Sameer Kanal>And it's your question that led to this, Councilor Dunphy.

1054
01:45:01.310 --> 01:45:02.630
<v Steve Novick>No, it's, uh, I think it's really good that we're having I this think conversation.

1055
01:45:02.716 --> 01:45:04.639
<v Sameer Kanal>It's really good that we're having this conversation.

1056
01:45:04.798 --> 01:45:12.154
<v Sameer Kanal>When, when you asked, um, when you verbally asked what— whether or not we were prepared to support what's on the slide, the slide was changing.

1057
01:45:12.282 --> 01:45:13.899
<v Sameer Kanal>So I'm going to be super clear here.

1058
01:45:14.493 --> 01:45:21.046
<v Sameer Kanal>I am also prepared to support what's on the first slide, the one that starts with the unrestricted general fund contingency.

1059
01:45:21.479 --> 01:45:28.016
<v Sameer Kanal>I think the second slide has clearly at least one councilor on 2 different things that are non-starters for them, and I, I think that's good.

1060
01:45:28.273 --> 01:45:36.560
<v Sameer Kanal>I, I also would like to see I'm interested in Councilor Dan Ryan's request to see for the remaining unspent money what a constraint across the board would look like just from a percentage perspective.

1061
01:45:36.739 --> 01:45:44.760
<v Sameer Kanal>I'm also interested in Councilor Pirtle-Guiney's request of trying to see if we can scale down something that's going to get cut anyway, theoretically, a little earlier.

1062
01:45:46.500 --> 01:46:03.610
<v Sameer Kanal>I am more open, I think, on the loan from the CORF, given the piece that you, Ruth, said earlier about how it is an ongoing replenishment that's already built in, um, and, and that's already projected, that helps put my mind at ease.

1063
01:46:03.722 --> 01:46:06.661
<v Sameer Kanal>I wouldn't want to do the whole 7, um, either.

1064
01:46:06.902 --> 01:46:11.719
<v Sameer Kanal>So, um, but I'm a little more open to, to that particular piece of the conversation.

1065
01:46:12.569 --> 01:46:16.488
<v Sameer Kanal>And then, um, finally, I can't find—.

1066
01:46:16.568 --> 01:46:16.761
<v Dan Ryan>Here we go.

1067
01:46:17.371 --> 01:46:39.025
<v Sameer Kanal>Um, I am— I'm also still pretty interested in looking at the, the targeted bureau reductions beyond beyond what's in this particular list, just because there's some things that can be potentially cut next year that maybe the mayor would know as he develops his budget.

1068
01:46:39.284 --> 01:46:45.179
<v Sameer Kanal>There's some things that the bureaus can put up, but there's also some things that maybe are outside of that universe that are worth exploring too.

1069
01:46:45.600 --> 01:46:49.774
<v Sameer Kanal>It's hard to say, I don't know what I, you know, we don't know what we don't know, but— I think that's fair.

1070
01:46:50.283 --> 01:46:53.235
<v Sameer Kanal>I think more options are helpful in that, and I just wanted to offer 2.

1071
01:46:53.877 --> 01:46:54.615
<v Sameer Kanal>So thank you.

1072
01:46:55.001 --> 01:46:56.237
<v Jamie Dunphy>Thank you, Councilor Knoll.

1073
01:46:56.301 --> 01:46:57.006
<v Jamie Dunphy>Vice President Clark.

1074
01:46:57.744 --> 01:46:59.318
<v Olivia Clark>Thank you, Councilor President.

1075
01:46:59.511 --> 01:47:03.009
<v Olivia Clark>Ditto on the first $11.4 million, all good.

1076
01:47:03.297 --> 01:47:03.876
<v Olivia Clark>I'm good with that.

1077
01:47:04.550 --> 01:47:08.466
<v Olivia Clark>On making up the next $6.6 million, I'd be fine to take it all from housing.

1078
01:47:08.675 --> 01:47:21.506
<v Olivia Clark>If not, if that's not possible, take, you know, some portion of the Harbor Reserve, although we're going to have to make that up someday, so we're just kicking the can.

1079
01:47:22.101 --> 01:47:26.256
<v Olivia Clark>But I definitely don't want the targeted bureau reductions or the council underspending.

1080
01:47:26.774 --> 01:47:32.164
<v Olivia Clark>And I am curious about, uh, Councilor Smith's 1% constraint, just to see what that would look like.

1081
01:47:32.341 --> 01:47:34.667
<v Olivia Clark>But that's all I have to offer, but thank you.

1082
01:47:35.475 --> 01:47:36.865
<v Jamie Dunphy>Thank you, Vice President Clark.

1083
01:47:37.109 --> 01:47:37.755
<v Jamie Dunphy>Councilor Novick.

1084
01:47:39.436 --> 01:47:41.846
<v Steve Novick>Um, I agree with Councilor Pirtle-Guiney.

1085
01:47:41.895 --> 01:47:57.594
<v Steve Novick>I'm very worried about dipping into the, the core and I also agree with Councilor Bertolucci that if we're— since we know we're going to have to be making some cuts next year, real cuts, then if we can identify some that we know we're going to be making, we might as well start making them now.

1086
01:47:58.347 --> 01:48:07.542
<v Steve Novick>And here, actually, I would ask the mayor, um, I assume that at this point in your budget development process, you've already identified some cuts for next year.

1087
01:48:08.296 --> 01:48:16.623
<v Steve Novick>And if you're willing to put some of them on the table, say look, here are things I know I definitely am going to cut, then we could start cutting them now instead of waiting for a couple of months.

1088
01:48:18.949 --> 01:48:26.051
<v Steve Novick>And finally, on the targeted reductions, I think I missed how were those arrived at.

1089
01:48:26.115 --> 01:48:31.855
<v Steve Novick>Was each bureau given some sort of rubric to work, to run through and require to come up with something?

1090
01:48:32.065 --> 01:48:35.149
<v Steve Novick>Or is it more, hey, bureaus, are there things, EMS stuff you could cut?

1091
01:48:35.295 --> 01:48:35.795
<v Steve Novick>Let us know.

1092
01:48:37.202 --> 01:48:39.970
<v Steve Novick>And just curious how that $1.8 million was arrived at.

1093
01:48:40.520 --> 01:48:41.493
<v Unidentified speaker>You want to speak to that?

1094
01:48:43.100 --> 01:48:43.997
<v Jonas Biery>The $1.2 million?

1095
01:48:44.046 --> 01:48:47.639
<v Unidentified speaker>The $1.8— the, um, the purchase order closing POS?

1096
01:48:49.216 --> 01:48:49.537
<v Unidentified speaker>Oh sure, yeah.

1097
01:48:49.634 --> 01:49:10.787
<v Unidentified speaker>So, um, we got to the $1.8 million number by pulling all city encumbrances over $100,000 that's currently in our system, and we asked bureaus to review We reviewed each purchase order based on a series of questions similar to what you all saw in the fall TAO.

1098
01:49:11.349 --> 01:49:14.881
<v Unidentified speaker>So questions like, what's the justification for this work?

1099
01:49:15.266 --> 01:49:17.771
<v Unidentified speaker>What is— what could be stopped?

1100
01:49:17.931 --> 01:49:19.875
<v Unidentified speaker>What could be— like, what could be canceled?

1101
01:49:19.939 --> 01:49:21.962
<v Unidentified speaker>What could be paused and maybe delayed to next year?

1102
01:49:22.989 --> 01:49:39.289
<v Unidentified speaker>And then we asked for possible— like, what the net savings would be if again, we looked at purchase orders over $100,000 just to make sure the juice was worth the squeeze for the exercise.

1103
01:49:39.680 --> 01:49:45.199
<v Steve Novick>So does the $1.8 million represent all of the— I mean, how did you pick which ones to go with?

1104
01:49:45.199 --> 01:49:52.300
<v Steve Novick>Was it based on the bureau's recommendation, yes, this is what we can live with, or was it based on just your analysis saying, all right, based on what they've told us, this is what we think they can live with?

1105
01:49:53.720 --> 01:49:55.500
<v Unidentified speaker>I think it was all of the ones where they said they said could live with it.

1106
01:49:56.078 --> 01:49:58.552
<v Unidentified speaker>That, that it could be stopped or paused.

1107
01:49:58.974 --> 01:50:00.364
<v Steve Novick>Okay, thank you.

1108
01:50:02.144 --> 01:50:03.497
<v Jamie Dunphy>Thank you, Councilor Novick.

1109
01:50:03.675 --> 01:50:04.365
<v Jamie Dunphy>Councilor Ryan.

1110
01:50:05.202 --> 01:50:07.338
<v Unidentified speaker>Thank you.

1111
01:50:08.962 --> 01:50:09.926
<v Dan Ryan>Thank you, Council President.

1112
01:50:10.167 --> 01:50:19.195
<v Dan Ryan>Um, I just wanted to say that I'm uncomfortable with any, uh, cuts to any, uh, dipping further into any reserves.

1113
01:50:20.020 --> 01:50:21.088
<v Dan Ryan>Um, our rainy day is here.

1114
01:50:22.453 --> 01:50:28.109
<v Dan Ryan>Sadly, and there's no economic report that I've seen that says we're going to get out of this in the next 6 months to a year.

1115
01:50:28.639 --> 01:50:32.278
<v Dan Ryan>So I just wanted to underscore the points I've been hearing from a couple of my colleagues.

1116
01:50:32.668 --> 01:50:33.091
<v Olivia Clark>Thank you.

1117
01:50:33.789 --> 01:50:35.724
<v Jamie Dunphy>Thank you, Councilor Ryan.

1118
01:50:38.439 --> 01:50:44.350
<v Jamie Dunphy>Colleagues, seeing no one else in the queue— oh, I see, you just have to say that and then they get back in the queue.

1119
01:50:44.430 --> 01:50:45.157
<v Jamie Dunphy>That's how we do it.

1120
01:50:45.496 --> 01:50:46.932
<v Steve Novick>Mr. President, I probably—.

1121
01:50:46.932 --> 01:50:47.095
<v Jonas Biery>Yeah.

1122
01:50:47.810 --> 01:50:47.826
<v Candace Avalos>I—.

1123
01:50:48.055 --> 01:50:51.173
<v Steve Novick>Maybe this goes without saying, but of course I'm always up for cutting council office budgets.

1124
01:50:53.554 --> 01:50:54.248
<v Jamie Dunphy>And Councilor Green?

1125
01:50:54.587 --> 01:50:55.979
<v Dan Ryan>I'm in the same page with that.

1126
01:50:56.382 --> 01:50:58.564
<v Dan Ryan>I didn't want Mitch or Councilor Novick to think they're alone.

1127
01:50:58.791 --> 01:50:59.050
<v Dan Ryan>Thanks.

1128
01:51:01.619 --> 01:51:02.024
<v Jamie Dunphy>Councilor Green.

1129
01:51:03.170 --> 01:51:03.412
<v Mitch Green>Thanks.

1130
01:51:04.284 --> 01:51:06.448
<v Mitch Green>For the record, I'm not trying to cut council offices.

1131
01:51:08.975 --> 01:51:17.541
<v Mitch Green>No, I just want to note that the general reserve fund The general fund reserve fund is for triggering in a rainy day.

1132
01:51:18.673 --> 01:51:21.635
<v Mitch Green>So you trigger it when you're in a recession.

1133
01:51:22.460 --> 01:51:23.560
<v Mitch Green>I don't think we should do that.

1134
01:51:23.625 --> 01:51:24.439
<v Mitch Green>I want to be very clear.

1135
01:51:24.505 --> 01:51:27.591
<v Mitch Green>But I just want to note that that's what that is for.

1136
01:51:29.072 --> 01:51:30.164
<v Mitch Green>It's not for flush times.

1137
01:51:31.627 --> 01:51:32.414
<v Jamie Dunphy>Thank you, Councilor Green.

1138
01:51:32.769 --> 01:51:33.380
<v Jamie Dunphy>Councilor Avalos.

1139
01:51:34.279 --> 01:51:40.260
<v Candace Avalos>Just because it keeps coming up, I also do not support cutting the council budget, our council budgets.

1140
01:51:40.649 --> 01:51:42.088
<v Candace Avalos>And I mean that very seriously.

1141
01:51:42.439 --> 01:51:44.541
<v Candace Avalos>I work really hard to use all of my budget.

1142
01:51:44.621 --> 01:51:45.777
<v Candace Avalos>I've been putting it in community.

1143
01:51:45.921 --> 01:51:47.364
<v Candace Avalos>We put on a lot of events.

1144
01:51:48.230 --> 01:51:50.189
<v Candace Avalos>We provide childcare and food at those events.

1145
01:51:50.252 --> 01:51:51.103
<v Candace Avalos>That costs a lot of money.

1146
01:51:51.761 --> 01:51:56.398
<v Candace Avalos>I also have 5 staff, and I have those staff because they have to execute all of my programs.

1147
01:51:56.654 --> 01:51:59.525
<v Candace Avalos>And we've got our District 1 office opening up soon.

1148
01:52:00.039 --> 01:52:14.240
<v Candace Avalos>So on a serious note, I know it's been mentioned in a joking way, but I talked with the budget office about this, like the— like not this budget office, But when they were talking about my budget and they were like, your budget is one of the ones that you're using almost every single penny.

1149
01:52:14.354 --> 01:52:17.889
<v Candace Avalos>And so if y'all's budgets get cut, you're going to have to cut staff.

1150
01:52:18.002 --> 01:52:20.045
<v Candace Avalos>So I'm telling you that seriously, please do not do that.

1151
01:52:20.498 --> 01:52:22.087
<v Candace Avalos>I need my staff and I need my programs.

1152
01:52:23.842 --> 01:52:32.751
<v Candace Avalos>And I also will just say, as it relates to doing, you know, across-the-board cuts, I know that sounds easier, but it's not.

1153
01:52:32.996 --> 01:52:34.542
<v Candace Avalos>I don't think that that's the right option.

1154
01:52:34.640 --> 01:52:40.569
<v Candace Avalos>I think that providing targeted cuts to things that, you know, need to be cut, for example, or overspends.

1155
01:52:40.618 --> 01:52:53.079
<v Candace Avalos>Like, that is a more equitable way to go about it, because once you start doing across-the-board cuts, then budgets that are already running on thin margins have to go under, while budgets that are, uh, in surplus, um, they get off easy.

1156
01:52:53.417 --> 01:52:58.921
<v Candace Avalos>And, um, these are hard decisions, and so making a 1% cut is the easy route, and I don't want to take that route.

1157
01:52:59.310 --> 01:52:59.600
<v Elana Pirtle-Guiney>Thanks.

1158
01:53:02.319 --> 01:53:03.936
<v Jamie Dunphy>Thank you all so much for being here today.

1159
01:53:04.002 --> 01:53:05.198
<v Jamie Dunphy>Thank you, colleagues, for a good discussion.

1160
01:53:07.538 --> 01:53:09.240
<v Jamie Dunphy>Did you get enough what you need at this moment?

1161
01:53:09.529 --> 01:53:13.703
<v Unidentified speaker>Yeah, I think the only other question I just want to circle back on is process.

1162
01:53:13.801 --> 01:53:25.649
<v Unidentified speaker>I mean, I think we have certainly have enough to go on to bring forward a proposal, and we can follow up with, with you and Councilor Kanal on whether we should come back, try to come back that last week of March, first week of April.

1163
01:53:25.987 --> 01:53:31.590
<v Jamie Dunphy>Yeah, we will treat this with as much urgency as it deserves, and we will figure it out with our really stupid schedule.

1164
01:53:31.703 --> 01:53:34.556
<v Jamie Dunphy>So, colleagues, with that, we are adjourned.